manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Oxford Plastics
  6. •
  7. Construction Equipment
  8. •
  9. Oxford Plastics LOWPRO 15/10 User manual

Oxford Plastics LOWPRO 15/10 User manual

LOWPRO TRENCH
COVER & INFILL
INSTALLATION
GUIDE
Oxford Plastic Systems Ltd,
Unit T2, Enstone Business Park,
Enstone, Chipping Norton,
Oxfordshire OX7 4NP, United Kingdom
+44 (0) 1608 678888
 [email protected]
 www.oxfordplastics.com
02/2020 - UK
TECHNICAL SPECIFICATIONS
Product No. 0815 0840 0375
Length 1500mm 1500mm 1000mm
Width 1000mm 130mm 130mm
Height 35mm 35mm 35mm
Weight 38kg 2.3kg 2kg
Qty/pallet 20 5/100 5/100
Colour Yellow & Black Black Black
Maximum Trench Width - 1200mm 400mm
Product No. 0362 0364 0383
Length 1200mm 1200mm 800mm
Width 800mm 130mm 130mm
Height 28mm 28mm 28mm
Weight 18kg 2kg 1.5kg
Qty/pallet 30 5/100 5/100
Colour Yellow & Black Black Black
Maximum Trench Width - 700mm 400mm
15/10 LONG INFILL SHORT INFILL
12/08 LONG INFILL SHORT INFILL
LOWPRO 15/10
LOWPRO 12/08
LowPro Infills are available in in packs of 5 or 100. Contact Oxford Plastics to improve your worksite safety.
WHAT IS A LOWPRO INFILL? INSTALLATION GUIDE
INSTALLATION KIT
SELECT YOUR LOWPRO
The LowPro range covers trenches up to 1200mm.
Select the appropriate LowPro cover below & use the Infill strip to connect a series of trench
covers together and remove trip hazards between boards.
The Infill is available for the LowPro 12/8 (in long or short sizes) & LowPro 15/10 (in long or short sizes). Use the long or short
size of Infill depending on how you orientate the LowPro over the trench. The LowPro 11/11 does not have an Infill as it is
designed to sit close to the ground (height = 18mm).
Safety guidelines & maintenance
Installation Steps
Enough LowPro 12/08 or LowPro 15/10
to safely span the length of the trench.
Use 1 LowPro Infill between 2 LowPro
Trench Covers. Infills are connected
by hand without additional tools.
Footway
Board
Driveway
Board
Footway
Board
Driveway
Board
Footway
Board
3.5t
  
3.5t
LowPro
12/08
LowPro
12/08
LowPro
15/10
LowPro
15/10
LowPro
15/10
LowPro
11/11
TRENCH SIZE
UP TO
700MM
TRENCH SIZE
UP TO
900MM
TRENCH SIZE
UP TO
1200MM
LowPro 12/8 is a 1 person lift.
LowPro 15/0 is a 2 person lift.
1. Assess the surrounding surface where
the rubber edges will be resting.
4. Insert the 2nd plate in the bolt hole
on the long or short side.
7. Ensure the LowPro is sitting on the
plate at both ends.
Ensure your LowPro is clean & check
the surface & Flexi-edges for signs
of damage. Do not use damaged
LowPros.
2. Unscrew the plate and bolts at each
end of the Infill.
5. Place the LowPro with the plates
inserted over the trench.
8. Place the Infill between the LowPros
& secure with 2 bolts at either end.
Always conduct a Site Safety Risk
Assessment before working. LowPros
have anti-slide Flexi-edges, however
they can be bolted down if the SSRA
warrants it.
3. Insert the plate underneath the
LowPro through the bolt hole.
6. Place the next LowPro in line with the
first over the Infill plate.
9. Continue placing LowPros over the
trench & attaching Infills until the trench
is fully covered.

This manual suits for next models

7

Popular Construction Equipment manuals by other brands

GREMO 1050F4 Service and maintenance manual

GREMO

GREMO 1050F4 Service and maintenance manual

Grizzly T32961 instructions

Grizzly

Grizzly T32961 instructions

Manitowoc MLC300 manual

Manitowoc

Manitowoc MLC300 manual

Manitowoc National Crane NBT50 Series Operator's manual

Manitowoc

Manitowoc National Crane NBT50 Series Operator's manual

Highway Care BG800 Product and installation manual

Highway Care

Highway Care BG800 Product and installation manual

Case 845B VHP Service manual

Case

Case 845B VHP Service manual

Broderson IC-20-1J Operation and maintenance manual

Broderson

Broderson IC-20-1J Operation and maintenance manual

Husqvarna 1-8DPS30 Operator's manual

Husqvarna

Husqvarna 1-8DPS30 Operator's manual

Husqvarna FS400LV Operator's manual

Husqvarna

Husqvarna FS400LV Operator's manual

Bramley 42 AB2 Operating instructions & parts list

Bramley

Bramley 42 AB2 Operating instructions & parts list

Loglift 82Z CE Operator's manual

Loglift

Loglift 82Z CE Operator's manual

Manitowoc National Crane NBT30H-2 Service manual

Manitowoc

Manitowoc National Crane NBT30H-2 Service manual

New Holland VM3080 Repair manual

New Holland

New Holland VM3080 Repair manual

SUNWARD SWTC5D Operation & maintenance manual

SUNWARD

SUNWARD SWTC5D Operation & maintenance manual

Denzel DCM-125 user manual

Denzel

Denzel DCM-125 user manual

MAGNATRAC RS196K Attachment Assembly Instructions

MAGNATRAC

MAGNATRAC RS196K Attachment Assembly Instructions

Gilson SP-55 Quartermaster operating manual

Gilson

Gilson SP-55 Quartermaster operating manual

KM 4-40 C1M1 Original instructions

KM

KM 4-40 C1M1 Original instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.