PAGE11
ReimersElectraSteam,Inc. 01/10/2022 HLR120‐180Manual‐English REV1
Frequency: Under normal operating
conditions test valve every two (2)
months. Under severe service
conditions or if corrosion and/or
depositsarenoticedwithinthevalve
body, testing must be performed
more often. A test must also be
performed at the end of any non
serviceperiod.
Test the safety relief valve
(preferably near its maximum
pressure setting by holding the test
lever fully open for at least 5
seconds to flush the valve seat free of sediment and
debris.Thenreleaseandpermitthevalvetosnapshut.
Closethewaterinletandoutletstopvalves(FIGURE10)
Turnoffandlockoutallboilerpowersupplies
Ensure that the boiler drain valve (FIGURE 10) is piped
toasafepointofdischarge
Open the boiler drain valve carefully and drain the
pressurevessel.Assoonasthereisnopressurepresent
inthevessel,openthebleedervalve(FIGURE7)slightly
tobreakthevacuum
*WaterInletandOutletStopValvesarenot providedwith
theboiler
Remove the left pressure vessel jacket end cap to
accesstheheatingelements
Labelthewiresofheatingelementsanddisconnectfrom
theterminals
Remove the four (4) nuts from each heating element
flange and pull the elements slowly out of the pressure
vessel
Inspect and if necessary remove with a stiff wire brush
rust,calciumorotherdepositsfromtheelementrods
Inserta flashlightthroughoneheatingelementopening
and inspect through the second opening the inner walls
ofthepressurevessel.Itisnormalthattheinnerwallsof
the vessel be covered by a layer of red, brown or black
layer of rust. However,
rough pressure vessel
surface and layers of rust
peelingoffthesurfaceare
an indication for severe
corrosion. In such case,
contact a water treatment
company.
Installtheheatingelementsbackintotheboilerpressure
vessel,followingtheaboveprocedureinreverseorder.
After installing the pressure vessel jacket end cap, turn
onallpowersuppliesoftheboiler.
FliptheredPOWERswitchoftheboilercontrollertothe
ONposition and leave the operating mode selector
switchinthemiddle(OFFposition)
Observe the LOW WATER alarm light in the boiler
controllerfrontpanel.IfitturnsON,thelowwatercutoff
deviceworksproperly.
Close the boiler drain valve, open the inlet and outlet
valves and with the bleeder valve open, refill the boiler
pressure vessel. Close the bleeder valve as soon as it
dischargeswater.
Press the LOW WATER RESET switch. The LOW
WATERalarmlightshouldturnOFF.
Thehotwaterboilershouldbereadyforoperation.
3.5.1TestingtheElectronicLowWaterCutOffDeviceOnly
Frequency:Anytime.
PressandholdtheLOWWATERCUTOFFTESTswitch
ontheboilercontrollerpanel
After 3 seconds, the HEATING indicator light – if it was
ON – will turn OFF; the LOW WATER alarm indicator
lightwillturnON
PresstheLOWWATERRESETswitchtodeactivatethe
LOWWATERalarm
3.5.2 Testing the Entire Low Water CutOff System
(ElectronicLowwaterCutOffDevice+LowWaterprobe)
Frequency:
90daysafterinstallation,thenonceeveryyear
Flip the boiler operating mode selector
switchtothemiddle(OFFposition)
Close the water inlet and outlet stop
valves(FIGURE10)
Turn off and lock out all boiler power
supplies
Ensure that the boiler drain valve
(FIGURE10)ispipedtoasafepointof
discharge
Open the boiler drain valve carefully
and drain the pressure vessel.As soon
as there is no pressure present in the
vessel, open the bleeder valve
(FIGURE 7) slightly to break the
vacuum.
FliptheredPOWERswitchoftheboilercontrollertothe
ONposition and leave the operating mode selector
switchinthemiddle(OFFposition)
Observe the LOW WATER alarm light in the boiler
controllerfrontpanel.IfitturnsON,thelowwatercutoff
deviceworksproperly.
Close the boiler drain valve, open the inlet and outlet
3.4ElementInspection,Replacement,andElement
Cleaning
WARNING
ElementRods
3.5TestingtheLowWaterCutOffDevice
3.3TestingtheSafetyReliefValve
CAUTION
Beforetesting,makecertainthat
thedischargepipeisproperly
connectedtothevalveoutletand
arrangedtocontainandsafely
disposeofboilerdischarge.
Maintenanceworkmustbe
performedbyexperienced
personnelonly.Ensureboileris
coldanddrainedandhasno
pressureorelectricity.
WaterInlet
StopValve*
WaterOutlet
StopValve*
FIGURE9
FIGURE10
BoilerDrain
Valve*
Selector
Switch
FIGURE12
FIGURE11