Nibe ESV 20 User manual

DE
GB
SE MONTERINGSANVISNING ESV 20 EXTRA SHUNT
TILL FIGHTER 360P / FIGHTER 1130 / FIGHTER 1230 / VVM 240 / VVM 300
INSTALLATION INSTRUCTIONS ESV 20 EXTRA SHUNT
FOR FIGHTER 360P / FIGHTER 1120 / FIGHTER 1220 / VVM 240 / VVM 300
MONTAGEANWEISUNG ESV 20 EXTRA MISCHVENTIL
IM FIGHTER 360P / FIGHTER 1120 / FIGHTER 1220 / VVM 240 / VVM 300
LEK
LEK
GRUNDFOS
Typ e UPS 25 - 60 130 P/N:59526447
230V-
HEJSAN
PC;0017NIB
DK
50Hz
IP 44
TF 110
Class H
Max. 10bar
2.5uF
45
0.20
65
0.30
90
0.40
1m(A) P, ( W )
MAV 0702-6
ESV 20
411546
MONTERINGSANVISNING
ESV 20


Detta tillbehör används då FIGHTER 360P / 1130
/ 1230 eller VVM 240 / 300 installeras i hus med två
olika värmesystem som kräver olika framlednings-
temperaturer, exempelvis i fall då huset har både
radiatorsystem och golvvärmesystem. I nedanstående
text avser värmesystem 1 det system som kräver
den högre temperaturen och som kopplas in till den
ordinarie framlednings- respektive returledningsanslu
tningen.
Värmesystem 2 avser det värmesystem som arbetar
med lägre temperatur.
Vattenflödet i de två värmesystemen tillsammans bör
ej överstiga 1700 l/h.
Sifferbeteckningar i följande text refererar till avsnittet
“Komponentplacering” samt aktuell ”Monterings- och
Skötselanvisning” för FIGHTER 360P / 1130 / 1230
eller VVM 240 / 300.
Allmänt
ESV 20
1 st rör med rak koppling
1 st värmebärarpump med kabel
2 st avstängningsventiler
1 st shuntventil med motor
1 st 5-ledarkabel
1 st reläkort med kablage
2 st temperaturgivare
1 st kablage, kantkontakt
4 st rundstiftshylsor
1 st kopplingsdosa
1 st isoleringstejp
LEK
Innehåll
SE 1
SE

LEK
+2
0
-2
ABABAB
IIIIIIIIIIII
ESV 20
FIGHTER 360P
2
SE
Montering sker enligt följande.
■ Töm först pannvattenkärlet om detta är vattenfyllt.
Skruva bort pluggen (61) i FIGHTER 360P´s
bottengavel. Montera det medföljande plaströret
där pluggen tidigare var placerad.
Röranslutning
■Den extra värmebärarpumpen (VBP2) och
shuntventilen (SV-V2) placeras på lämplig plats
utanför FIGHTER 360P. Från kopplingen på det
monterade plaströret dras rör till shuntventilen.
Returledningen från värmesystem 2 kopplas
till shuntventilen samt till returledningen från
värmesystem 1, se bild.
■De två medföljande temperaturgivarna monteras i
anslutning till värmesystem 2 enligt bild.
Framledningsgivaren (FG2) monteras på röret
mellan shuntventilen och värmebärarpumpen
(VBP2).
Returledningsgivaren (RG2) monteras på röret från
värmesystem 2.
■Vid montering skall kontaktpasta samt isolering runt
givaren och röret användas för att erhålla korrekt
temperaturmätning. OBS! Vid felaktig montering
kan funktionen äventyras.
LEK
61
Värmesystem 2 Värmesystem 1
61
SV-V2
FG2
VBP2
RG2
AV
AV
LEK
LEK
Retur
Värmepump Framledning
AV Avstängningsventil
FG2 Framledningsgivare 2
RG2 Returgivare 2
SV-V2 Shuntventil 2
VBP2 Värmebärarpump 2

Blå
M
Brun
Gul/Grön
Brun Blå
Brun
Brun
Svart
Gul/
Grön
Vit
Vit
Blå
Gul/Grön
Blå Vit
Brun
Svart
Shuntmotor Värmebärarpump
Kopplingsdosa
5-ledarkabel
Till ledigt
jordstift
Till ledig noll-position på
kompressorkondensator (28)
Till position 10
på plint (22)
Re
37
39
40
41
42
38
Re
Re
FIGHTER 360P 3
SE
ESV 20
Det medföljande reläkortet monteras på det befintliga
reläkortet (29) med hjälp av plasttornen. Den bruna
kabelns lösa ände kopplas in på position 10 på plint
(22) till fläkttransformatorn.
Se avsnitt “Komponentplacering” för positioner.
Kantkontaktkablaget kopplas in mellan det medföljande
reläkortet och reläkort (29) enligt vidstående bild.
5-ledarkabeln kopplas in enligt följande:
■ Blå ledare till ledig noll-position på
kompressorkondensatorn (28).
■ Brun ledare till position 40 på det nya reläkortet.
■ Svart ledare till position 42 på det nya reläkortet.
■ Vit ledare till position 38 på det nya reläkortet.
■ Jordledare (gul/grön) till ledigt jordstift på kopplings-
plinten till vänster om kompressorkondensatorn.
Den andra änden på 5-ledarkabeln, shuntmotorn
och värmebärarpumpen kopplas in i kopplingsdosan
enligt nedanstående bild. Kopplingsdosan monteras
lämpligen på väggen.
Givarna kopplas in med två-ledare (exempelvis EKXX
eller LiYY) enligt följande:
Den givare som används som framledningsgivare 2
ansluts till position 7 och 8 på effektvaktskortets (2)
nedre plint.
Returgivare 2 kopplas in till position 5 och 6 på samma
kort.
Använd medföljande rundstiftshylsor för skarvning
mellan två-ledaren och givaren.
Elanslutning
HAHN
LEK
OBS!
All elektrisk inkoppling skall ske av
behörig elektriker
■Välj “Service” i meny 8.1.1 för att få tillgång till meny
9.0 och dess undermenyer.
■Välj sedan “Till” i meny 9.1.2, “Shuntgrupp 2”.
Därmed är meny 3.0 och dess undermenyer
åtkomliga.
■I undermenyerna ställs nu värmekurva,
parallellförskjutning samt min- och maxnivåer
in för värmesystem 2 på samma sätt som för
värmesystem 1 under meny 2.0.
Se också “Monterings- och skötselanvisning” för
FIGHTER 360P.
Inställning
FIGHTER 360P
EXTERNT
4X4.1
X6.1
Returgivare 2 Framledningsgivare 2
2
29

ESV 20
VVM 240 / 300
4
SE
95
FIGHTER 2010
VVM 240
AV
AV
SÄK
SF
RC
TV
FG
RG
UG
FG2
RG2
VBP2 SV-V2
AV Avstängningsventil
FG Framledningsgivare*
FG2 Framledningsgivare 2
RG Returgivare*
RG2 Returgivare 2
SF Smutsfilter
SV-V2 Shuntventil 2
SÄV Säkerhetsventil
UG Utegivare
VBP2 Värmebärarpump 2
Montering sker enligt följande.
■ Töm först pannvattenkärlet/värmesystemet om
detta är vattenfyllt.
■Den extra värmebärarpumpen (VBP2) placeras på
lämplig plats utanför VVM 240 / 300. Shuntventilen
(SV-V2) placeras på framledningen, efter VVM
240 / 300, före första radiatorn på värmesystem
1. Returledningen från värmesystem 2 kopplas
till shuntventilen samt till returledningen från
värmesystem 1, se bild.
■De två medföljande temperaturgivarna monteras i
anslutning till värmesystem 2 enligt bild.
Framledningsgivaren (FG2) monteras på
röret mellan värmebärarpumpen (VBP2) och
värmesystem 2.
Returledningsgivaren (RG2) monteras på röret från
värmesystem 2.
■Vid montering skall kontaktpasta samt isolering runt
givaren och röret användas för att erhålla korrekt
temperaturmätning. OBS! Vid felaktig montering
kan funktionen äventyras.
Röranslutning
LEK
Retur
Värmepump Framledning
* Endast FIGHTER 2010
** Endast VVM 240
/ 2020 *
*
/ VVM 300
**

ESV 20
VVM 240 / 300 5
SE
Det medföljande reläkortet monteras på det befintliga
reläkortet (29) med hjälp av plasttornen. Den bruna
kabelns lösa ände kopplas in på plint -X12 position 3.
Se avsnitt “Komponentplacering” för positioner.
Kantkontaktkablaget kopplas in mellan det medföljande
reläkortet och reläkort (29) enligt vidstående bild.
5-ledarkabeln kopplas in enligt följande:
■ Blå ledare till noll-position på plint -X12 position 4.
■ Brun ledare till position 40 på det nya reläkortet.
■ Svart ledare till position 42 på det nya reläkortet.
■ Vit ledare till position 38 på det nya reläkortet.
■ Jordledare (gul/grön) till ledigt jordstift.
Den andra änden på 5-ledarkabeln, shuntmotorn
och värmebärarpumpen kopplas in i kopplingsdosan
enligt nedanstående bild. Kopplingsdosan monteras
lämpligen på väggen.
Givarna kopplas in med två-ledare (exempelvis EKXX
eller LiYY) enligt följande:
Den givare som används som framledningsgivare 2
ansluts till position 7 och 8 på effektvaktskortets (2)
nedre plint.
Returgivare 2 kopplas in till position 5 och 6 på samma
kort.
Använd medföljande rundstiftshylsor för skarvning
mellan två-ledaren och givaren.
Elanslutning
Blå
M
Brun
Gul/Grön
Brun Blå
Brun
Brun
Svart
Gul/
Grön
Vit
Vit
Blå
Gul/Grön
Blå Vit
Brun
Svart
Shuntmotor Värmebärarpump
Kopplingsdosa
5-ledarkabel
Till ledigt
jordstift
Till ledig noll-position på
kompressorkondensator (28)
Till position 10
på plint (22)
Re
37
39
40
41
42
38
Re
Re
OBS!
All elektrisk inkoppling skall ske av
behörig elektriker
■Välj “Service” i meny 8.1.1 för att få tillgång till meny
9.0 och dess undermenyer.
■Välj sedan “Till” i meny 9.3.3, “Shuntgrupp 2”.
Därmed är meny 3.0 och dess undermenyer
åtkomliga.
■I undermenyerna ställs nu värmekurva,
parallellförskjutning samt min- och maxnivåer
in för värmesystem 2 på samma sätt som för
värmesystem 1 under meny 2.0.
Se också “Monterings- och skötselanvisning” för VVM
240 / 300.
Inställning
HAHN
LEK
VVM 240 / 300
EXTERNT
4X4.1
X6.1
Returgivare 2 Framledningsgivare 2
2
Till position 3 på plint -X12
i VVM 240 / 300
Till position 4 på
plint -X12 i VVM 240 / 300
29

ESV 20
FIGHTER 1130 / 1230
6
SE
A
B
AB
FG2
RG2
VBP2 SV-V2
AV
AV
AV
AV
AV
VVG
SF
SF
NK
SÄV
SÄV
EXP
RG
FG
VXV
VVB / ACK
JK / BK
UG
ELK
T
AV Avstängningsventil
JK/BK Jord-/Bergkollektor
EXP Expansionskärl med erfoderlig säkerhetsutrustning
FG Framledningsgivare
FG2 Framledningsgivare 2
NV Nivåkärl
RG Returgivare
RG2 Returgivare 2
SF Smutsfilter
SV-V2 Shuntventil 2
SÄV Säkerhetsventil
VBP2 Värmebärarpump 2
VVB Vattenvärmare
VVB/ACK Ackumulator med vattenvärmare
VVG Varmvattengivare
VXV Växelventil
FIGHTER 1130/1230
Montering sker enligt följande.
■ Töm först pannvattenkärlet/värmesystemet om
detta är vattenfyllt.
■Den extra värmebärarpumpen (VBP2) placeras
på lämplig plats utanför FIGHTER 1130/1230.
Shuntventilen (SV-V2) placeras på framledningen,
efter värmepumpen, före första radiatorn på
värmesystem 1. Returledningen från värmesystem
2 kopplas till shuntventilen samt till returledningen
från värmesystem 1, se bild.
■De två medföljande temperaturgivarna monteras i
anslutning till värmesystem 2 enligt bild.
Framledningsgivaren (FG2) monteras på
röret mellan värmebärarpumpen (VBP2) och
värmesystem 2.
Returledningsgivaren (RG2) monteras på röret från
värmesystem 2.
■Vid montering skall kontaktpasta samt isolering runt
givaren och röret användas för att erhålla korrekt
temperaturmätning. OBS! Vid felaktig montering
kan funktionen äventyras.
Röranslutning
LEK
Retur
Värmepump Framledning

ESV 20
FIGHTER 1130 7
SE
Det medföljande reläkortet monteras på det befintliga
reläkortet (29) med hjälp av plasttornen. Den bruna
kabelns lösa ände kopplas in på position 16 på plint -X6
i FIGHTER 1130.
Se avsnitt “Komponentplacering” för positioner.
Kantkontaktkablaget kopplas in mellan det medföljande
reläkortet och reläkort (29) enligt vidstående bild.
5-ledarkabeln kopplas in enligt följande:
■ Blå ledare till position 17 på plint -X6 i FIGHTER
1130.
■ Brun ledare till position 40 på det nya reläkortet.
■ Svart ledare till position 42 på det nya reläkortet.
■ Vit ledare till position 38 på det nya reläkortet.
■ Jordledare (gul/grön) till ledigt jordstift.
Den andra änden på 5-ledarkabeln, shuntmotorn och
värmebärarpumpen kopplas in i kopplingsdosan enligt
vidstående bild. Kopplingsdosan monteras lämpligen
på väggen.
Givarna kopplas in med två-ledare (exempelvis EKXX
eller LiYY) enligt följande:
Den givare som används som framledningsgivare 2
ansluts till position 7 och 8 på effektvaktskortets (2)
nedre plint.
Returgivare 2 kopplas in till position 5 och 6 på samma
kort.
Använd medföljande rundstiftshylsor för skarvning
mellan två-ledaren och givaren.
Elanslutning
4X4.1
X6.1
Returgivare 2 Framledningsgivare 2
2
OBS!
All elektrisk inkoppling skall ske av
behörig elektriker
■Välj “Service” i meny 8.1.1 för att få tillgång till meny
9.0 och dess undermenyer.
■Välj sedan “Till” i meny 9.2.5, “Shuntgrupp 2”.
Därmed blir meny 3.0 och dess undermenyer
åtkomliga.
■I undermenyerna ställs nu värmekurva,
parallellförskjutning samt min- och maxnivåer
in för värmesystem 2 på samma sätt som för
värmesystem 1 under meny 2.0.
Se också “Monterings- och skötselanvisning” för
FIGHTER 1130.
Inställning
Blå
M
Brun
Gul/Grön
Brun Blå
Brun
Brun
Svart
Gul/
Grön
Vit
Vit
Blå
Gul/Grön
Blå Vit
Brun
Svart
Shuntmotor Värmebärarpump
Kopplingsdosa
5-ledarkabel
Till ledigt
jordstift
Till ledig noll-position på
kompressorkondensator (28)
Till position 10
på plint (22)
Re
37
39
40
41
42
38
Re
Re
Till position 16 på
plint -X6 i FIGHTER 1130
Till position 17 på
plint -X6 i FIGHTER 1130
HAHN
LEK
FIGHTER 1130
EXTERNT
29

ESV 20
FIGHTER 1230
8
SE
Det medföljande reläkortet monteras på det befintliga
reläkortet (29) med hjälp av plasttornen. Den bruna
kabelns lösa ände kopplas in till position 12 på plint
-X6 i FIGHTER 1230.
OBS! Om ingen kabel är ansluten till plint -X6 position
12 sedan tidigare skall en 0,75-mm2kabel anslutas
från ovansidan av denna position till motorskydd (26)
anslutning 95.
Se avsnitt “Komponentplacering” för positioner.
Kantkontaktkablaget kopplas in mellan det medföljande
reläkortet och reläkort (29) enligt vidstående bild.
5-ledarkabeln kopplas in enligt följande:
■ Blå ledare till noll-position på plint för inkommande
el (-X9) i FIGHTER 1230.
■ Brun ledare till position 40 på det nya reläkortet.
■ Svart ledare till position 42 på det nya reläkortet.
■ Vit ledare till position 38 på det nya reläkortet.
■ Jordledare (gul/grön) till ledigt jordstift.
Den andra änden på 5-ledarkabeln, shuntmotorn och
värmebärarpumpen kopplas in i kopplingsdosan enligt
vidstående bild. Kopplingsdosan monteras lämpligen
på väggen.
Givarna kopplas in med två-ledare (exempelvis EKXX
eller LiYY) enligt följande:
Den givare som används som framledningsgivare 2
ansluts till position 7 och 8 på effektvaktskortets (2)
nedre plint.
Returgivare 2 kopplas in till position 5 och 6 på samma
kort.
Använd medföljande rundstiftshylsor för skarvning
mellan två-ledaren och givaren.
Elanslutning
OBS!
All elektrisk inkoppling skall ske av
behörig elektriker
■Välj “Service” i meny 8.1.1 för att få tillgång till meny
9.0 och dess undermenyer.
■Välj sedan “Till” i meny 9.2.5, “Shuntgrupp 2”.
Därmed blir meny 3.0 och dess undermenyer
åtkomliga.
■I undermenyerna ställs nu värmekurva,
parallellförskjutning samt min- och maxnivåer
in för värmesystem 2 på samma sätt som för
värmesystem 1 under meny 2.0.
Se också “Monterings- och skötselanvisning” för
FIGHTER 1230.
Inställning
Blå
M
Brun
Gul/Grön
Brun Blå
Brun
Brun
Svart
Gul/
Grön
Vit
Vit
Blå
Gul/Grön
Blå Vit
Brun
Svart
Shuntmotor Värmebärarpump
Kopplingsdosa
5-ledarkabel
Till ledigt
jordstift
Till ledig noll-position på
kompressorkondensator (28)
Till position 10
på plint (22)
Re
37
39
40
41
42
38
Re
Re
Till position 12 på
plint -X6 i FIGHTER 1230
FIGHTER 1230
EXTERNT
Till noll-position på plint
för inkommande el (-X9) i
FIGHTER 1230
HAHN
LEK
4X4.1
X6.1
Returgivare 2 Framledningsgivare 2
2
29

ESV 20
Komponentplacering 9
SE
LEK
011007
Art.nr.611827
2
1
bar
3
04
VARNING
DATASKYLT123456SERIENR. 123456
VVKV
LEK
Art.nr.611???
2
1bar 3
04
FIGHTER 360P
VVM 240
Plats för medföl-
jande reläkort.
Jordstift
LEK
29 22 28
29
Plats för medföljande
reläkort.
2
2
-X12
VVM 300
LEK
Art.nr.611???
2
1bar 3
04
2
-X12
Plats för medföl-
jande reläkort.
Jordstift
29

ESV 20
SE
LEK
ABIIIIII III I II
50.0 C
Varmva tt e n te mp. 1 .0
LEK
FIGHTER 1130 FIGHTER 1230
Plats för medföljande
reläkort.
29
29
2
Plats för medföljande
reläkort.
2
26
-X6
-X6
-X9
Komponentplacering
10

ESV 20
11
ESV 20
GB
GB
This accessory is used when FIGHTER 360P / 1120
/ 1220 or VVM 240 / VVM 300 is installed in homes
with two different heating systems that require
different flow temperatures, for example, when the
home has both a radiator system and floor heating
system. In the text below heating system 1 refers to
the system that requires the highest temperature and
which is connected to the ordinary flow and return
connections.
Heating system 2 refers to the heating system that
works at the lowest temperature.
The combined water flow in the two heating systems
should not exceed 1700 l/h.
The number designations in brackets in the following
text refer to the “Component placement” section and
the “Installation and Maintenance Instructions” for the
FIGHTER 360P / 1120 / 1220 or VVM240 / VVM 300
in question.
General
1 Pipe with straight coupling
1 Circulation pump with cable
2 Shut off valves
1 Shunt valve with motor
1 5-core cable
1 Relay card with cabling
2 Temperature sensor
1 Cabling, edge board contact
4 Round pin adapter
1 Connection box
1 Insulation tape
LEK
Contents
11

ESV 20
12
LEK
ESV 20
FIGHTER 360P
GB
LEK
+2
0
-2
ABABAB
IIIIIIIIIIII
Install as follows.
■ Empty the water cylinder first, if this is filled with
water. Unscrew the plug (61) in the dished end of
FIGHTER 360P. Install the supplied plastic pipe
where the plug was previously fitted.
Pipe connections
■The extra circulation pump (VBP2) and shunt valve
(SV-V2) are positioned in a suitable area outside
of FIGHTER 360P. From the coupling on the fitted
plastic pipe route the pipe to the shunt valve. The
return pipe from heating system 2 is connected
to the shunt valve as well as the return pipe from
heating system 1, see figure.
■The two supplied temperature sensors are fitted in
connection to heating system 2 as illustrated in the
figure.
The flow sensor (FS2) is fitted on the pipe between
the shunt valve and the circulation pump (VBP2).
The return sensor (RG2) is fitted on the pipe from
heating system 2.
■Contact paste and insulation around the sensor
and pipe must be used during installation to obtain
the correct temperature measurement. NOTE!
Incorrect installation can put functionality at risk.
LEK
61
Värmesystem 2 Värmesystem 1
61
SV-V2
FG2
VBP2
RG2
AV
AV
LEK
Return
Heat pump Flow
AV Shutoff valve
FG2 Flow sensor 2
RG2 Return sensor 2
SV-V2 Shunt valve 2
VBP2 Circulation pump 2
Heating circuit 2 Heating circuit 1
12

ESV 20
13
ESV 20
FIGHTER 360P
GB
Blå
M
Brun
Gul/Grön
Brun Blå
Brun
Brun
Svart
Gul/
Grön
Vit
Vit
Blå
Gul/Grön
Blå Vit
Brun
Svart
Shuntmotor Värmebärarpump
Kopplingsdosa
5-ledarkabel
Till ledigt
jordstift
Till ledig noll-position på
kompressorkondensator (28)
Till position 10
på plint (22)
Re
37
39
40
41
42
38
Re
Re
The supplied relay card is fitted on the existing relay
card (29) using the plastic spacers.The free end of the
brown cable is connected to position 10 on terminal
(22) for the fan transformer.
See the section “Component placement” for the
positions.
The edge board contact cable is connected between
the supplied relay card and relay card (29) as shown
in the adjoining figure.
The 5-core cable is connected as follows:
■ Blue conductor to the free neutral position on the
compressor capacitor (28).
■ Brown conductor to position 40 on the new relay
card.
■ Black conductor to position 42 on the new relay
card.
■ White conductor to position 38 on the new relay
card.
■ Earth conductor (yellow/green) to a free earth pin
on the terminal block to the left of the compressor
capacitor.
The other end of the 5-core cable, shunt motor and
the circulation pump are connected to the connection
box as shown in the figure below. The connection box
can be mounted on a wall.
The sensors are connected with a two-wire cable (for
example, EKXX or LiYY) as follows:
The sensor used as the flow sensor 2 is connected to
positions 7 and 8 on the load monitor card (2) lower
terminal.
Return sensor 2 is connected to positions 5 and 6 on
the same card.
Use the supplied round pin adapters for the splice
between the two-wire cable and the sensor.
Electrical connection
HAHN
LEK
NOTE!
All electrical connections should be
made by a qualified electrician
■Select “Service” from menu 8.1.1 to access menu
9.0 and its sub-menus.
■Now select “On” in menu 9.1.2, “Extra Shunt
Present”. You will now be able to access menu 3.0
and its sub-menus.
■Using the sub-menus you can now set the heat
curve, parallel offset as well as the min. and max.
levels for heating system 2 in the same way as for
heating system 1 in menu 2.0.
Also refer to the “Installation and Maintenance
Instructions” for FIGHTER 360P.
Settings
FIGHTER 360P
EXTERNAL
Shunt motor Circulation pump
Yellow/Green
Yellow/Green
Yellow /
Green
Blue
Brown
Black
White
Brown
Brown
Brown
Black
Brown
White
White
Blue
Blue
Blue
Connection box
5-core cable
To a free
ground pin
To position 10
on terminal (22)
To the free neutral position
on the compressor capacitor
(28)
4X4.1
X6.1
Return sensor 2 Flow sensor 2
2
29
13

ESV 20
14
ESV 20
VVM 240 / VVM 300
GB
95
FIGHTER 2010
VVM 240
AV
AV
SÄK
SF
RC
TV
FG
RG
UG
FG2
RG2
VBP2 SV-V2
AV Shutoff valve
FG Flow sensor
FG2 Flow sensor 2
RG Return sensor
RG2 Return sensor 2
SF Particle filter
SV-V2 Shunt valve 2
SÄV Safety valve
UG Outside sensor
VBP2 Circulation pump 2
Install as follows.
■ Empty the water cylinder/heating circuit first, if this
is filled with water.
■The extra circulation pump (VBP2) is positioned in
a suitable area outside of VVM 240 / VVM 300. The
shunt valve (SV-V2) is positioned on the flow pipe,
after VVM 240 / VVM 300, before the first radiator
on heating system 1. The return pipe from heating
system 2 is connected to the shunt valve as well as
the return pipe from heating system 1, see figure.
■The two supplied temperature sensors are fitted in
connection to heating system 2 as illustrated in the
figure.
The flow sensor (FS2) is fitted on the pipe between
the circulation pump (VBP2) and heating system 2.
The return sensor (RG2) is fitted on the pipe from
heating system 2.
■Contact paste and insulation around the sensor
and pipe must be used during installation to obtain
the correct temperature measurement. NOTE!
Incorrect installation can put functionality at risk.
Pipe connections
LEK
Return
Heat pump Flow
/ 2020
*
*
/ VVM 300
* Only FIGHTER 2010
** Only VVM 240
14
**

ESV 20
15
ESV 20
VVM 240 / VVM 300
GB
The supplied relay card is fitted on the existing relay
card (29) using the plastic spacers.The free end of the
brown cable is connected to terminal -X12 position 3.
See the section “Component placement” for the
positions.
The edge board contact cable is connected between
the supplied relay card and relay card (29) as shown
in the adjoining figure.
The 5-core cable is connected as follows:
■ Blue conductor to the neutral position on terminal
-X12 position 4.
■ Brown conductor to position 40 on the new relay
card.
■ Black conductor to position 42 on the new relay
card.
■ White conductor to position 38 on the new relay
card.
■ Earth conductor (yellow/green) to a free earth pin.
The other end of the 5-core cable, shunt motor and
the circulation pump are connected to the connection
box as shown in the figure below. The connection box
can be mounted on a wall.
The sensors are connected with a two-wire cable (for
example, EKXX or LiYY) as follows:
The sensor used as the flow sensor 2 is connected to
positions 7 and 8 on the load monitor card (2) lower
terminal.
Return sensor 2 is connected to positions 5 and 6 on
the same card.
Use the supplied round pin adapters for the splice
between the two-wire cable and the sensor.
Electrical connection
NOTE!
All electrical connections should be
made by a qualified electrician
■Select “Service” from menu 8.1.1 to access menu
9.0 and its sub-menus.
■Now select “On” in menu 9.3.3, “Extra Shunt
Present”. You will now be able to access menu 3.0
and its sub-menus.
■Using the sub-menus you can now set the heat
curve, parallel offset as well as the min. and max.
levels for heating system 2 in the same way as for
heating system 1 in menu 2.0.
Also refer to the “Installation and Maintenance
Instructions” for VVM 240 / VVM 300.
Settings
HAHN
LEK
4X4.1
X6.1
Return sensor 2 Flow sensor 2
2
Blå
M
Brun
Gul/Grön
Brun Blå
Brun
Brun
Svart
Gul/
Grön
Vit
Vit
Blå
Gul/Grön
Blå Vit
Brun
Svart
Shuntmotor Värmebärarpump
Kopplingsdosa
5-ledarkabel
Till ledigt
jordstift
Till ledig noll-position på
kompressorkondensator (28)
Till position 10
på plint (22)
Re
37
39
40
41
42
38
Re
Re
VVM 240 / 300
EXTERNAL
Shunt motor Circulation pump
Yellow/Green
Yellow/Green
Yellow /
Green
Blue
Brown
Black
White
Brown
Brown
Black
Brown
White
White
Blue
Blue
Blue
Connection box
5-core cable
To a free
ground pin
To position 4 on
terminal -X12 in
VVM 240 / 300
To position 3 on terminal
-X12 in VVM 240 / 300
29
Brown
15

ESV 20
16
ESV 20
FIGHTER 1120/1220
GB
AV Shutoff valve
JK/BK Soil/Rock collector
EXP Expansion vessel with the requisite safety
equipment
FG Flow sensor
FG2 Flow sensor 2
NK Level vessel
RG Return sensor
RG2 Return sensor 2
SF Particle filter
SV-V2 Shunt valve 2
SÄV Safety valve
VBP2 Circulation pump 2
VVB Water heater
VVB/ACK Accumulator with water heater
VVG Hot water sensor
VXV Shuttle valve
Install as follows.
■ Empty the water cylinder/heating system first, if this
is filled with water.
■The extra circulation pump (VBP2) is positioned
in a suitable area outside of FIGHTER 1120/1220.
The shunt valve (SV-V2) is positioned on the flow
pipe, after the heat pump, before the first radiator
on heating system 1. The return pipe from heating
system 2 is connected to the shunt valve as well as
the return pipe from heating system 1, see figure.
■The two supplied temperature sensors are fitted in
connection to heating system 2 as illustrated in the
figure.
The flow sensor (FS2) is fitted on the pipe between
the circulation pump (VBP2) and heating system 2.
The return sensor (RG2) is fitted on the pipe from
heating system 2.
■Contact paste and insulation around the sensor
and pipe must be used during installation to obtain
the correct temperature measurement. NOTE!
Incorrect installation can put functionality at risk.
Pipe connections
A
B
AB
FG2
RG2
VBP2 SV-V2
AV
AV
AV
AV
AV
VVG
SF
SF
NK
SÄV
SÄV
EXP
RG
FG
VXV
VVB / ACK
JK / BK
UG
ELK
T
FIGHTER 1120/1220
LEK
Return
Heat pump Flow
16

ESV 20
17
ESV 20
FIGHTER 1120
GB
The supplied relay card is fitted on the existing relay
card (29) using the plastic spacers. The free end of the
brown cable is connected to position 16 on terminal -X6
in FIGHTER 1120.
See the section “Component placement” for the
positions.
The edge board contact cable is connected between
the supplied relay card and relay card (29) as shown
in the adjoining figure.
The 5-core cable is connected as follows:
■ Blue conductor to position 17 on terminal -X6 in
FIGHTER 1120.
■ Brown conductor to position 40 on the new relay
card.
■ Black conductor to position 42 on the new relay
card.
■ White conductor to position 38 on the new relay
card.
■ Earth conductor (yellow/green) to a free earth pin.
The other end of the 5-core cable, shunt motor and
the circulation pump are connected to the connection
box as shown in the adjoining figure. The connection
box can be mounted on a wall.
The sensors are connected with a two-wire cable (for
example, EKXX or LiYY) as follows:
The sensor used as the flow sensor 2 is connected to
positions 7 and 8 on the load monitor card (2) lower
terminal.
Return sensor 2 is connected to positions 5 and 6 on
the same card.
Use the supplied round pin adapters for the splice
between the two-wire cable and the sensor.
Electrical connection
4X4.1
X6.1
Return sensor 2 Flow sensor 2
2
NOTE!
All electrical connections should be
made by a qualified electrician
■Select “Service” from menu 8.1.1 to access menu
9.0 and its sub-menus.
■Now select “On” in menu 9.2.5, “System 2 Present”.
You will now be able to access menu 3.0 and its
sub-menus.
■Using the sub-menus you can now set the heat
curve, parallel offset as well as the min. and max.
levels for heating system 2 in the same way as for
heating system 1 in menu 2.0.
Also refer to the “Installation and Maintenance
Instructions” for FIGHTER 1120.
Settings
HAHN
LEK
Blå
M
Brun
Gul/Grön
Brun Blå
Brun
Brun
Svart
Gul/
Grön
Vit
Vit
Blå
Gul/Grön
Blå Vit
Brun
Svart
Shuntmotor Värmebärarpump
Kopplingsdosa
5-ledarkabel
Till ledigt
jordstift
Till ledig noll-position på
kompressorkondensator (28)
Till position 10
på plint (22)
Re
37
39
40
41
42
38
Re
Re
FIGHTER 1120
EXTERNAL
Shunt motor Circulation pump
Yellow/Green
Yellow/Green
Yellow /
Green
Blue
Brown
Black
White
Brown
Brown
Black
Brown
White
White
Blue
Blue
Blue
Connection box
5-core cable
To a free
ground pin
To position 17 on terminal
-X6 in FIGHTER 1120
To position 16 on terminal
-X6 in FIGHTER 1120
29
Brown
17

ESV 20
18
ESV 20
FIGHTER 1220
GB
The supplied relay card is fitted on the existing relay
card (29) using the plastic spacers.The free end of the
brown cable is connected to position 12 on terminal
-X6 in FIGHTER 1220.
NOTE! If no cable has been connected to terminal -X6
position 12, a 0.75-mm2cable should be connected
from the top of this position to the motor protection
(26) connection 95.
See the section “Component placement” for the
positions.
The edge board contact cable is connected between
the supplied relay card and relay card (29) as shown
in the adjoining figure.
The 5-core cable is connected as follows:
■ Blue conductor to the neutral position on the
terminal for the incoming electricity (-X9) in
FIGHTER 1220.
■ Brown conductor to pos. 40 on the new relay card.
■ Black conductor to pos. 42 on the new relay card.
■ White conductor to pos. 38 on the new relay card.
■ Earth conductor (yellow/green) to a free earth pin.
The other end of the 5-core cable, shunt motor and
the circulation pump are connected to the connection
box as shown in the adjoining figure. The connection
box can be mounted on a wall.
The sensors are connected with a two-wire cable (for
example, EKXX or LiYY) as follows:
The sensor used as the flow sensor 2 is connected to
positions 7 and 8 on the load monitor card (2) lower
terminal.
Return sensor 2 is connected to positions 5 and 6 on
the same card.
Use the supplied round pin adapters for the splice
between the two-wire cable and the sensor.
Electrical connection
NOTE!
All electrical connections should be
made by a qualified electrician
■Select “Service” from menu 8.1.1 to access menu
9.0 and its sub-menus.
■Now select “On” in menu 9.2.5, “System 2 Present”.
You will now be able to access menu 3.0 and its
sub-menus.
■Using the sub-menus you can now set the heat
curve, parallel offset as well as the min. and max.
levels for heating system 2 in the same way as for
heating system 1 in menu 2.0.
Also refer to the “Installation and Maintenance
Instructions” for FIGHTER 1220.
Settings
HAHN
LEK
4X4.1
X6.1
Return sensor 2 Flow sensor 2
2
Blå
M
Brun
Gul/Grön
Brun Blå
Brun
Brun
Svart
Gul/
Grön
Vit
Vit
Blå
Gul/Grön
Blå Vit
Brun
Svart
Shuntmotor Värmebärarpump
Kopplingsdosa
5-ledarkabel
Till ledigt
jordstift
Till ledig noll-position på
kompressorkondensator (28)
Till position 10
på plint (22)
Re
37
39
40
41
42
38
Re
Re
FIGHTER 1220
EXTERNAL
Shunt motor Circulation pump
Yellow/Green
Yellow/Green
Yellow /
Green
Blue
Brown
Black
White
Brown
Brown
Black
Brown
White
White
Blue
Blue
Blue
Connection box
5-core cable
To a free
ground pin
To the neutral position
on the terminal for the
incoming electricity (-X9)
in FIGHTER 1220
To position 12 on terminal
-X6 in FIGHTER 1220
29
18
Other manuals for ESV 20
1
Table of contents
Languages:
Other Nibe Water Pump manuals
Popular Water Pump manuals by other brands

MSW Motor Technics
MSW Motor Technics MSW-GP-100 user manual

AMT
AMT 5760-95 Specifications information and repair parts manual

Gardena
Gardena 6000/3 S operating instructions

Sulzer
Sulzer ABS XFP-PE7 Series Installation and operating instructions

GORMAN-RUPP PUMPS
GORMAN-RUPP PUMPS PA Series Installation, operation, and maintenance manual with parts list

Graco
Graco EcoQuip 2 EQm instruction manual