
®
LV-7 Ballnut Replacement Instructions
T02-014.00
This process should take approximately ¾ - 1 hour.
Step A: Remove the Screw Guard
PROCEDURE: Swing the LiftGate unit out of the vehicle and engage the base main arm lock pin.
Extend the unit until the toeplate is just touching the ground. This is to make disengaging the outer
frame from the screw assembly easier.
Move the circuit breaker switch to the OFF position and depress the red heavy duty switch to OFF.
Remove the two (2) Phillips screws from the top of the screw guard and the remove guard.
Step B: Remove the Drive Screw Assembly
PROCEDURE: Remove the four (4) top ¼” countersunk screws holding the bearing retainer (7/16”
wrench and 5/32” Allen key).
Remove the shim from between the bearing retainer and the inner frame.