Patriot Docks
Assembling the frame:
Two Li Tubes are joined together using the Mending Insert, secure
using 3/8”x 2” bolt. Repeat this step for the other Li Tubes as well
as for the two pair of Stringer Tubes. This will create the 9’ frame
pieces.
The Stringer Tubes are then secured to the Li Tubes using the pre-
drilled mounng holes and 3/8”x 2.5” bolts.
Aluminum Jack:
Each aluminum jack is mounted using
a Backer Plate and four 3/8”x2-1/2”
bolts. All the jack supports should be
orientated toward the entrance of
the li (as pictured).
Typically, the jack is mounted using
the very boom set of mounng
holes in the ange. For deeper water
applicaons the unit can be mounted
higher, creang a higher starng
point.
The drop leg base is comprised of
two pieces, bolt the vercal tube to
the at base then insert the vercal
into the jack and set desired height.
The jack fender is installed last using
two 3/8”x 3-1/2” bolts.
Glides are installed aer
frame has been assembled.
Mark the locaon where
the Glide will be installed
and pre-drill 1/8” pilot
holes. Use included
mounng screws to secure
the Glides.
54” Tubes
24” Insert
www.patriotdocks.com