protech PMB-892LF User manual

USER’S
MANUAL
PMB-892LF
Intel
®
Socket H2 LGA1155
Mini-ITX Motherboard
With VGA/So nd/2LAN(1G)/4COM
P
MB
-
8
9
2
LF
M
1

Copyright Notice
PMB-892LF Intel®Socket H2
Mini-ITX Motherboard
With VGA/ Sound/ 2LAN/ 4COM
COPYRIGHT NOTICE
This user’s manual is meant to assist users in installing and setting up the
system. The information contained in this document is subject to change
without any notice.
This manual is copyrighted May 2012. You may not reproduce or transmit in
any form or by any means, electronic, or mechanical, including photocopying
and recording.
ACKNOWLEDGEMENTS
All trademarks and registered trademarks mentioned herein are the property
of their respective owners.
CE NOTICE
This is a class A product. In a domestic environment this product may cause
radio interference in which case the user may be required to take adequate
measures.

Copyright Notice
FCC NOTICE
This equipment has been tested and found to comply with the limits for a Class
A digital device, pursuant to part 15 of the FCC Rules. These limits are
designed to provide reasonable protection against harmful interference when
the equipment is operated in a commercial environment. This equipment
generates, uses, and can radiate radio frequency energy and, if not installed
and used in accordance with the instruction manual, may cause harmful
interference to radio communications. Operation of this equipment in a
residential area is likely to cause harmful interference in which case the user
will be required to correct the interference at his own expense.
You are cautioned that any change or modifications to the equipment not
expressly approve by the party responsible for compliance could void your
authority to operate such equipment.
CAUTION
Danger of explosion if battery is incorrectly replaced.
Replace only with the same or equivalent type recommended by the manufacturer.
Dispose of used batteries according to the manufacturer’s instructions.
Installation only by a trained electrician or only by an electrically trained person who
knows all English Installation and Device Specifications which are to be applied.

Contents
TABLE OF CONTENTS
CHAPTER 1 INTRODUCTION
1-1 About This Manual ...................................................... 1-2
1-2 System Specifications .................................................. 1-3
1-3 Safety Precautions ....................................................... 1-6
CHAPTER 2 SYSTEM CONFIGURATION
2-1 Jumper & Connector Quick Reference Table ...............
2-2
2-2 Component Locations ...................................................
2-3
2-3 How to Set the Jumpers ................................................
2-4
2-4 COM Port Connector ……..…………………………..
2-6
2-5 RS232/422/485(COM2) Selection ................................
2-8
2-6 COM2 Auto Detect Selection ……..…………………. 2-9
2-7 CPU Selection ...............................................................
2-9
2-8 Keyboard & Mouse Connector .....................................
2-10
2-9 Reset Connector ............................................................
2-10
2-10 Hard Disk Drive LED Connector ..................................
2-11
2-11 ATX Power Button …...................................................
2-11
2-12 External Speaker Connector ..........................................
2-11
2-13 PLED Connector ……...................................................
2-12
2-14 Clear CMOS Data Selection …………………………. 2-12
2-15 CPU Fan Connector ………..………………………… 2-13
2-16 System Fan Connector ……………………………….. 2-13
2-17 VGA Connector ……………………………………….
2-14
2-18 Serial ATA Connector ……………………………….. 2-15
2-19 Printer Connector ……………………………………..
2-17
2-20 Universal Serial Bus Connector ………………………
2-18
2-21 USB & LAN Connector ………………………………
2-19
2-22 Display Port Connector ……………………………….
2-21
2-23 Digital Input/Output Connector ……………………… 2-21
2-24 ATX Power Connector ………………………………. 2-22
2-25 Sound Connector …………….………………………..
2-23

Contents
CHAPTER 3 SOFTWARE UTILITIES
3-1 Introduction ................................................................. 3-2
3-2 Intel Chipset Software Installation Utility …..……..... 3-3
3-3 VGA Driver Utility ...................................................... 3-4
3-4 LAN Driver Utility ...................................................... 3-5
3-5 Sound Driver Utility .................................................... 3-6
3-6 Intel
®
ME Driver Utility ................................................
3-7
3-7 USB3.0 Software Installation Utility .............................
3-8
CHAPTER 4 AMI BIOS SETUP
4-1 Introduction ................................................................. 4-2
4-2 Entering Setup ............................................................ 4-4
4-3 Main …….................................................................... 4-6
4-4 Advanced …………………….........................…........ 4-7
4-5 Chipset …………….................................................... 4-30
4-6 Boot ..………………................................................... 4-37
4-7 Security ……………………………………………… 4-40
4-8 Save & Exit ………………………………………….. 4-43
APPENDIX A EXPANSION BUS
Mini-PCIe Bus Pin Assignment ………………………………
A-2
APPENDIX B TECHNICAL SUMMARY
Block Diagram ........................................................................ B-2
Interrupt Map .......................................................................... B-3
DMA Channels Map ……....................................................... B-8
Memory Map ........................................................................... B-9
I/O Map ................................................................................... B-11
Watchdog Timer Configuration …………..…………………. B-15
Flash BIOS Update ………………………………………….. B-17

Page:1-1
INTRODUCTION
This chapter gives you the information for PMB-892LF. It also
outlines the System specification.
Section includes:
About This Manual
System Specifications
Safety Precautions
Experienced users can skip to chapter 2 on page 2-1
for Quick Start.
CHAPTER
1

Chapter 1 Introduction
Page: 1-2 PMB-892LF USER
′
S MANUAL
1-1. ABOUT THIS MANUAL
Thank you for purchasing our Intel
®
3
rd
Gen. Core CPU (Ivy Bridge) Mini-
ITX Motherboard with VGA / Sound / 2LAN / 4COM. PMB-892LF provides
faster processing speed, greater expandability and can handle more task than
before. This manual is designed to assist you how to install and set up the
system. It contains four chapters. The user can apply this manual for
configuration according to the following chapters:
Chapter 1 Introduction
This chapter introduces you to the background of this manual, and the
specifications for this system. The final page of this chapter will indicate
how to avoid damaging this board.
Chapter 2 Hardware Configuration
This chapter outlines the component locations and their functions. In the
end of this chapter, you will learn how to set jumper and how to configure
this card to meet your own needs.
Chapter 3 Software Utilities
This chapter contains helpful information for proper installations of the
VGA utility, LAN utility, and Sound utility.
Chapter 4 AMI BIOS Setup
This chapter indicates you how to set up the BIOS configurations.
Appendix A Expansion Bus
This appendix introduces you the Mini-PCIe expansion bus.
Appendix B Technical Summary
This appendix gives you the information about the Technical maps, Watchdog-
timer configuration, and Flash BIOS Update.

Chapter 1 Introduction
PMB-892LF USER
′
S MANUAL Page: 1-3
1-2. SYSTEM SPECIFICATION
CPU
Intel
®
3
rd
Gen. Core CPU (Ivy Bridge) / Socket H2 (LGA1155)
CHIPSET
Intel
®
Q77 (PCH)
MEMORY
2×240Pins, Dual channel DDR3-1333/1600MHz up to 16GB
BIOS:
AMI BIOS (UEFI), with VGA BIOS
REAL TIME CLOCK:
Build in PCH
DISPLAY:
Build in processor
Supports VGA, 1 x eDisplay port (Protech Display Port definition)
*
Discrete graphic card is necessary for display if the chosen CPU doesn’t have
integrated graphics support
.
SERIAL PORT:
4 ports (COM1/3/4 for RS232, COM2 for RS232/422/485)
PARALLEL PORT:
1 port (Bi-direction, SPP / EPP / ECP)
USB CONNECTOR:
8 ports
(4x USB3.0 with stack connector on Rear Panel,
4x USB2.0 with box-heater on board.)
LAN ADAPTER:
Dual ports, support 10/100/1000Mbps
LAN1: Intel
®
82579V (82579LM)
LAN2: Intel
®
82583V
Support Wake-on-LAN.

Chapter 1 Introduction
Page: 1-4 PMB-892LF USER
′
S MANUAL
SATA INTERFACE:
4 ports of S-ATA connector from PCH
SATA1 & SATA2 -- support SATAIII (6.0Gb/s, with Blue color connector)
SATA3 & SATA4 -- support SATAII (3.0Gb/s)
KEYBOARD/MOUSE:
1 x PS/2 port (KB/MS)
BUS SUPPORT:
1 x PCI-e (16X), 1 x MiniPCI-e
SOUND:
High Definition Audio
Realtek ALC888S
Supports Line-in/Line-out/Mic, audio connector on the rear panel
SPEAKER:
Internal buzzer
DIGITAL I/O:
4 in / 4 out
LED INDICATOR:
1 x HDD LED, 1 x Power LED
HARDWARE MONITORING FUNCTION:
Voltage, CPU Temperature and Cooling fan speed (CPU, System), Smart Fan
support.
WATCHDOG:
1~255 Secs.
RAID FUNCTION:
RAID 0, 1, 5, 10
POWER SUPPLY:
ATX 24 pin

Chapter 1 Introduction
PMB-892LF USER
′
S MANUAL Page: 1-5
TEMPERATURE:
Operation temperature : 0~60°C
Storage temperature :-40~85°C
HUMIDITY:
Operation humidity : 10~90%
Storage temperature : 5~95%
BOARD DIMENSIONS:
170mm x 170mm
BOARD NET WEIGHT:
500 gram
Certificate:
CE/FCC Class A

Chapter 1 Introduction
Page: 1-6 PMB-892LF USER
′
S MANUAL
1-3. SAFETY PRECAUTIONS
Follow the messages below to avoid your systems from damage:
1. Keep your system away from static electricity on all occasions.
2. Prevent electric shock. Don’t touch any components of this card when the card
is power-on. Always disconnect power when the system is not in use.
3. Disconnect power when you change any hardware devices. For instance, when
you connect a jumper or install any cards, a surge of power may damage the
electronic components or the whole system.

Page 2-1
HARDWARE
CONFIGURATION
** QUICK START **
CHAPTER
2
Helpful information describes the jumper & connector settings, and
component locations.
Section includes:
Jumper & Connector Quick Reference Table
Component Locations
Configuration and Jumper settings
Connector’s Pin Assignments

Chapter 2 Hardware Configuration
Page: 2-2 PMB-892LF USER
′
S MANUAL
2-1. JUMPER & CONNECTOR QUICK REFERENCE TABLE
CONNECTOR/JUMPER NAME
COM Port Connector COM1, COM2, COM3, COM4
RS232/422/485 (COM2)
Selection JP8
COM2 Auto Detect Selection JP7
CPU Selection JP9
Keyboard & Mouse Connector
KB_MS1
Reset Connector FP1 (5, 7)
Hard Disk Drive LED
Connector FP1 (1, 3)
ATX Power Button FP1 (9, 11)
External Speaker Connector FP1 (6, 8, 10, 12)
PLED Connector FP1 (2, 4)
Clear CMOS Data Selection JP2
CPU Fan Connector CPU_FAN1
System Fan Connector SYS_FAN1
VGA Connector VGA1
Serial ATA Connector SATA1, SATA2, SATA3, SATA4
Printer Connector LPT1
Universal Serial Bus Connector
USB45, USB89
USB & LAN Connector LAN1_USB1, LAN2_USB1
Display Port Connector JDP1
Digital Input/ Output Connector
DIO1
ATX Power Connector ATX_PWR1, ATX_PWR2
Sound Connector AUDIO1

Chapter 2 Hardware Configuration
PMB-892LF USER
′
S MANUAL Page: 2-3
2-2. COMPONENT LOCATIONS
Battery
17
17
1
7
14
13
26
1
1
3
2
1
4
3
12
1516
1718
5152
1
9
2
10
1
9
2
10
1 2
10
1
1
9 10
1 2
7 8
1 2
109
1 1
1
1
1
2
2
11 12
109
1
4
1
6
9
5
10
15
18
14
20
24
21
16
1
6
11
5
10
15
44
42
3532
25
22
51
2
AUDIO1
LAN2_USB1
19
2 10
11 12 13 14
LAN1_USB1
19
2 10
11 12 13 14
A1
A9
A4
A5
B9
B5
B4 B1
A1
A9
A4
A5
B9
B5
B4 B1
J1
JD09M1 SYS_F
AN1
LPT1 DIO1
SATA1
SATA2
SATA4
17
SATA3
JP4
JP7
JP8
COM2
USB45
USB89
ATX_PWR2
JP9
FP1
SP1
CPU_FAN1
M_PCIE1
JP1
JP2
PCI-E1
KB_MS1
1
JP10 DIMM1
DIMM2
1
2 20
19
JDP1
ATX_PWR1
REMOVE
Intel
LGA1155
Intel
PCH Q77
4
109
12
11
1 13
12 24
PMB-892LF Connector, Jumper and Component locations

Chapter 2 Hardware Configuration
Page: 2-4 PMB-892LF USER
′
S MANUAL
2-3. HOW TO SET THE JUMPERS
You can configure your board by setting jumpers. Jumper is consists of
two or three metal pins with a plastic base mounted on the card, and by
using a small plastic "cap", Also known as the jumper cap (with a metal
contact inside), you are able to connect the pins. So you can set-up your
hardware configuration by "open"or "close"pins.
The jumper can be combined into sets that called jumper blocks. When
the jumpers are all in the block, you have to put them together to set up
the hardware configuration. The figure below shows how this looks like.
JUMPERS AND CAPS
If a jumper has three pins (for examples, labelled PIN1, PIN2, and PIN3),
You can connect PIN1 & PIN2 to create one setting by shorting. You can
either connect PIN2 & PIN3 to create another setting. The same jumper
diagrams are applied all through this manual. The figure below shows
what the manual diagrams look and what they represent.

Chapter 2 Hardware Configuration
PMB-892LF USER
′
S MANUAL Page: 2-5
JUMPER DIAGRAMS
2 pin Jumper
looks like this
Jumper Cap
looks like this
3 pin Jumper
looks like this
Jumper Block
looks like this
JUMPER SETTINGS
Looks like this
3 pin Jumper
2-3 pin close(enabled)
Looks like this
Jumper Block
1-2 pin close(enabled)
2 pin Jumper close(enabled)
1
1
1
2
1 2
1
1
Looks like this

Chapter 2 Hardware Configuration
Page: 2-6 PMB-892LF USER
′
S MANUAL
2-4. COM PORT CONNECTOR
COM1: COM1 Connector
COM1 is fixed as RS-232.
The pin assignments are as follows:
PIN ASSIGNMENT
1 COM1_DCD#
2 COM1_RX
3 COM1_TX
4 COM1_DTR#
5 GND
6 COM1_DSR#
7 COM1_RTS#
8 COM1_CTS#
9 COM1_RI#
COM2: COM2 Connector
The COM2 is selectable as RS-232/422/485.
The pin assignments are as follows:
ASSIGNMENT
PIN RS-232 RS-422 RS-485
1 COM2_DCD# TX- 485-
2 COM2_DSR# X X
3 COM2_RX TX+ 485+
4 COM2_RTS# X X
5 COM2_TX RX+ X
6 COM2_CTS# X- X
7 COM2_DTR# RX- X
8 COM2_ RI# X X
9 GND GND GND
10 NC NC NC
9
1
10
2

Chapter 2 Hardware Configuration
PMB-892LF USER
′
S MANUAL Page: 2-7
COM3: COM3 Connector
COM3 is fixed as RS-232.
The pin assignments are as follows:
PIN ASSIGNMENT
1 COM3_DCD#
2 COM3_RX
3 COM3_TX
4 COM3_DTR#
5 GND
6 COM3_DSR#
7 COM3_RTS#
8 COM3_CTS#
9 COM3_RI#
10 NC
COM4: COM4 Connector
COM4 is fixed as RS-232.
The pin assignments are as follows:
PIN ASSIGNMENT
1 COM4_DCD#
2 COM4_RX
3 COM4_TX
4 COM4_DTR#
5 GND
6 COM4_DSR#
7 COM4_RTS#
8 COM4_CTS#
9 COM4_RI#
10 NC
15
69
COM3
15
69
COM4

Chapter 2 Hardware Configuration
Page: 2-8 PMB-892LF USER
′
S MANUAL
2-5. RS232/422/485 (COM2) SELECTION
JP8: RS232/422/485 (COM2) Selection
This connector is used to set the COM2 function.
The jumper settings are as follows:
COM 2
FUNCTION
JUMPER
SETTINGS
(PIN CLOSED)
JUMPER
ILLUSTRATIONS
RS232 All Open
RS422
1-2
3-4
9-10
RS485
1-2
5-6
7-8
Note: Manufacturing default – RS232

Chapter 2 Hardware Configuration
PMB-892LF USER
′
S MANUAL Page: 2-9
2-6. COM2 AUTO DETECT SELECTION
JP7: COM2 Auto Detect selection
The selections are as follows:
SELECTION JUMPER
SETTINGS JUMPER ILLUSTRATION
NORMAL 1-2
JP7
AUTO GATING
2-3
JP7
Note: Manufacturing Default – Normal
2-7. CPU SELECTION
JP9: CPU selection
The selections are as follows:
SELECTION JUMPER
SETTINGS JUMPER ILLUSTRATION
Ivy Bridge 1-2
JP9
1
Sandy Bridge open
JP9
1
Note: Manufacturing Default – Ivy Bridge
Other manuals for PMB-892LF
1
Table of contents
Other protech Motherboard manuals

protech
protech PC-570 User manual

protech
protech SA-5942 User manual

protech
protech PMB-1751LF M1 User manual

protech
protech PC-580 User manual

protech
protech BM-0962 User manual

protech
protech PMB-562LF User manual

protech
protech BE-U830 Series User manual

protech
protech ProX-1670 User manual

protech
protech ProX-1650 User manual

protech
protech Prox-1655 User manual