manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Phase Technologies
  6. •
  7. Measuring Instrument
  8. •
  9. Phase Technologies 70Xi User manual

Phase Technologies 70Xi User manual

Other Phase Technologies Measuring Instrument manuals

Phase Technologies 70Xi-SS User manual

Phase Technologies

Phase Technologies 70Xi-SS User manual

Phase Technologies PHASE CONNECT PC4R User manual

Phase Technologies

Phase Technologies PHASE CONNECT PC4R User manual

Phase Technologies JFA-70X User manual

Phase Technologies

Phase Technologies JFA-70X User manual

Phase Technologies 70Xi Series Use and care manual

Phase Technologies

Phase Technologies 70Xi Series Use and care manual

Popular Measuring Instrument manuals by other brands

Powerfix Profi 278296 Operation and safety notes

Powerfix Profi

Powerfix Profi 278296 Operation and safety notes

Test Equipment Depot GVT-427B user manual

Test Equipment Depot

Test Equipment Depot GVT-427B user manual

Fieldpiece ACH Operator's manual

Fieldpiece

Fieldpiece ACH Operator's manual

FLYSURFER VIRON3 user manual

FLYSURFER

FLYSURFER VIRON3 user manual

GMW TG uni 1 operating manual

GMW

GMW TG uni 1 operating manual

Downeaster Wind & Weather Medallion Series instruction manual

Downeaster

Downeaster Wind & Weather Medallion Series instruction manual

Hanna Instruments HI96725C instruction manual

Hanna Instruments

Hanna Instruments HI96725C instruction manual

Nokeval KMR260 quick guide

Nokeval

Nokeval KMR260 quick guide

HOKUYO AUTOMATIC UBG-05LN instruction manual

HOKUYO AUTOMATIC

HOKUYO AUTOMATIC UBG-05LN instruction manual

Fluke 96000 Series Operator's manual

Fluke

Fluke 96000 Series Operator's manual

Test Products International SP565 user manual

Test Products International

Test Products International SP565 user manual

General Sleep Zmachine Insight+ DT-200 Service manual

General Sleep

General Sleep Zmachine Insight+ DT-200 Service manual

Sensa Core Lacto Spark user manual

Sensa Core

Sensa Core Lacto Spark user manual

VOLTCRAFT UTS-1980 operating instructions

VOLTCRAFT

VOLTCRAFT UTS-1980 operating instructions

EBCHQ 94915 Operation manual

EBCHQ

EBCHQ 94915 Operation manual

Balluff BIP LD2-T017-01-EP-S4 Series user guide

Balluff

Balluff BIP LD2-T017-01-EP-S4 Series user guide

Pulsar IMP Lite Series instruction manual

Pulsar

Pulsar IMP Lite Series instruction manual

ETCR 6800 user manual

ETCR

ETCR 6800 user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

70Xi Sample Injection Port – Quick Installation Guide
Page 1 of 2 Customer Service & Support: 604-241-9568
customer_service@phase-technology.com
1. Remove the ollowing items rom the 70xi analyzer box:
a) 1 70xi analyzer
b) 1 accessory box:
i) 1 AC power cable
ii) 1 dryer bottle
iii) 1 box labeled “Sample Injection Port”:
1 Sample Injection Port Assembly
1 plastic bag containing:

4 mounting screws

1 Sample IN Tubing (with 2 Swage ittings)

1 Sample OUT Tubing (with 1 Swage itting)
2. The analyzer should be set up:
on a lat, vibration- ree sur ace
in a well-ventilated location
3. Remove the caps on the back o the analyzer. Keep them
with the shipping boxes and related packing materials.
2 red plastic caps that cover the “PURGE IN” and “PURGE
OUT” ittings
2 brass caps that cover the “SAMPLE IN” and “SAMPLE
OUT” ittings
4. Connect the dryer bottle to the back o the analyzer:
a) Attach the dryer bottle to the
back o the analyzer by itting
the two mounting bracket holes
over the two mounting screws.
b) Separate the quick-connect
ittings on the dryer bottle. Press
the latch on the emale itting
and pull them apart.
c) Attach the quick-connect ittings
to the “PURGE IN” and “PURGE
OUT” ittings on the back o the
analyzer. A “click” sound
con irms that the ittings have
snapped into place.
5. Connect the AC power cable to the back o the analyzer.
Plug the power cables into a grounded AC outlet that is a
dedicated circuit. I the power source is unstable or noisy,
use a power surge protector, equipped with a line ilter.
6. Mount the Sample Injection Port Assembly onto the
analyzer cover with the 4 mounting screws, using a Philips
screw driver. Make sure the stainless steel tubing o the
Sample Injection Port Assembly point to the back o the
analyzer. Rotate the tubing i needed.
7. Install the Sample IN Tubing:
a) Connect the stainless steel
itting to the Sample Injection
Port Assembly, with two 7/16”
wrenches.
b) Connect the brass itting to the
port labeled “SAMPLE IN” at the
back o the analyzer, with a
7/16” wrench.
8. Install the Sample OUT Tubing:
a) Connect the brass itting to the
port labeled “SAMPLE OUT” at
the back o the analyzer, with a
7/16” wrench.
b) Put the ree end into a user-supplied waste bottle.
Ensure the end o this tubing stays above the e luent
level in the waste bottle at all times (i.e. tubing end
should never be submerged into the e luent).
70Xi Sample Injection Port – Quick Installation Guide
Page 2 of 2 Customer Service & Support: 604-241-9568
customer_service@phase-technology.com
9. Power up the analyzer:
Press the round button at the bottom right hand side at
the ront o the analyzer.
The analyzer will per orm a set o sel tests to veri y its
main components, including the optics system and
cooling system, are operating correctly.
I a problem is detected, the sel tests will stop and a
message will be displayed on the bottom o the screen.
I any component ails the sel tests, press the
INTELLINOSTICS button or urther in ormation
and troubleshooting steps.
I the pour point unction is available, the analyzer will
automatically per orm an auto-purge process a ter the
sel tests.
10. A ter the sel -tests are completed, the analyzer shows
the Home screen.
The analyzer returns to this screen whenever
the HOME button is pressed.
The Sample Cup Temperature, Optics Light Signal, and
Run Count are displayed at the top o the screen.
A set o Favorites buttons is listed on the right hand
side o the screen.
The ACCESS button on the lower le t hand
corner is used or changing user access levels,
resetting the analyzer, and shutdown.
11. To start a test:
a) Fill a vial with sample all the way to the neck.
b) Li t the probe by
sliding up the arm.
c) Place the vial to the
indentation at the
base.
d) Lower the probe by
sliding down the arm.
e) The black handle
should sit on top o
the mouth o the vial.
) To start a run using a prede ined test setting,
press and hold ( or one second) one o the avorite
buttons.