Prolyft PLE-30-044 User manual

Before using the controller hoist,
fill in the information below:
Model No.
Purchase Date
Service point
Should you have any questions or have problems with this
product, please call Prolyft at +31 (0)594 85 15 15

CONTENT
SYSTEM DESCRIPTION 3
LIMITATIONS OF USE 3
INDENTIFICATION 3
ELECTRICAL CONNECTIONS 3
DO’S AND DON’TS 5
PLE-30-044 4-WAY FOR DIRECT CONTROLLED HOIST 6
• PICTURE 6
• FUNCTIONAL DESCRIPTION 6
• WIRING DIAGRAM 7
PLE-30-083 8-WAY FOR DIRECT CONTROLLED HOIST 9
• PICTURE 9
• FUNCTIONAL DESCRIPTION 9
• WIRING DIAGRAM 10
PLE-30-123 12-WAY FOR DIRECT CONTROLLED HOIST 12
• PICTURE 12
• FUNCTIONAL DESCRIPTION 12
• WIRING DIAGRAM 13
PHASE FAILURE PROTECTOR 15
REMOTE CONTROL 15
GUARANTEE 16
TROUBLE SHOOTING 16
1-WAY HANDHELD DIAGRAM 17
2-WAY HANDHELD DIAGRAM 18
4-WAY BASIC DIAGRAM 19
8-WAY BASIC DIAGRAM 20
12-WAY BASIC DIAGRAM 21

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 3 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
SYSTEM DESCRIPTION
Prolyte has designed a range of controllers that can be used in
conjunction with the Prolyft chain hoist, but also with most other
types of Direct controlled chain hoists, provided they will fit the
electrical limits of this equipment.
To be able to control your chain hoist on low voltage control,
please contact your nearest Prolyft Service Point. They can supply
you with adequate controllers and manuals.
All controllers have a custom-build, sturdy steel 19” rack hous-
ing. The housing is 3HE OR 4HE (12-WAY) high and has a black
powder coated finish.
All selected electrical components meet the needs for industrial use
and requirements stated in the EC machine directive, EN standards
and IEC and FEM regulations.
All controllers can be daisy linked to create a multi channel con-
troller. By means of cable, article code: PLA-35-001
LIMITATION OF USE
All controllers are designed work in conjunction with the Prolyft
chain hoist. It is also allowed to use them with other brands of
Direct controlled chain hoists, if provided they fit within the
electrical limits of this equipment.
Controllers may only be used in areas, which are secured against
environmental influences and with operating temperatures from
-20 degree Celsius till +40 degree Celsius.
IP factor 40.
MODELS PLE-30-044 / PLE 30-083 / PLE 30-123
• Operating voltage = 400V 3p+N+G at 50Hz
• Max. voltage drop is -20% and + 10%
• Maximum switching capacity 3.3 amps / 1,5kw at 400V
4.6 amps / 1,1kw at 230V
To operate controllers on 208/230v 3P + N +G at 60Hz
Please reconnect wires as per the electrical scheme on page 7,
drawing 4-1.
Inside the controllers these wires are marked.
IDENTIFICATION
Prolyft controllers can be identified by the model number on the
front side. These numbers refer to the information in the user
manual and the CE declaration of conformity.
4-way controller basic 19” version Width 483mm
Height 134mm
Depth 440mm
15,5 Kg
8-way controller basic 19” version Width 483mm
Height 134mm
Depth 440mm
17,5 Kg
12-way controller basic 19”
version with thermal motor
protectors
Width 483mm
Height 178mm
Depth 440mm
20,5 Kg
ELECTRICAL CONNECTIONS
Prolyft can supply a full range of cabling to make your system
work. Cabling should comply with the applicable standards.
Decent plugs should be used. All cabling should be tested on
functionality and resistance in Ohms. Failures in cabling and plugs
could cause mall function of the hoist and controllers.
CONNECTION DATA OF C-FORM PLUgS AND
MULTI PLUgS
Wiring tables should be respected at any time to avoid damage to
the hoist and controllers
L1 / U1 Brown Brown 1
L2 / V1 Black Black 2
L3 / W1 Grey/Black Black 3
PE / ground Yellow/Green Yellow/Green GND
Zero Blue Blue N
L1 / U1 Brown white 1
L2 / V1 Blue Blue 2
L3 / W1 Grey/Black Red 3
PE / ground Yellow/Green Green GND

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 4 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
L1 Brown 110Vac 1
L2 Grey Up 2
L3 Black Down 3
PE / ground Yellow/Green GND
L1 Brown 1
L2 Black 2
L3 Black 3
GND Yellow/Green 4
L1 Brown 5
L2 Black 6
L3 Black 7
GND Yellow/Green 8
L1 Brown 9
L2 Black 10
L3 Black 11
GND Yellow/Green 12
L1 Brown 13
L2 Black 14
L3 Black 15
GND Yellow/Green 16+pe
L1 1 1
L2 2 2
L3 3 3
GND 4 4
L1 5 5
L2 6 6
L3 7 7
GND 8 8
L1 9 9
L2 10 10
L3 11 11
GND 12 12
L1 13 13
L2 14 14
L3 15 15
GND 16 16+pe
400V/50hz 230v/60hz 400V/50hz 230v/60hz
250KG 230 75 255 80
500 KG 100 40 110 45
1000KG 65 25 75 25
2000KG 65 25 75 25
The table above gives an indication of the maximum length of
cables between controller and hoist. Lengths are calculated in
accordance to EN 60204 and for the worst case situation.
If power cords with 1,5q/mm wires are connected to 2,5q/mm
wired cords the one with the smallest cross section determines the
maximum length.
The charts have been calculated with a maximum voltage
drop of 5%.

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 5 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
DO’S AND DON’TS
Do’s
• Use the controller within the technical scope of the FEM class of
the Prolyft hoist. Longer operating time could severely damage
controller and hoist.
• Mount the controller in a protective casing
• Handle the controller only by the grips of the case
• Store the controller in its normal operating position away from
aggressive atmospheres (dust, humidity…).
• Make sure that the controller is always clean and protected from
corrosion.
• Only a competent person may install and operate the controller
• Make sure that connecting cables are in good condition and
connectors are fitted properly.
• Make sure that connecting cables are always symmetrical fitted.
• If the hoist direction is different from the Up /down indicators on
the controller, check intermediary cabling and change phases
by means of phase reverse facility in the CEE plug at the main
power cord
• Use only original parts in case of repair or replacements.
• During operation of the control, always remain alert. In case of
emergency, press the emergency stop button, this will inactivate
all functions of the control.
• Before operation, check if the load is correctly fastened and at-
tached to the hook. Do make sure the hook latches, if used, are
closed and not supporting any part of the load.
• Make sure you have an unobstructed view on the full travel path
of the load.
• Make sure that the load is in the correct position before moving
it.
• Make sure that each hoist is an exact vertical position to the load
and that the load chain is unobstructed, before operating the
controller.
• If used out doors, use sufficient protection against bad weather
conditions.
• Use the material under normal working conditions (ambient
temperature, atmosphere….)
• Moving a single load or truss system requires experienced and
competent operators.
• All the necessary precautions should be taken to ensure a correct
distribution of the load and to avoid overloading of a single hoist
when multiple hoists are used on one grid. The hoists should be
checked individually before they will be moved.
• Notify the responsible and competent person after a dangerous
operation or if the hoist seems no to function properly.
• Clear the area from obstacles and people and switch working
lights on before operating the controls.
• No people are being allowed under the load.
Don’ts
• Never connect a Prolyft controller to a power source other than
specified on the unit.
• Never modify the controller unless the manufacturer has
authorised the modification.
• Never modify the values and adjustments of the safety
components outside the limits provided in the manual, or without
the approval of the manufacturer
• Never try to repair or intervene on the controller without the
authorisation of the manufacturer or a qualified electrician.
• No unqualified personnel should operate the controller
• Never connect more hoists then the available number of outlets
(channels) or number of selector switches available.
• Do not use additional splitters to connect more than one hoist
per channel.
• Avoid shocks or accidental collision with other objects.
• Never open the controller as long as the system is under power.
• Never block, or lock the RUN button in order to continue a
movement without manual interference.
• Do not operate the controller if your physical condition does not
allow it.
• Never use the controller if it is in bad condition.
• Never use suspected spare parts or parts whose origin is not
known.
• Do not subject the controller to brutal shocks.
• Never distract the operator’s attention while he is operating the
system.
• Do not use the controller for a purpose or in an area for which it
is not intended.
• Do not expose the controller to an aggressive atmosphere
(temperature, acidity…)
• Do not use the safety components as operation components
(emergency button, main fuse switch. etc…)
• Do not use the controls needlessly (avoid inching – stop-start
operation of the buttons). This can cause overheating and even
damage to the hoist.
• Do not change the operating direction whilst the RUN button is
pressed (hoist under power).
• If the hoist direction doesn’t match with the indications on the
controller, don’t change phases inside the controller but check
the interconnecting cables or the individual hoist, after having
disconnected all power cables.
• Never use hoists who are running in the opposite direction of the
selected direction.
• Do not connect the controller to an unknown power supply;
check if the power source matches the specifications of the
controller and the hoists. (under voltage or over voltage =/- 5%,
absence of phase etc….)

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 6 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
PLE-30-044
4-WAY FOR DIRECT CONTROLLED HOIST
1. 19” 3U rack housing
2. Front plate release bolts
3. Mains switch 3 phase short circuit breaker
4. Short circuit protection for power and control
5. Up-0-Down switch for pre-selecting the individual hoist
direction
6. Emergency button
7. Run button
8. Phase failure protection
9. Power cable of 150cm with 32A-5p CEE plug with phase
reverse plug
10. Output HARTING 16p connector
11. Link option to daisy link multiple controllers for operating
lager quantity of hoist with Hirschmann CA3LS connector
FUNCTIONAL DESCRIPTION:
1. Measure the main power supply to be sure the operating
voltage is correct and all the phases are present
2. Release the emergency button by turning it anti-clockwise
3. Connect the controller to the power supply and switch it
on using the main switch
4. Connect power cords to each of the hoists to be operated.
4 single cords can be connected to one multi cord.
5. Connect the power cords to the controller by using a
break-out (HARTING 16p > 4 x 16A 4p) or connect the
multi cord to the controller.
6. Link the controllers if you want to operate more than
4-channels using one “run-button”.
7. Check if the pre-selection switches for all hoist are in the
“0 “ position
8. Select a hoist and switch it in the up or down direction.
Press the run button for 2 seconds to make sure the hoist
has power and if the running direction of the hoist
matches the selected direction on the controller.
Up is green LED, down is red LED.
9. If the direction of the hoist is not correct, change phases
using the phase change plug on the power cable.
10. If individual hoist run in the wrong direction, check
intermediate cabling or check the hoist.
11. Make sure that the load to be lifted is in the correct
position
12. Clear the area from obstacles
13. No people are allowed under or on the load. Make sure all
people have left the operating area before you start to
move any load.
14. Make sure you have an unobstructed view on the full
travel path of the load.
15. Pre-Select all hoist needed in the up or down direction
16. Press the run button to activate all hoists and hold it till the
load has reached the desired height. It may be necessary
to level the rig at certain stages.
17. Never press the run button staccato. This can severely
damage controller and hoist.
18. If the desired height is reached release the run button,
and switch of the mains power switch.
19. In case more hoist need to be operated than the controller
allows, you can daisy link two or more controllers by
means of the link cable. The emergency breaker only
works for the controller from which the breaker is pushed!
NEVER change the running direction of a hoist when the run
button is pushed
- Use only cable and connectors, which are in
good condition
- Never connect more than one hoist per
channel
- Not respecting this manual can cause severe
injury or even death
7
6
5
2
3 4 8
1
11
10 9

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 7 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
F1
F2
F3
1
2
5
6
3
4
N
N
F1
Phasen kontroler
K1
L1 L2 L3
1 2 3
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
T1
T2
T3
L1
L2
L3
A B C D E F
1
2
3
4
5
6
G H
7
N
PE
R1.1
R2
R2.2
R3
R3.3
R4
R4.4
R1
PROLYFT
CONTROL BOX 4 KANNAL
Version 8
Datum : 23.07.2010
Seite : 1
M.ASLANIDISGEZ:
TYP: PLE 30-044
LEGENDA
S1- EMERGENCY STOP
S2 - PUSH BUTTON START
F1 - CICUIT BREAKER
F2 - CICUIT BREAKER
K1 - CONTACTOR
To make Controler suitable to operate on 208V 3 Phase
Disconnect wire N and connect wire N to Number 6.Do not Link N and wire 6
Wire for 208 V Operation
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S3 S4 S5 S6
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R1 R1.1 R2.2 R3.3 R4.4R4R3R2
R1 R1.1 R2 R2.2 R3 R3.3 R4 R4.4
A1
A2
7
8
R5
A1
A2
1
2
3
1
2
3
1
2N
N
F2
S1
S2
R5
K1
PH1
21
22
14
13
2
3
14
13
Master Conector 1
Master Conector 2
8
9
I J K
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
U1/1
V1/1
W1/1
U1/2
V1/2
W1/2
U1/3
V1/3
W1/3
U1/4
V1/4
W1/4
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
Q1
DIN RAIL COVER
Operation Current
Main Stream
Current Tax 230VAC
400VAC
230VAC
Black
Blue
Brown
Brown
Black
When is using the MKC-06 Relai in the
controler have to be cross the L2 and L3 by the K1

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 8 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
F1
F2
F3
1
2
5
6
3
4
N
N
F1
Phasen kontroler
K1
L1 L2 L3
1 2 3
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
T1
T2
T3
L1
L2
L3
A B C D E F
1
2
3
4
5
6
G H
7
N
PE
R1.1
R2
R2.2
R3
R3.3
R4
R4.4
R1
PROLYFT
CONTROL BOX 4 KANNAL
Version 8
Datum : 23.07.2010
Seite : 1
M.ASLANIDISGEZ:
TYP: PLE 30-044
LEGENDA
S1- EMERGENCY STOP
S2 - PUSH BUTTON START
F1 - CICUIT BREAKER
F2 - CICUIT BREAKER
K1 - CONTACTOR
To make Controler suitable to operate on 208V 3 Phase
Disconnect wire N and connect wire N to Number 6.Do not Link N and wire 6
Wire for 208 V Operation
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S3 S4 S5 S6
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R1 R1.1 R2.2 R3.3 R4.4R4R3R2
R1 R1.1 R2 R2.2 R3 R3.3 R4 R4.4
A1
A2
7
8
R5
A1
A2
1
2
3
1
2
3
1
2N
N
F2
S1
S2
R5
K1
PH1
21
22
14
13
2
3
14
13
Master Conector 1
Master Conector 2
8
9
I J K
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
U1/1
V1/1
W1/1
U1/2
V1/2
W1/2
U1/3
V1/3
W1/3
U1/4
V1/4
W1/4
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
Q1
DIN RAIL COVER
Operation Current
Main Stream
Current Tax 230VAC
400VAC
230VAC
Black
Blue
Brown
Brown
Black
When is using the MKC-06 Relai in the
controler have to be cross the L2 and L3 by the K1
A
B
Hand Remote Controler Info:
By the Main Controllers with the Serial Number 0000-0034
Is to disconnect the wire from the A position and
to connect this by the B position to make
the controller suitable to operate with a Hand remote controller
PLE_30_043

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 9 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
PLE-30-083
8-WAY FOR DIRECT CONTROLLED HOIST
1. 19” 3U rack housing
2. Front plate release bolts
3. Mains switch 3 phase short circuit breaker
4. Short circuit protection for power and control
5. Up-0-Down switch for pre-selecting the individual hoist
direction
6. Emergency button
7. Run button
8. Phase failure protection
9. Power cable of 100cm with 32A-5p CEE plug with phase
reverse plug
10. 2 x Output HARTING 16p connector
11. Link option to daisy link multiple controllers for operating
lager quantity of hoist with Hirschmann CA3LS connector
FUNCTIONAL DESCRIPTION:
1. Measure the main power supply to be sure the operating
voltage is correct and all the phases are present
2. Release the emergency button by turning it anti-clockwise
3. Connect the controller to the power supply and switch it on
using the main switch
4. Connect power cords to each of the hoists to be operated.
4 single cords can be connected to one multi cord.
5. Connect the power cords to the controller by using a
break-out (HARTING 16p > 4 x 16A 4p) or connect the
multi cord to the controller.
6. Link the controllers if you want to operate more than
4-channels using one “run-button”.
7. Check if the pre-selection switches for all hoist are in the
“0 “ position
8. Select a hoist and switch it in the up or down direction.
Press the run button for 2 seconds to make sure the hoist
has power and if the running direction of the hoist matches
the selected direction on the controller.
Up is green LED, down is red LED
9. If the direction of the hoist is not correct, change phases
using the phase change plug on the power cable.
10. If individual hoist run in the wrong direction, check
intermediate cabling or check the hoist.
11. Make sure that the load to be lifted is in the correct position
12. Clear the area from obstacles
13. No people are allowed under the load. Make sure all
people have left the operating area before you start to
move any load.
14. Make sure you have an unobstructed view on the full travel
path of the load.
15. Pre-Select all hoist needed in the up or down direction
16. Press the run button to activate all hoists and hold it till the
load has reached the desired height. It may be necessary to
level the rig at certain stages.
17. Never press the run button staccato. This can severely
damage controller and hoist.
18. If the desired height is reached release the run button, and
switch of the mains power switch.
19. In case more hoist need to be operated than the controller
allows, you can daisy link two or more controllers by means
of the link cable. The emergency breaker only works for the
controller from which the breaker is pushed!
NEVER change the running direction of a hoist when the run
button is pushed
- Use only cable and connectors, which are in
good condition
- Never connect more than one hoist per
channel
- Not respecting this manual can cause severe
injury or even death
653 4 8
7 21
9
10 11

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 10 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
F4
F5
F6
1
2
5
6
3
4
N
N
F1
Phasen kontroler
K1
L1 L2 L3
1 2 3
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
T1
T2
T3
L1
L2
L3
A B C D E F
1
2
3
4
5
6
G H
7
N
PE
R1.1
R2
R2.2
R3
R3.3
R4
R4.4
R1
PROLYFT CONTROL BOX 8 KANNAL
Version 8
Datum : 23.07.2010
Seite : 1
M.ASLANIDISGEZ:
TYP: PLE 30-083
LEGENDA
S1- EMERGENCY STOP
S2 - PUSH BUTTON START
F1 - CICUIT BREAKER
F2 - CICUIT BREAKER
K1 - CONTACTOR
To make Controler suitable to operate on 208V 3 Phase
Disconnect wire N and connect wire N to Number 6.Do not Link N and wire 6
Wire for 208 V Operation
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S3 S4 S5 S6
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R1 R1.1 R2.2 R3.3 R4.4R4R3R2
R1 R1.1 R2 R2.2 R3 R3.3 R4 R4.4
A1
A2
7
8
R9
A1
A2
1
2
3
1
2
3
1
2N
N
F2
S1
S2
R9
K1
PH1
21
22
14
13
2
3
14
13
Master Conector 1
Master Conector 2
8
9
I J K
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
U1/1
V1/1
W1/1
U1/2
V1/2
W1/2
U1/3
V1/3
W1/3
U1/4
V1/4
W1/4
Q1
DIN RAIL COVER
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
R5.5
R6
R6.6
R7
R7.7
R8
R8.8
R5
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
MOTOR 5
MOTOR 6
MOTOR 7
MOTOR 8
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S7 S8 S9 S10
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R5 R5.5 R6.6 R7.7 R8.8R8R7R6
R5 R5.5 R6 R6.6 R7 R7.7 R8 R8.8
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 5
MOTOR 6
MOTOR 7
MOTOR 8
U1/5
V1/5
W1/5
U1/6
V1/6
W1/6
U1/7
V1/7
W1/7
U1/8
V1/8
W1/8
Q2
L M
10
When is using the MKC-06 Relai in the
controler have to be cross the L2 and L3 by the K1
Operation Current
Main Stream
Current Tax 230VAC
400VAC
230VAC
Black
Blue
Brown
Brown
Black
Hand Remote Controler Info:
By the Main Controllers with the Serial Number 0000-0034
Is to disconnect the wire from the A position and
to connect this by the B position to make
the controller suitable to operate with a Hand remote controller
PLE_30_043
A
B

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 11 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
F4
F5
F6
1
2
5
6
3
4
N
N
F1
Phasen kontroler
K1
L1 L2 L3
1 2 3
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
T1
T2
T3
L1
L2
L3
A B C D E F
1
2
3
4
5
6
G H
7
N
PE
R1.1
R2
R2.2
R3
R3.3
R4
R4.4
R1
PROLYFT CONTROL BOX 8 KANNAL
Version 8
Datum : 23.07.2010
Seite : 1
M.ASLANIDISGEZ:
TYP: PLE 30-044
LEGENDA
S1- EMERGENCY STOP
S2 - PUSH BUTTON START
F1 - CICUIT BREAKER
F2 - CICUIT BREAKER
K1 - CONTACTOR
To make Controler suitable to operate on 208V 3 Phase
Disconnect wire N and connect wire N to Number 6.Do not Link N and wire 6
Wire for 208 V Operation
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S3 S4 S5 S6
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R1 R1.1 R2.2 R3.3 R4.4R4R3R2
R1 R1.1 R2 R2.2 R3 R3.3 R4 R4.4
A1
A2
7
8
R9
A1
A2
1
2
3
1
2
3
1
2N
N
F2
S1
S2
R9
K1
PH1
21
22
14
13
2
3
14
13
Master Conector 1
Master Conector 2
8
9
I J K
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
U1/1
V1/1
W1/1
U1/2
V1/2
W1/2
U1/3
V1/3
W1/3
U1/4
V1/4
W1/4
Q1
DIN RAIL COVER
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
R5.5
R6
R6.6
R7
R7.7
R8
R8.8
R5
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
MOTOR 5
MOTOR 6
MOTOR 7
MOTOR 8
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S7 S8 S9 S10
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R5 R5.5 R6.6 R7.7 R8.8R8R7R6
R5 R5.5 R6 R6.6 R7 R7.7 R8 R8.8
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 5
MOTOR 6
MOTOR 7
MOTOR 8
U1/5
V1/5
W1/5
U1/6
V1/6
W1/6
U1/7
V1/7
W1/7
U1/8
V1/8
W1/8
Q2
L M
10
When is using the MKC-06 Relai in the
controler have to be cross the L2 and L3 by the K1
Operation Current
Main Stream
Current Tax 230VAC
400VAC
230VAC
Black
Blue
Brown
Brown
Black
Hand Remote Controler Info:
By the Main Controllers with the Serial Number 0000-0034
Is to disconnect the wire from the A position and
to connect this by the B position to make
the controller suitable to operate with a Hand remote controller
PLE_30_043
A
B

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 12 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
PLE-30-123
12-WAY FOR DIRECT CONTROLLED HOIST
1. 19” 4U rack housing
2. Front plate release bolts
3. Mains switch 3 phase short circuit breaker
4. Short circuit protection for power and control
5. Up-0-Down switch for pre-selecting the individual hoist
direction
6. Emergency button
7. Run button
8. Phase failure protection
9. Power cable of 100cm with 32A-5p CEE plug with phase
reverse plug
10. 3 x Output HARTING 16p connector
11. Link option to daisy link multiple controllers for operating
lager quantity of hoist with Hirschmann CA3LS connector
FUNCTIONAL DESCRIPTION:
1. Measure the main power supply to be sure the operating
voltage is correct and all the phases are present
2. Release the emergency button by turning it anti-clockwise
3. Connect the controller to the power supply and switch it on
using the main switch
4. Connect power cords to each of the hoists to be operated.
4 single cords can be connected to one multi cord.
5. Connect the power cords to the controller by using a
break-out (HARTING 16p > 4 x 16A 4p) or connect the
multi cord to the controller.
6. Link the controllers if you want to operate more than
4-channels using one “run-button”.
7. Check if the pre-selection switches for all hoist are in the
“0 “ position
8. Select a hoist and switch it in the up or down direction.
Press the run button for 2 seconds to make sure the hoist
has power and if the running direction of the hoist matches
the selected direction on the controller.
Up is green LED, down is red LED.
9. If the direction of the hoist is not correct, change phases
using the phase change plug on the power cable.
10. If individual hoist run in the wrong direction, check
intermediate cabling or check the hoist.
11. Make sure that the load to be lifted is in the correct position
12. Clear the area from obstacles
13. No people are allowed under the load. Make sure all
people have left the operating area before you start to
move any load.
14. Make sure you have an unobstructed view on the full travel
path of the load.
15. Pre-Select all hoist needed in the up or down direction
16. Press the run button to activate all hoists and hold it till the
load has reached the desired height. It may be necessary to
level the rig at certain stages.
17. Never press the run button staccato. This can severely
damage controller and hoist.
18. If the desired height is reached release the run button, and
switch of the mains power switch.
19. In case more hoist need to be operated than the controller
allows, you can daisy link two or more controllers by means
of the link cable. The emergency breaker only works for the
controller from which the breaker is pushed!
NEVER change the running direction of a hoist when the run
button is pushed
- Use only cable and connectors, which are in
good condition
- Never connect more than one hoist per
channel
- Not respecting this manual can cause severe
injury or even death
653 4 8
7 21
10
11
9

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 13 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
F7
F8
F9
1
2
5
6
3
4
N
N
F1
Phasen kontroler
K1
L1 L2 L3
1 2 3
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
T1
T2
T3
L1
L2
L3
A B C D E F
1
2
3
4
5
6
G H
7
N
PE
R1.1
R2
R2.2
R3
R3.3
R4
R4.4
R1
PROLYFT CONTROL BOX 12 KANNAL
Version 8
Datum : 23.07.2010
Seite : 1
M.ASLANIDISGEZ:
TYP: PLE 30-123
LEGENDA
S1- EMERGENCY STOP
S2 - PUSH BUTTON START
F1 - CICUIT BREAKER
F2 - CICUIT BREAKER
K1 - CONTACTOR
To make Controler suitable to operate on 208V 3 Phase
Disconnect wire N and connect wire N to Number 6.Do not Link N and wire 6
Wire for 208 V Operation
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S3 S4 S5 S6
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R1 R1.1 R2.2 R3.3 R4.4R4R3R2
R1 R1.1 R2 R2.2 R3 R3.3 R4 R4.4
A1
A2
7
8
R13
A1
A2
1
2
3
1
2
3
1
2N
N
F2
S1
S2
R13
K1
PH1
21
22
14
13
2
3
14
13
Master Conector 1
Master Conector 2
8
9
I J K
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
U1/1
V1/1
W1/1
U1/2
V1/2
W1/2
U1/3
V1/3
W1/3
U1/4
V1/4
W1/4
Q1
DIN RAIL COVER
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
R5.5
R6
R6.6
R7
R7.7
R8
R8.8
R5
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
MOTOR 5
MOTOR 6
MOTOR 7
MOTOR 8
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S7 S8 S9 S10
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R5 R5.5 R6.6 R7.7 R8.8R8R7R6
R5 R5.5 R6 R6.6 R7 R7.7 R8 R8.8
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 5
MOTOR 6
MOTOR 7
MOTOR 8
U1/5
V1/5
W1/5
U1/6
V1/6
W1/6
U1/7
V1/7
W1/7
U1/8
V1/8
W1/8
Q2
L M
10
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
R9.9
R10
R10.10
R11
R11.11
R12
R12.12
R9
MOTOR 9
MOTOR 10
MOTOR 11
MOTOR 12
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 9
MOTOR 10
MOTOR 11
MOTOR 12
U1/9
V1/9
W1/9
U1/10
V1/10
W1/10
U1/11
V1/11
W1/11
U1/12
V1/12
W1/12
Q3
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S11 S12 S13 S14
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R9 R9.9
R10.10 R11.11 R12.12
R12R11R10
R9 R9.9 R10 R10.10 R11 R11.11 R12 R12.12
Operation Current
Main Stream
Current Tax 230VAC
400VAC
230VAC
Black
Blue
Brown
Brown
Black
When is using the MKC-06 Relai in the
controler have to be cross the L2 and L3 by the K1
Relai Plate
11
12
13
N O P Q
Hand Remote Controler Info:
By the Main Controllers with the Serial Number 0000-0034
Is to disconnect the wire from the A position and
to connect this by the B position to make
the controller suitable to operate with a Hand remote controller
PLE_30_043
A
B

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 14 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
F7
F8
F9
1
2
5
6
3
4
N
N
F1
Phasen kontroler
K1
L1 L2 L3
1 2 3
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
T1
T2
T3
L1
L2
L3
A B C D E F
1
2
3
4
5
6
G H
7
N
PE
R1.1
R2
R2.2
R3
R3.3
R4
R4.4
R1
PROLYFT CONTROL BOX 12 KANNAL
Version 8
Datum : 23.07.2010
Seite : 1
M.ASLANIDISGEZ:
TYP: PLE 30-044
LEGENDA
S1- EMERGENCY STOP
S2 - PUSH BUTTON START
F1 - CICUIT BREAKER
F2 - CICUIT BREAKER
K1 - CONTACTOR
To make Controler suitable to operate on 208V 3 Phase
Disconnect wire N and connect wire N to Number 6.Do not Link N and wire 6
Wire for 208 V Operation
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S3 S4 S5 S6
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R1 R1.1 R2.2 R3.3 R4.4R4R3R2
R1 R1.1 R2 R2.2 R3 R3.3 R4 R4.4
A1
A2
7
8
R13
A1
A2
1
2
3
1
2
3
1
2N
N
F2
S1
S2
R13
K1
PH1
21
22
14
13
2
3
14
13
Master Conector 1
Master Conector 2
8
9
I J K
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
U1/1
V1/1
W1/1
U1/2
V1/2
W1/2
U1/3
V1/3
W1/3
U1/4
V1/4
W1/4
Q1
DIN RAIL COVER
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
R5.5
R6
R6.6
R7
R7.7
R8
R8.8
R5
MOTOR 1
MOTOR 2
MOTOR 3
MOTOR 4
MOTOR 5
MOTOR 6
MOTOR 7
MOTOR 8
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S7 S8 S9 S10
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R5 R5.5 R6.6 R7.7 R8.8R8R7R6
R5 R5.5 R6 R6.6 R7 R7.7 R8 R8.8
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 5
MOTOR 6
MOTOR 7
MOTOR 8
U1/5
V1/5
W1/5
U1/6
V1/6
W1/6
U1/7
V1/7
W1/7
U1/8
V1/8
W1/8
Q2
L M
10
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
66
5
4
3
2
1
6
5
4
3
2
1
R9.9
R10
R10.10
R11
R11.11
R12
R12.12
R9
MOTOR 9
MOTOR 10
MOTOR 11
MOTOR 12
PE
7
10
11
12
13
14
15
16
1
2
3
4
5
6
8
9
MOTOR 9
MOTOR 10
MOTOR 11
MOTOR 12
U1/9
V1/9
W1/9
U1/10
V1/10
W1/10
U1/11
V1/11
W1/11
U1/12
V1/12
W1/12
Q3
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
A1
A2
A1
A2
4 6
S11 S12 S13 S14
7
8
7
8
7
8
7
8
7
8
7
8
7
8
7
8
R9 R9.9
R10.10 R11.11 R12.12
R12R11R10
R9 R9.9 R10 R10.10 R11 R11.11 R12 R12.12
Operation Current
Main Stream
Current Tax 230VAC
400VAC
230VAC
Black
Blue
Brown
Brown
Black
When is using the MKC-06 Relai in the
controler have to be cross the L2 and L3 by the K1
Relai Plate
11
12
13
N O P Q
Hand Remote Controler Info:
By the Main Controllers with the Serial Number 0000-0034
Is to disconnect the wire from the A position and
to connect this by the B position to make
the controller suitable to operate with a Hand remote controller
PLE_30_043
A
B

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 15 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
Remote control
PLE-30-043
REMOTE CONTROL
A remote control for the PLE-030 series is available.
The master and connected slaves can be controlled with this
remote unit.
The remote should be plugged into link connector.
The remote works as a run button and emergency stop only.
Individual presets for each hoist have to be made with the pre-set
switches first.
PHASE FAILURE PROTECTOR
This document describes the phase failure protector inside the
Prolyft PLE 30 and 40 series controllers
Phase Failure
- When all phases are present and in correct order LED no: 1 (On)
and LED no: 2 (Out) are lighten ON
- When phases are not in correct order LED no: 1 (On) and LED
no: 3 (Phs Seq.) are lighten ON. In this case the phases shall be
turned. This can be done by disconnecting the controller.
The power cord is equipped with a phase reverse plug.
Use a screwdriver to turn phases.
- In case of missing phases or when there is a voltage unbalance
of 15% or more between phases, LED no: 1 (On) and LED no: 4
(Asm.) are lighten ON. In this case the controllers main relay is
not activated.
Voltage Unbalance:
When the phase to phase voltage unbalance is less than the
adjusted value by the user, the output relay is activated.
If the unbalance value exceeds the limit value (5%-15%) (to be set
by the user), the output relay is switched OFF at the end of delay
time (0,1....10s) ( also to be set by the user ). LED No: 2 (Out) is
lighten OFF, and Asymmetry error LED no: 4 (Asm.) is lighten ON.
If the fault disappears within the delay time, the output relay is not
switched OFF.
The voltage unbalance occurs if the L1,L2,L3 are loaded
unequally. This can be caused by a non-uniform distribution of
loads on the lines. The voltage asymmetry causes a rise of the
motor temperature and a reduction of the rated motor power.
Voltage asymmetry limit values can be adjusted between 5% and
15%. The Hysteresis is fixed at 20%
Example:
Given 3x380V supply with 10% asymmetry, relay switches OFF at:
380 - (380 x 10%) = 342V
Relay switches ON at: 342 + (342 x 10% x 20%) = 348V
3 4 1 2

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 16 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
gUARANTEE
1) Prolyft controllers are delivered with a one-year guarantee.
2) If for a reason outside the control of the vendor, the delivery is
delayed, the time lag cannot exceed three months.
3) If the use (installation) of the controller is delayed, the
corresponding extension of the guarantee (a single extension
limited to three months) must be requested, and written
confirmation obtained.
4) The vendor undertakes to eliminate all operating errors
originating from the concept, the execution, the components or
the materials themselves.
5) The guarantee does not cover normal wear, or the failures
resulting from abnormal use. It does not cover damage due to
a lack of supervision, to false operation or to a bad utilisation
of the controller, particularly due to overload, inching, under
voltage or over voltage or connecting errors.
6) The guarantee does not apply when there is disassembly,
modification or replacement of parts (mechanical or electrical)
by an unauthorised party or without our prior agreement.
7) The guarantee only applies for original, factory-installed spare
parts. For the duration of the guarantee, the vendor undertakes
to replace or repair, free of charge, the parts, in his workshop,
that are acknowledged to be damaged following examination
by a qualified and authorised service.
8) The guarantee excludes any other services or indemnities.
The repairs covered by the guarantee are carried out, as a rule,
in the workshops of the vendor or authorised agent.
When servicing of the equipment is done outside these
workshops, the labour costs for disassembly or assembly of
these parts are borne by the vendor when these are done
exclusively by his staff or by an authorised agent.
9) The replaced parts become the property of the vendor and
must be returned to the vendor at his expense.
10) For components of a relative particular importance that are not
manufactured by the vendor and which carry the brand name
of specialised manufacturers, the manufacturer’s guarantee
(which can vary according to the manufacturer) is applicable.
*The guarantee does not apply for expendable parts defined by the
manufacturer:
- Fuses
- Contactor contacts
1) Check cabling and connections Connect properly / measure
2) Corresponding switch is pre-selected in the “0” position Select “up” or “down”
3) Thermal motor protector is switched off This can be any of the switches from the connected masters / slaves
4) The thermal motor protector has the wrong setting Set to 1.9amp for Prolyft hoist
5) Mains switch is switched of Switch “on”
6) Emergency button is activated Turn button clockwise to release
7) There is to much resistance in one of the connectors Measure the resistance in Ohm’s of the connectors
8) Check the power cable Connect properly / measure
9) Phase failure indicator shows red Change phases, measure power supply
9) Power supply is switched off Switch “on”
10) Control circuit breaker is switched off Switch “on “
11) Mains switch is switched of Switch “on”
12) Emergency button is activated Turn button clockwise to release
13) Environmental temperatures are to high Place the controller in a cooler/warmer surrounding
14) There is to much resistance in one of the connectors Measure the resistance in Ohm’s of the connectors

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 17 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
1-WAY HANDHELD
Motor cable:
5 m. PLA-30-05
10 m. PLA-30-10
20 m. PLA-30-20
Power input
Power cable:
5 m. PLA-32-05
10 m. PLA-32-10
20 m. PLA-32-20

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 18 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
2-WAY HANDHELD
Motor cable:
5 m. PLA-30-05
10 m. PLA-30-10
20 m. PLA-30-20
Power input
PLE-30-020
Power cable:
5 m. PLA-32-05
10 m. PLA-32-10
20 m. PLA-32-20

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 19 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
4-WAY BASIC

©Prolyte Products Group 2009
Prolyte has made every effort to ensure the accuracy of this manual. No liability will be accepted for errors. Prolyte reserves the right to change or alter their products or
manuals without prior notice. No part of this manual may be reproduced in any form or by any means without prior written permission.
Prolyte Products Group – Phone +31 (0)594 85 15 15 Fax: + 31 (0)594 85 15 16 www.prolyte.com
pages 20 of 18
USER MANUAL PLE-30
DIRECT CONTROLLED HOIST
8-WAY BASIC
Multi cable:
5 m. PLA-33-05
10 m. PLA-33-10
20 m. PLA-33-20
Power cable:
5 m. PLA-32-05
10 m. PLA-32-10
20 m. PLA-32-20
BREAK-OUT: PLA-34-02
PLE-30-083
Motor cable:
5 m. PLA-30-05
10 m. PLA-30-10
20 m. PLA-30-20
This manual suits for next models
2
Table of contents
Popular Controllers manuals by other brands

MegaLite
MegaLite DECO Series user manual

HunterDouglas
HunterDouglas POWERVIEW Motorization Guide

TriStar
TriStar TS-MPPT-30 Installation, operation and maintenance manual

KICK ASS
KICK ASS KA1224MPPT20A user manual

Astral Pool
Astral Pool IGNIA LIGHT DMX pro quick start guide

Seaside
Seaside MINI WARDEN Installation & operation