
EN
INSTALLATION INSTRUCTION
Supplied in the packaging
1x 2x
Introduction
Before working with the NEA wiring centre, this instruction is to be
read completely and thoroughly. This instruction must be kept and
handed over to future users. You can view and download these
instructions and more at www.rehau.uk/neafamily.
Safety
Intended use
Depends on the power supply of the wiring centre, the REHAU NEA
wiring centre serves
- for the installation of a single-room control up to 6 zones for heating
applications.
- for the installation of up to 6 NEA room controllers 230 V or 24 V (do
not mix 230 V and 24 V).
- for the installation of up to 15 REHAU (UNI) actuators 230 V or up to
15 REHAU (UNI) actuators 24 V (do not mix 230 V and 24 V).
- for the connection of an external timer.
-
The REHAU wiring centre only serves for fixed installations.
Safety instructions
All safety notes in this instruction must be observed in order to avoid
accidents with personal damage or property damage.
Serious danger is present due to applied voltage at the wiring
centre!
- Only an authorised person may open the device.
- Always disconnect from the mains and make safe before opening.
- Disconnect external voltages and confirm isolation.
- Only use the product if it is supplied as new.
- Do not operate the device without device cover in place.
- Caution when using this device persons should be knowledgeable,
supervised or instructed concerning the safe use of the device and
understands the resulting risks. This also applies when used or
operated by children from the age of eight (8) years or persons with
reduced physical, sensory or mental abilities or lack of experience.
- Ensure that no children play with the product.
- In case of emergency, disconnect the complete room temperature
control system.
Requirements with regard to personnel
The electrical installations must be performed according to the current
national regulations as well as according to the regulations of your
local energy supplier. It is recommended that persons carrying out
work on this device is suitably qualified to do so. For example:
- Heating and ventilation
- Approved Electrical Installer
- Electronics Engineer
as in accordance to the profession designations ocially announced
in the UK, as well as according to comparable professions within the
European Community Law.
Device overview
Connections and indications
The following instructions show the full equipment. Depending on the
wiring centre type several positions may be omitted.
HZ 1
L/L1
=>
=>
=>
=>
=>
=>
N/L2
CO
L/L1
NC
0min 5min
N/L2
Nachlaufzeit
Shut-down delay
24V => T2A
230V => T4A H
CO
CO
90mm
8..9mm
L/L1
N/L2
CO
L/L1
N/L2
CO
L/L1
N/L2
CO
L/L1
N/L2
CO
L/L1
N/L2
CO
L/L1
N/L2
CO
L/L1
N/L2
CO
L/L1
N/L2
CO
HZ 2 HZ 3 HZ 4 HZ 5 HZ 6 HZ 7 HZ 8 HZ 9
HZ 10
L1‘24V L2‘ L1 L2
NO
10min 15min
2 32 3
2 32 3
AAAA
=>
=>
AB
=>
=>
BBBB
BA
TB
%H
230V N‘ L N
L‘
1 987632
12 11
4
1. Boiler connection
2. Pump connection
3. Protective conductor connection
4. Voltage supply
5. Fuse
6. Temperature limiter or dew point sensor
7. Reduction channel, external timer
8. Heating/cooling change-over
9. Thermostat connection
10. LEDs
11. Strain relief
12. Connection of actuators
13. DIP switch
14. Contacts for casing cover with integrated system clock
Technical data
Operating voltage Wiring centre NEA HT 24V
Wiring centre NEA HT 230V
24V ±20 %, 50 Hz
230V ±10 %, 50 Hz
Power consumption 24 V
230 V
30 VA
50 VA
Fuses 24 V
230 V
T2A
T4AH
Number of heating
zones
6
Max. number of
thermostats
6
Actuators 6 heating zones max. 15 (230V)
max. 15 (24 V)
Nominal load of all
actuators
max. load 24 W
Pump/boiler control Yes
59
13
14
2