
Shower
Installation
2.
1.
We recommend that you hire a professional plumber.
NOTE: During installation, the pipes until the mixers washed, before the mixer is mounted.
NOTE: When attaching the connection tube (soft PEX tubing) to the supply line
connecting link to be switched off.
BEFORE USE
3.
4.
150mm
Make sure cold and hot water pipes installed at 1050mm height.
Flush the pipes before installation.
Make sure the middle distance btw the two pipes are 150mm and allow 5mm adjustment
Measure the depth of the inner thread of cold and hot water pipes and mark it.
This is to have NO gap left btw the wall and brass connector.
Cut the extra length of the outer thread of the brass connector at marked length.
Fit the two brass connectors to the stainless fixing plate with two holes.
Then tighten the two brass connectors to the cold abd hot water pipes.
900 150
Adjustable in vertical
Measure the distance,
instal the upper holder.
Upper holder
HOT
COLD