QMTECH QMT 7MS028 Series Installation and operation manual

Operating & Maintenance manual
Line pressure regulator
210331:3
Art nr
QMT 7MS028XXX
QMT 7MS035XXX
QMT 7MS042XXX
QMT 7MS054XXX
Phone
+46(0)480 44 02 00
Telefax
+46(0)480 44 00 10
Address
Amerikavägen 6
393 56 KALMAR, Sweden
Website/ e-post
www.qmt3.com

Contents
3
4
4
4
5
5
6
6
7
8
8
General instructions
Line pressure regulator principles
Flow data
Flow chart
Operating instructions:Normal operation
Reference diagram
Operating instructions: Alarm
Operation and Maintenance
Installation
Wiring diagram
Labeling / manufacturing control
Spare parts 8
2
instructions

General instructions
These instructions are for the users to receive information about the line pressure regulator unit
function and design.
Read the instructions with the line pressure regulator in place so that you can quickly and easily find all
the controls.
The line pressure regulator is part of the medical gas pipeline system, and it is therefore subject to the
inspections and controls specified in EN ISO 7396-1 and national standard SIS HB 370.
It may not be put into operation until a safety inspection has been carried out and a commissioning of
medical use has been issued.
Make sure that the instructions are easily accessible, if necessary, more copies can be ordered from
Qmt-tech. If something is unclear, you can also call us at 0480-440200.
Ensure the following
• The medical gases must not come into contact with oil, grease. These substances become
extremely flammable on contact with certain gases and can start explosive fires.
• Hands, tools and equipment must be clean and grease-free.
• In order for Qmt-tech's warranty terms to apply, the cleanliness requirements must be maintained.
• Leak detectors used on gas fittings must be free of substances that can react with oxygen. It must
also not contain ammonium compounds (ammonia) as these can cause cracking in brass details.
• Settings and repairs must be performed by technicians from Qmt-tech ab.
• According to SIS HB 370 and EN ISO 7396-1, alarms must be installed to the line pressure
regulator.
3

Line pressure regulator principle
Qmt-tech's line pressure regulator (pressure stabilizing unit) is intended to regulate the pressure of
medical gases from nominal supply system pressure to nominal distribution pressure. According to the
principle of single fault condition*, the unit contains two mutually independent operating circuits. One is
intended for normal operation and the other as a reserve during, for example, service and inspection.
This means that it is possible to replace regulators and safety valves during operation. Pressure
transducer for outlet (nominal distribution) pressure is standard. Pressure transducer for inlet (nominal
supply system) pressure is option. Optionally contact gauges can be fitted instead of pressure
transducers. The unit is equipped with safety relief valves on the outlet pressure side for each circuit.
These are equipped with a common relief gas pipe. The gas outlets are used as a measuring point.
* Single fault condition: Situation in which a single component, which is to protect against a safety risk
in an equipment, is defective, or when a single external, abnormal circumstance is present.
Flow data
Flow chart
Line pressure regulator with
pressure sensor
P
I
P
I
Valve
Pressure regulator
Safety relief valve
Pressure gauge
Pressure transducer
Gas outlet
P
I
*) Optional
*
4

The inlet valves (3) must normally be open, the handles set in a vertical position. The outlet valve (5)
should normally be open for the circuit in operation, the handle set in a vertical position. You can select
the operating side by opening one outlet valve and closing the other outlet valve. Set the desired alarm
limits on the alarm, see the hospital's and alarm unit's instructions.
Self-venting regulator:
The operating pressure is adjusted by pulling the knob on the pilot regulator outwards and turning it
clockwise to increase or counterclockwise to reduce the pressure. Read the pressure on the pilot
regulator's pressure gauge. Remember to adjust carefully, the pressure drops slowly about 0.5 bar / min.
Check the operating pressure against the outlet pressure gauge. When the adjustment is complete, lock
the adjustment knob by pressing it down again. NOTE! Never turn the regulator adjusting screw (C).
Non-self-venting regulator (reserve gas system only):
Increase the operating pressure by pulling the knob on the pilot regulator
outwards and turning it clockwise. Check against the pilot regulator pressure
gauge and the outlet pressure gauge. Lower the operating pressure by carefully
opening the adjusting screw (C) on the regulator outlet side until a low hissing
sound is heard. Turn the control knob on the pilot regulator counterclockwise to
a lower pressure than operating pressure. Close adjusting screw (C) on the
outlet side of the regulator and then increase to the correct operating pressure
by turning the pilot regulator clockwise. Check against the pilot regulator's
pressure gauge and the outlet pressure gauge that the correct operating
pressure has been reached. If the correct operating pressure is not reached,
repeat the procedure. When the adjustment is complete, lock the adjustment
knob on the pilot controller by pressing it down again. Do not touch the adjusting
screws marked A, B and D.
Line pressure regulator principles
Reference diagram
2
5
6
7
5
83
Inlet
Evacuation
3
9
Outlet
1
1
8
4
4
10
Dimensions (mm)
Dim 28/35 734x773 (BxH)
Dim 42/54 1070x1000 (BxH)
5
1. Safety relief valve
2. Inlet pressure gauge
3. Inlet valve
4. Pilot regulator
5. Outlet valve
6. Pressure transducer
7. Outlet pressure gauge
8. Gas off-take
9. Pressure regulator
10. Connection for relief gas
from safety relief valves

Operating instructions: Alarm
1. Acknowledge the alarm.
2. Check whether the alarm indicates high or low pressure. If the indicated pressure is correct, can
be a malfunction to the alarm system or the pressure has returned to normal operating pressure.
3. If the pressure is not correct: Check if the inlet pressure is correct. Change the operating side.
Fault trace according to local routines.
Operation and Maintenance
The line pressure regulator must be exercised annually and tested for safety. If no abnormal inertia,
leakage or malfunction is detected, the device is approved for another year. In the event of a leak,
replace the O-rings at the connection or valve body, after which a new safety test takes place. Safety
testing takes place in accordance with national standard SIS HB 370.
Note that oil, grease and other contaminants must not come into contact with the product.
Regulators and safety valves can be serviced or replaced without interruption, by isolating the circuit to
be serviced with the shut-off valves. Note that during service during operation, a circuit must always be
kept open.
At annual safety test:
• The safety valves are checked to open at the set pressure. Also test the valve by pulling the relief
device on the side of the valve.
• The pressure gauge must be checked to show the correct pressure.
• O-rings are replaced if necessary.
• The function of the gas outlets must be tested.
After maintenance and service, the system must be leak tested. This is done by pressurizing the
system and then checking that the system is leak tight with the help of leak spray.
Settings, repairs and service must be performed by Qmt-tech technicians or by technicians authorized
by this company.
At product end, the unit is returned to an authorized recycling company.
6
When the alarm sounds, take the following steps:
rises above or decreases below set thresholds.
The pressure transducers sends a signal to the alarm unit which sounds an alarm when the pressure

Installation instructions
Note
• Install the line pressure regulator in such a way that it is protected against mechanical damage. Also note
that electricity must be kept separate from gas pipelines according to current standards, see SIS HB 370.
• The installer must have the required product knowledge and certificatin for shield gas brazing and have
undergone brazing certification in accordance with EN 13585 and EN 13134. Brazing must take place
with shielding gas, without flux and with silver phosphor copper with a minimum of 5% silver content,
article number QMT 7200812.
• The components of the line pressure regulator must not be exposed to temperatures exceeding 100 ° C.
• The installer must ensure that the correct gas and function are achieved through safety testing and that
the system complies with EN 7396-1 and national standard SIS HB 370.
• The system must be inspected for safety before commissioning in accordance with current standards.
Warning
The use of shielding gas in medical gas systems must be carefully planned and separated from the
rest of the system. After brazing and testing is completed, the system is flushed with the medical gas
(= drug) to be contained in the system, to prevent personal injury. See SIS HB 370 and the hospital's
instructions.
The components of the brazing pressure regulator must not be exposed to temperatures exceeding
100 ° C, either during installation or operation. Should this happen or suspect that this has
happened, the components must be replaced and the system cleaned. In the event of fire, the
affected section must be separated and decontaminated immediately before operation. Sealing
plugs, packaging or protective packaging must not be removed until at the time of installation, as
there may be a risk of damaging or contaminating the product.
Mounting:
• Fasten the bottom plate to the wall
with required screws (4 pcs).
• For all gases except Air and AIR for
driving surgical tools, the outlet pipe
from the safety relief valves must be
evacuated to the outside of the
building according to EN 7396-1 and
SIS HB 370.
•
•
•
When brazing the inlet connection (1),
shielding gas can be connected
through connection (1a) or (1b). NOTE!
Remember that valves (4a) and (4b)
must be open.
When brazing the outlet connection
(2), shielding gas can be connected
through gas outlets (2a) or (2b). NOTE!
Remember that valves (5a) and (5b)
must be open.
When brazing the outlet pipe (6) from
the safety valve (3), shielding gas can
be connected through gas outlets (2a)
or (2b). NOTE: Remember that valves
(5a) and (5b) must be open and that at
least one of the relief valves of the
safety valves must be kept open ,for
example with a wedge.
2a
32
2b1b
1
5b
5a
4b
4a
6
7
1a

Wiring diagram
Each pressure transducers and contact gauges is equipped with a 3 m long cable.
Pressure sensor
+
-
+
-
+
-
2
1
9-24 VDC
4-20 mA
P
I
Labeling / Manufacturing control
Each individual is marked with a data plate
containing the serial number, date and the tester's
signature. The marking can be found on the
mounting plate. See picture to the right.
Contact gauge
1 (Brown)
4 (Black)
2 (Blue)
Connect to low alarm
Connect to common conductor
Connect to high alarm
Spare parts
QMT 78500XX
QMT 7611XXX
QMT 7200013
QMT
QMT article number for
Reulators
Valves
Pressure gauges
Transmitter
Gas outlet
Safety relief valves
QMT 716ORGX
QMT 76SÄKXXYY
XX indicates connection diameter
XXX indicates connection diameter
X indicates gas type
XX indicates connection diameter, YY indicates
opening pressure
Address
Amerikavägen 6
393 56 KALMAR, Sweden
Phone
+46(0)480 44 02 00
Telefax
+46(0)480 44 00 10
Website/ e-post
www.qmt3.com
8
QMT 70TRG-A
This manual suits for next models
3
Table of contents
Popular Controllers manuals by other brands

Samsung
Samsung RMC30D1 user manual

CRE Technology
CRE Technology UNIGEN manual

PS Automation
PS Automation PSF301 Short operating instructions

ATTO Technology
ATTO Technology ThunderLink Desklink FC 1082 Getting started guide

Mitsubishi Electric
Mitsubishi Electric MELSEC Q Series user manual

Absima
Absima WP1040-BRUSHED user manual