
4| 4| Sensor ventilation air conditioning | Data sheet No. 14106 | Version 06-2012 Specications subject to change.
CO2sensor CO2-W-LC / CO2-K-LC
Oppermann Regelgeräte GmbH | Im Spitzhau 1 | 70771 Leinfelden-Echterdingen, Germany
Phone +49 711 72723560 | Fax +49 711 7280527 | info@oppermann-regelgeraete.de |www.oppermann-regelgeraete.de
InstallationofductversionK
Thecorrectpositioningandconnectionofcablestotrade
standards,aswellaspropersealingisabasicconditionfor
properfunctionality.Notethefollowinginstructions:
• Attention:Duetothepressuredierentialbetweentheduct
andtheenvironment,thesealandcablefeed-throughmust
beinstalledwithspecialcare.Incorrectreadingscanbe
theresultofairinltration.Noadditionalopeningsonthe
housingorothermeasurestomodifyaircirculationandheat
distributionarepermittedonthedevice.Ifnecessary,seal
theductinletwithadditionalsealantiftheincludedgasket
isinsucientbyitself(e.g.onsmallerradii/pipes).
• Cablebushingsinparticularmustbesealedproperly.Never
insertmorethanonecablepercablebushing,sinceleaks
canresultinincorrectreadings.Onlyinstallthesensor
whereitisnotexposedtostronglight,heat,sunirradiation,
orairow.
• Probe tube installation:
DrillaØ25mm(10)fortheprobetube(1)and2Ø4mmfor
themountingscrews(5)atasuitablelocationintotheduct.
Thenmounttheprobetubeincludinggasket(2)totheduct
withscrews(5).Notethatthelargesttap(3)islocatedonthe
bayonetlockoftheprobetube.Ifnecessary,sealtheareaof
thegasket(2)withadditionalsealant..
• Housing installation:
Thehousingwithfactory-installedO-ring(6)andelectronics(7)
issimplyconnectedtotheprobetubewiththebayonetlock.
Engagetheuppersideofthehousinglightlyinacounter-
clockwisedirectionfromthelargesttap(3)oftheprobetube
andthenrotatethehousingtotheright(seesupplemental
drawing12).Insertthecableintothecablethread(9)and
connectittothefactory-installedelectronics(7).Thensecure
thesnap-onlid(8)tohousing.Theunitisdisassembledinthe
reverseorder.
1
CO2/ temperature transmitter for
mounting in ventilation ducts
1
1
2
3
456
7
9
8
10
1 Sampling probe 6 O-ring 29,2x3,53 (Factory supplied mounted in box)
2 Sealing gasket 7 PCB (Factory supplied mounted in box)
3 Largest locking nob 8Snap-in lid
4 2 washers 9PG9 cable entry bushing
5 2 screws 10 Temperature sensor (to be put into the sampling tube)
2
Mounting of aSENSE on to the duct.
11
10
10 Hole with 25 mm diameter
11 Temperature sensor with 110 mm cable mounted in the sampling probe
Mounting Instruction
Since there might be a substantial pressure difference in duct mounting applications,
it is essential to avoid ambient air from suction into the duct mounting box. For
correct function it is indispensible that the sealing of the box cover, the cable entry
bushings, the cable feed through and the duct entrance are absolutely tight. The duct
entrance may need extra sealing paste in order to prevent leakage. The PCB must
be handed carefully and protected from electrostatic discharge.
1) Electrical cable entry: The box has a factory mounted cable entry bushing in
dimension PG9. Never feed more than one cable through each cable entry
bushing, or else gas might leak through!
Dimensions in mm (inch)
1: Sensor probe tube - note
position (airow sampling
either from left or right)
DimensionsDucthousing