2202L5JE-DA-C5-N_2015.05.
Table of Contents
Compound 2-stage Screw Compressor 1612LSC Speed Increaser Type
viii
5.4.10.1 Disassembly..............................................................................................5-29
5.4.10.2 Inspection ..................................................................................................5-30
5.4.11 High-stage Suction Cover and Side Bearings...................................................5-31
5.4.11.1 Disassembly ..............................................................................................5-31
5.4.11.2 Inspection .................................................................................................. 5-31
5.4.12 Low-stage Suction Cover and Side Bearings....................................................5-32
5.4.12.1 Disassembly..............................................................................................5-32
5.4.12.2 Inspection ..................................................................................................5-33
5.4.13 Thrust Bearings Block........................................................................................ 5-34
5.4.13.1 Disassembly of High-stage Thrust Bearing block......................................5-34
5.4.13.2 Disassembly of Low-stage Thrust Bearing block ......................................5-35
5.4.13.3 Inspection (High-stage/Low-stage)............................................................5-36
5.4.14 High-stage Rotors and Main Rotor Casing........................................................5-37
5.4.14.1 Disassembly..............................................................................................5-37
5.4.14.2 Inspection ..................................................................................................5-37
5.4.15 Low-stage Rotors and Main Rotor Casing.........................................................5-38
5.4.16 High-stage Bearing Head and Main Bearings................................................... 5-39
5.4.16.1 Disassembly..............................................................................................5-39
5.4.16.2 Inspection ..................................................................................................5-39
5.4.17 Low-stage Bearing Head and Main Bearings....................................................5-40
5.4.17.1 Disassembly..............................................................................................5-40
5.4.17.2 Inspection ..................................................................................................5-40
5.4.18 Low-stage Unloader Slide Valve and Guide Block............................................5-41
5.4.18.1 Disassembly..............................................................................................5-41
5.4.18.2 Inspection ..................................................................................................5-41
5.5 Reassembly................................................................................................5-42
5.5.1 Low-stage Unloader Slide Valve and Guide Block............................................5-44
5.5.2 Bearing Head and Rotor Casing........................................................................5-45
5.5.3 Bearing Head and Main Bearings......................................................................5-46
5.5.4 Rotor Assembly .................................................................................................5-47
5.5.5 Suction Cover and Side Bearings......................................................................5-48
5.5.6 Thrust Bearing Block (....................................................................................... 5-50
5.5.6.1 End Clearance Measurement....................................................................5-52
5.5.6.2 End Clearance Adjustment Method........................................................... 5-54
5.5.6.3 Tightening after End Clearance Adjustment ............................................. 5-54
5.5.7 Combining High-stage and Low-stage Blocks................................................... 5-55
5.5.8 Balance Piston Cover........................................................................................ 5-57
5.5.9 Speed Increaser Gear Block..............................................................................5-58
5.5.10 Installation of Speed Increaser Gear Casing to Low-stage Bearing Head........ 5-61
5.5.11 Unloader Cylinder and Unloader Piston............................................................5-63
5.5.12 Unloader Cover..................................................................................................5-65
5.5.13 Shaft Seal Block ................................................................................................5-66
5.5.14 Unloader Indicator .............................................................................................5-69
5.5.14.1 Potentiometer............................................................................................5-70
5.5.14.2 Micro-switch............................................................................................... 5-70
5.5.14.3 Assembly and Adjustment......................................................................... 5-71