manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Reimers
  6. •
  7. Boiler
  8. •
  9. Reimers AR Series User manual

Reimers AR Series User manual

Other manuals for AR Series

1

This manual suits for next models

3

Other Reimers Boiler manuals

Reimers AR Series User manual

Reimers

Reimers AR Series User manual

Reimers JR Series User manual

Reimers

Reimers JR Series User manual

Reimers RE Series User manual

Reimers

Reimers RE Series User manual

Reimers RHPHC-330 User manual

Reimers

Reimers RHPHC-330 User manual

Reimers RB Series Assembly instructions

Reimers

Reimers RB Series Assembly instructions

Reimers RHP-120 User manual

Reimers

Reimers RHP-120 User manual

Reimers HLR15 User manual

Reimers

Reimers HLR15 User manual

Reimers HLR120 User manual

Reimers

Reimers HLR120 User manual

Reimers RB Series User manual

Reimers

Reimers RB Series User manual

Popular Boiler manuals by other brands

IDEAL IMAX XTRA EL 320 user guide

IDEAL

IDEAL IMAX XTRA EL 320 user guide

UTICA BOILERS BC3D Installation, operation & maintenance manual

UTICA BOILERS

UTICA BOILERS BC3D Installation, operation & maintenance manual

Lochinvar SOLUTION 260000 Installation & service manual

Lochinvar

Lochinvar SOLUTION 260000 Installation & service manual

Weil-McLain EG 6 Series manual

Weil-McLain

Weil-McLain EG 6 Series manual

RBI LCD Series Installation & operation manual

RBI

RBI LCD Series Installation & operation manual

Baxi MainEco Combi 28 Installation and service manual

Baxi

Baxi MainEco Combi 28 Installation and service manual

Unical ALKON R 24 Installation and Servicing Manual

Unical

Unical ALKON R 24 Installation and Servicing Manual

Automatic Heating Gasogen Installation and Servicing Manual

Automatic Heating

Automatic Heating Gasogen Installation and Servicing Manual

Viessmann VITORADIAL 300-T Type VR3 Service instructions for contractors

Viessmann

Viessmann VITORADIAL 300-T Type VR3 Service instructions for contractors

Alpha GasSaver GS-1 Installation and servicing instructions

Alpha

Alpha GasSaver GS-1 Installation and servicing instructions

Baxi ROCA LAURA PLUS 28/28 Operating, cleaning and maintenance instructions for the user

Baxi

Baxi ROCA LAURA PLUS 28/28 Operating, cleaning and maintenance instructions for the user

Vaillant uniSTOR VIH SW GB 500 BES operating instructions

Vaillant

Vaillant uniSTOR VIH SW GB 500 BES operating instructions

Kärcher HWE 4000 Gas manual

Kärcher

Kärcher HWE 4000 Gas manual

Radijator BIO max 23.1 instruction manual

Radijator

Radijator BIO max 23.1 instruction manual

Granby BKC Installation, operation and maintenance manual

Granby

Granby BKC Installation, operation and maintenance manual

Brunner BSV 20 Instructions for use

Brunner

Brunner BSV 20 Instructions for use

Potterton 50e Installation and Servicing Manual

Potterton

Potterton 50e Installation and Servicing Manual

UTICA BOILERS TriFire Assembly instructions

UTICA BOILERS

UTICA BOILERS TriFire Assembly instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

PAGE1
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
4407MartinsburgPike Phone:5406623811
ClearBrook,VA22624 Fax:5406658101
USA email:[email protected]
web:www.reimersinc.com
_______
MODEL:
________
SERIAL#:
ARSteamBoilerModels
InstructionsManual
PAGE2
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
LimitedWarrantyInformation........................................4
ImportantSafetyInformation.........................................5
Installation.....................................................................7
Location.........................................................................7
WaterSupply.................................................................8
SteamOutlet.................................................................8
SafetyReliefValve........................................................8
Electrical........................................................................8
BlowdownValve............................................................9
Operation......................................................................10
BoilerStartup................................................................10
ControlFunctions..........................................................10
PressureAdjustment.....................................................10
BoilerMaintenance.......................................................11
BoilerBlowoff................................................................11
SafetyValveTest...........................................................11
ElementReplacementandElementCleaning..............11
WaterLevelProbeandProbeBaffleBoxCleaning......11
GaugeGlassReplacement...........................................12
Troubleshooting............................................................13
PartsLists.....................................................................14
PartsList(Continued)...................................................15
TABLEOFCONTENTS
PAGE3
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
AR4‐8STEAMBOILERS
4407MartinsburgPike Phone:5406623811
ClearBrook,VA22624 Fax:5406658101
USA  email:[email protected]
web:www.reimersinc.com
• Miniatureboilermax.vesselvolume0.29
3
• Maximumsafetyvalveseng100psi
• Allboilersaremanufacturedinaccordancewiththerequirementsofthe
A.S.M.E.BoilerandPressureVesselCodeandA.S.M.E.CSD‐1.Eachboiler
bearstheNaonalBoardStamp“M”.
• Highqualitysaturatedsteam,operangpressurerange0–85psig
• Heavydutycarbonsteelpressurevessel.Vesseljacketandelectrical
enclosure304stainlesssteel
• Largeseleconofoponalequipment
Features
StandardEquipmentofEachBoilerIncludes:
• A.S.M.E.pressurereliefvalve
• One(1)quickopeningboomblowoffvalveasperA.S.M.E.CodeB31.1
• Bronzesteamoutletballvalve
• HighpressurefeedpumponARH‐models
• Lowwatercutoffcontrolwithmanualreset
• One(1)highpressurecutoffcontrolwithmanualreset
• One(1)operangpressurecontrol
• Magneccontactor
• IndicatorlightsforPOWER,REFILLING,HEATINGandALARMS
Applications
•ProcessSteam
•DryCleaning •FoodService(*)
•Laboratories
(*)DIRECTSTEAMAPPLICATIONSTOFOODPRODUCTS:Reimersoffersstainlesssteelboilersor#OPT1030Brass/Bronzefreeboilertrimopon(seePage5).This
alonedoesnotguaranteetheproduconofculinarygradesteam.Applicablesafetystandards(i.e.3‐AT609)mustbeconsidered.
ModelNumberKey
FeedWaterOptions:
Blank=SolenoidValve
H=SolenoidValve+Pump
BoilerPowerinkW
3=3kW
4=4kW
8=8kW SafetyRelief
ValveSetting:
A=15psi(1.03bar)
F=100psi(6.9bars)
Blank=120VACpowersupplyrequired
atboilerinstallationsitefor
hookupasboilercontrolvoltage
X= Boilerisequippedwith
transformertoprovide120VAC
asboilercontrolvoltage.(Applies
to380&415Vvoltagesonly)
Example:ARH8E1F=AR‐Seriesboilerwithfeedwater
solenoidandpump,8kWheangpower,heangpower
supply240V,1ph,controlvoltagepowersupply120V1ph,
safetyvalvesetto100psi.
(1) Each boiler model requires two (2)
powersupplies:Primaryheangpower
andsecondarycontrolvoltage.Nominal
controlvoltageis120V,50/60Hz.Boiler
modelswiththe–Xopon(thisapplies
to foreign voltages only, see Model
Number Key below) require only the
heang power supply of 240V 1PH,
50/60Hz.
(2)TheSTEAMCAPACITYlistedaboveis
basedontheevaporaonratefromand
at 212°F, at 0 psig. If the boiler feed
water temperature is 50°F, then the
STEAMCAPACITYforeachmodellisted
aboveisapproximately15%lower.
Pleasenotethatallinformationprovidedwithinthisbrochureisapproximateandsubjecttochangewithoutnotice.
PleasecontactReimersElectraSteam,Inc.withanyquestionsregardingthespecificationsordimensionsdetailedwithin.
•AirHumidificaon
A R 1
Voltage:
A=120V
E=240V
PAGE4
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
LIMITEDWARRANTY–STEAMGENERATORS
Reimers Electra Steam, Inc. warrants the following products of its own manufacture against defects in
materialsandworkmanshipundernormaluseandservice.Thiswarrantyisinlieuandexcludesallother
expressedorimpliedwarrantiesormerchantabilityoffitnessforanyparticularuse.Nopersonisauthorizedto
extendthetermsofthiswarrantyorassumeanyotherliabilityexceptbywrittenstatementsignedbyanofficer
ofReimersElectraSteam,Inc.ClearBrook,Virginia22624.
WARRANTYPERIOD
The pressure vessel and electrical & mechanical components are warranted for one year from date of
shipmentfromReimersElectraSteam,Inc.inClearBrook,VA22624.
LIMITATIONS
Productsmustbeinstalled,usedandmaintainedinaccordancewithourinstructions,includingreasonable&
necessary maintenance by the user.  Users are responsible for the suitability of the products to their
application.Thereisnowarrantyfordamageresultingfromimproperinstallation,abuse,powerfailure,fire,
flood,lightening,improperwater,misuse,improperspecification,misapplicationorotheroperatingconditions
beyondourcontrolorpartsthatarenormallyexpendableinusualcourseofoperation.
Claimsagainstcarriersfordamageintransitmustbefiledbythebuyer.Reimersliability,ifany,willnot
exceedthepriceofReimersproductsclaimedtobedefective.
ComponentsmanufacturedbyanysupplierotherthanReimersshallbearonlythatwarrantymadebythe
manufacturerofthatproductandserviceforthatwarrantyshallbetheresponsibilityofthatmanufacturerand
notReimers.
REMEDY
ClaimsunderthisLimitedWarrantymustbemadebyobtainingaReturnAuthorizationNumberfromouroffice
(PHONE: 5406623811, FAX: 5406658101) & returning the defective part, freight prepaid to: Reimers
ElectraSteam,Inc.,4407MartinsburgPike,ClearBrook,Virginia22624
Defectiveitemswillberepairedorreplacedasnecessarywithinareasonabletimewithoutcharge,otherthan
incidentalchargessuchasfreightprepayment.Suchrepairorreplacementwithinareasonabletimeisthe
exclusiveremedyavailablefromReimersElectraSteam,Inc.,underthisLimitedWarranty.
CONSEQUENTIALDAMAGES
ReimersElectraSteam,Inc.,isnotliableforlaborcostsincurredintheremoval,reinstallation,orunauthorized
repairofproduct,orfordamagesofanytypewhatsoever,includingincidentaland/orconsequentialdamages.
THISWARRANTYSUPERSEDESALLPREVIOUSWARRANTIES.
PAGE5
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
YouhavejustpurchasedaqualitysteamboilerdesignedtotheASMEBoilerCodeandregisteredwiththeNationalBoard
ofBoilerInspectors.Treatthisindustrialequipmentwithcareandrespect.Itissafewheninstalled,maintained,andused
properly.Readtheinstructioncarefullyandcontactthefactoryifyouhaveanyquestions.
Readthismanualbeforeinstallingandusingthisproduct.
Failuretodosocanresultinseriousinjuryordeath.
YourboilershouldbemarkedwithacompletesetofWARNING/CAUTIONlabelsshownbelow.Ifoneoftheselabelsis
missing,pleasecontactourfactoryimmediately.
USandAllOtherNonFrancophoneCountriesCanadaandAllOtherFrancophoneCountries
Locatedonelectricalenclosuredoor
Locatedonendcapsofcylindricalboilerpressurevesseljacket
Locatedonendcapsofcylindricalboilerpressurevesseljacket
Thismanualcontainssafetymessages.Eachofthesafetymessagesareprecededbyoneofthefollowingsignalword
panels:
Safetymessagesprecededbythislabelcontaininformation,thatifnotfollowedwillresultindeathorseriousinjury.
Safetymessagesprecededbythislabelcontaininformation,thatifnotfollowedcouldresultindeathor
seriousinjury.
Safetymessagesprecededbythislabelcontaininformation,thatifnotfollowedcouldresultinminoror
moderateinjury.
Messagesprecededbythislabelcontainimportantinformation,butarenothazardrelated.
Ensurethatthismanualisavailabletotheboileroperatoratanytime.
Readcarefullyallsafetylabelsattachedtotheboiler.Ifanysafetylabelwasdamagedduringshipment,contactthe
factoryimmediately:
Ph.5406623811;email:sales@reimersinc.com
Readthismanualbeforeinstallingandusingthisproduct.
Failuretodosocanresultinseriousinjuryordeath.
NOTICE
CAUTION
WARNING
DANGER
WARNING
PAGE6
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
ImportantSafetyInformation
1.BLOWDOWNVALVE:Thisvalveisutilizedtoblowimpuritiesfromtheboilerchamber.Whenopened,alargevolume
ofhotwaterandsteamisdischarged.Ensurethatthisvalveisproperlypipedforsuchdischarge.Stateandlocalcodes
mustbemetasapplicable.
2.ELECTRICAL:AllfieldwiringtotheboilermustbeinaccordancewiththeNationalElectricCodeandanylocalcodes
thatmayapply.Wiringmustbemadebyacompetentcertifiedelectrician.Usecopperwireonly.
Ensure that all electrical components are in a dry location, free from any possibility of water soaking. Electric foot
switcheswhensuppliedmustnotbeplacedonawetfloor.Theymustbeplacedondrysurface,notsubjecttosteamor
water.
3.GAUGEGLASS:Thegaugeglassprotectorguardsmustbeonatalltimes.Whenreplacingtheglass,besurethatthe
unitisnotunderpressureandiscooltotouch.Thegaugeglassshouldbereplacedonceperyear.Ifcracksorwearis
evident,replacethegaugeglassimmediately.
4.MODIFICATION/MISUSE:ThisboilerhasbeendesignedandconstructedinaccordancewiththeASMEBoilerand
PressureVesselCode.Anymodificationormisusecanresultinadangeroussituation.ReimersElectraSteam,Inc.is
notliableforanyproductthathasbeenmodifiedorimproperlyused.
5.PRESSUREGAUGE:Thepressuregaugeindicatestheinternalpressureoftheboiler.Itcanfail.Periodicallyhave
yourboilerinspectorcomparethegaugewithaknowngaugeutilizingthetestvalvearrangementprovided
6. REGISTRATION: Most states and cities require boiler registration and inspection. Check with your government
authorities.
7.INSTALLATIONANDREPAIR:
Installationandrepairworkofthisunitmustbeperformedonlybyexperiencedpersonnel.Beforecommencingarepair,
ensurethattheboileriscold,notpressurizedandelectricallydisconnected.Allstandardelectricalandsteamsafety
precautionsmustbetakenduringtesting.
8.SAFETYVALVE:Thesafetyvalveisdesignedtodischargehotsteamwhenthesetpressureisexceeded.Ensure
thatthedischargeportispointingtowardthebackoftheunitawayfromtheoperatororanyaisles.Testthesafetyvalve
periodicallytoensurethatitisoperatingproperly.Testcarefullyatfullpressurebyliftingleverusingpliersandletit
“slapping”shut.Steamdischargecanscald.Ensurenooneisexposed.
9.STEAMINSTALLATION:
Steampipingmustbeofblackpipe,notgalvanized.Workmustbedonebyanexperiencedsteamfitter.Allstateand
localcodesmustbemetasapplicable.
10.WATER:Ensurethatallelectricalcomponentsareinadrylocation,freefromanypossibilityofwatersoaking.
Electricfootswitcheswhensuppliedmustnotbeplacedonawetfloor.Theymustbeplacedondrysurfacenotsubject
tosteamorwater.
WARNING
PAGE7
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
1.Installation
REIMERSELECTRASTEAM,INC.boilersareheatedbyoneormoreimmersiontypeheatingelements.Automatic
controlsareprovidedtomaintainpresetoperatingpressureandproperwatersupply.Safetyfeaturesincludeautomaticlow
watercutoff,automaticpressurecontrol,safetyvalveandvisiblewaterlevelgauge.Eachboilerismanufacturedinaccordance
withtheASME PowerBoiler CodeStandards andis individuallyinspectedand stampedby anauthorized NationalBoard
InsuranceInspector.AllboilersareregisteredwiththeNationalBoardofBoilerandPressureVesselInspectors.Whenboileris
received,makesureithasnotbeendamagedinshipment.
NOTE:
ASMEDATAPLATEISLOCATEDONENDOFPRESSUREVESSELBEHINDLABELSTAMPEDWITHNATIONALBOARD
NUMBEROFUNIT.
Whenboilerisreceived,makesureithasnotbeendamagedinshipment.
Placetheboilerinalevelposition,closetotheequipmentwhichitistosupply.Thiswillinsureminimumheatlossesandallow
moreeconomicalpipingarrangements.Allsteamlinesshouldbeinsulated.Reviewtheoveralldimensionsofyourboilermodel
onpage7toselectproperboilerlocation.
RegardlessoftheNFPA70workingspacerequirementsshownbelow,provideaminimumof3ftclearanceonbothsidesofthe
boilerforelementservicing,3ftofclearancetothefrontoftheboilerand1.5fttotherearoftheboiler.
a.)Workingspace:
ElectricboilerspacingisdictatedbyNFPA70,Table110.26asfollows:
Note:Wheretheconditionsareasfollows:
Condition1—Exposedlivepartsononesideoftheworkingspaceandnoliveorgroundedpartsontheothersideoftheworkingspace,orexposed
livepartsonbothsidesoftheworkingspacethatareeffectivelyguardedbyinsulatingmaterials.
Condition2—Exposedlivepartsononesideoftheworkingspaceandgroundedpartsontheothersideoftheworkingspace.Concrete,brick,ortile
wallsshallbeconsideredasgrounded.
Condition3—Exposedlivepartsonbothsidesoftheworkingspace.
(a)DeadFrontAssemblies.Workingspaceshallnotberequiredinthebackorsidesofassemblies,suchasdeadfrontswitchboardsormotorcontrol
centers,whereallconnectionsandallrenewableoradjustableparts,suchasfusesorswitches,areaccessiblefrom
locationsotherthanthebackorsides.Whererearaccessisrequiredtoworkonnonelectricalpartsonthebackofenclosedequipment,aminimum
horizontalworkingspaceof762mm(30in.)shallbeprovided.
b.)AlcoveorclosetinstallationperUL834:Properlocationofthisboilermodelwithregardtocombustibleandnoncombustiblesurfacesandmaterialsis
codedontheboilernameplate.Thefollowingdecodingsketchanddescriptionisprovidedfortheuserinformation:
Descriptionofdimensionsandsymbols
A–Clearanceabovetopofboiler
B–Clearancefromfrontofboiler
PrefixCtonumeralindicatessuitabilityforclosetoralcoveinstallation
PrefixAindicatessuitabilityforalcovebutnotforclosetinstallation
D–Clearancefrombackofboiler
EL–Clearancefromleftsideofboiler
ER–Clearancefromrightsideofboiler
F–Indicatestypeofflooring:"NC"fornoncombustiblefloor/"C"forcombustiblefloor.Numeralindicatesminimumclearancebelowsuspendedunitsto
combustiblefloor
1.1Location
PAGE8
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
Onmodelswithpumpand/orsolenoidvalve,connect
incomingwatersupplytointakesideofsolenoidvalve.
AR&ARHsteamboilermodelsrequirefour(4)gallonsof
feedwaterperhourforeach10kWofelectricheating
capacityoftheboiler.Linesshouldbeofadequatesizeand
meetlocalplumbingcodes.
Inordertoensurelongtermtroublefreeboileroperation,
werecommendthatthewaterusedasboilerfeedwaterto
betestedforhardness.Ifthewaterinyourareaisharder
than1grain(17mg/L),useawatersoftener.Themain
causeforprematureheatingelementfailureinelectric
steamboilersiswaterhardness.Ifseverecorrosionduring
inspectionofthepressurevesselasindicatedinchapter
3.4ofthismanualbecomesevident,additionaltestsof
yourboilerfeedwatermustbeperformed.Awateranalysis
shouldbeperformedbyaqualifiedandrecognizedwater
treatmentcompanylocatedinyourarea.
Recommendedlevelsforboilerfeedwater:
Recommendedlevelsforboilerwater(waterinside
pressurevesselwhenboilerisoperating)
Allpipingfromandtotheboilermustcomplywiththe
A.S.M.E.B31.1PowerPipingCode.AllStateandlocal
codesmustbemet.Allpipingmustbedonebyaqualified
steamfitter.
Connectsteamlineofsufficientsizefromsteamlinevalve
totheequipment.Steampipingmustbeblacksteelpipe,
notgalvanized.Workmustbedonebyanexperienced
steamfitter.Allstateandlocalcodesmustbemet.
Thesafetyvalveisdesignedtodischargehotsteamwhen
thesetpressureisexceeded.Ensurethatthedischarge
portispointingtowardthebackoftheunitawayfromthe
operatorandanyaisles.Ifitisrequiredthatdischarge
pipingbeinstalledfromthesafetyvalve,thepipeshould
notbesmallerthanthevalveoutletandshouldberigidly
supportedsoasnottoplaceweightonthevalveitself.
Important:Novalveinthisline!
NOTICE Donotaddanychemicalsto
theboilerfeedwaterunless
specificallyrecommendedbya
qualifiedandrecognizedwater
treatmentcompany.
BoilerFeed
WaterSupply
SafetyRelief
Valve
1.2WaterSupply 1.3SteamOutlet
1.5SafetyReliefValve
SteamOutlet
FIGURE03
FIGURE05
FIGURE04
PAGE9
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
Tohookuppowerandcontrolvoltagetotheboiler,please
proceedasfollows.Toensureproperconnection,please
referalsototheattachedwiringdiagramandlabelsnextto
thefieldwiringterminalsforproperconductorsizeand
maximumtorquesthatcanbeappliedtotheterminal
contacts.Allwiringmustbeinstalledinaccordancewiththe
NationalElectricCodeandanylocalcodesthatmayapply.
Wiringmustbedonebyacompetent,certifiedelectrician.
Forthisservice,theN.E.C.requiressupplywiresratedat
125%offullload.Useonlycopperwire.Installafused
disconnectswitchwithinsightoftheboiler.Connectpower
supplytotheterminalsincontrolpanel.
1.6.2240VBoilerModelswithVoltageTransformer
ConnectpowersupplyasindicatedinFIGURE07.Use
AWG#8copperwire,ratedfor75°Cminimum.
1.6.3BoilerModelswithoutPreInstalledPowerCord
andControlVoltageTransformer
ConnectpowersupplyasindicatedinFIGURE08.Use
AWG#8copperwire,ratedfor75°Cminimum.
EnsurethatthevoltagebetweentheconductorsL1andL2
toNEUTRALis120VAC
Ifno240Vpowersourceisavailablethatmeasures120V
ACfromtheconductorsL1andL2toNEUTRAL,then
hookuptwoseparatepowersupplies,seeFIGURE09:
Powerhookup,AWG#8copperconductors,rated
75°Cminimum
Controlvoltagehookup,AWG#14copper
conductors,rated75°Cminimum
1.6.4120VBoilerModelswithoutPreInstalledPower
CordandControlVoltageTransformer
Connectpowersupplyasindicated.UseAWG#10copper
wireratedfor75°Cminimum
Whentheblowdownvalveisutilized,a
largevolumeofhotwaterandsteamis
discharged.Ensurethatthisvalveis
properlypipedforthisdischarge.Stateandlocalcodes
mustbemetasapplicable.
1.6Electrical
1.7BlowdownValve
CAUTION
GND
L2
L1
GND
L2
L1
NEUTRAL
INSTALL#14
AWGCONTROL
VOLTAGEWIRE
JUMPER
GND
L2
L1
NEUTRAL
FIGURE07
FIGURE08
FIGURE09
GND
L
Power
Control
Voltage
GND
L1
NEUTRAL
FIGURE10
Power
BLOWDOWN
VALVE
PAGE10
ReimersElectraSteam,Inc. 03/15/2022 AR812Manual REV2
a.Opensteamlinevalveslightly.Thiswillallowtheboiler
tobefilledwithoutproducingbackpressure.
b.Openupperandlowergaugeglassfixturevalve
c.EnsurethatthefeedwatershutoffvalveisintheOPEN
position
d.Closetheboilerblowdownvalve
e.Throwthefuseddisconnectswitch(notprovidedby
factory)totheONpositionandturnontheboilercontrol
voltage
f.Afterapproximately2seconds,theWATERFEEDlight
turnsonandwaterenterstheboiler.Assoonasthewater
levelreachesapproximatelyhalfheightinthegaugeglass,
theautomaticwaterfeedturnsoff.
g.Iftheboilercontrollerindicatesanyalarms,thenpress
thecorrespondingRESETbutton(s).
Assoonasnoboileralarmsareindicated,theHEATING
lightturnsonandtheboilerstartstobuilduppressure.
Observethepressuregaugewhilepressurebuildsup,until
workingpressureisreached.Theworkingpressureshould
havebeenfactorysettoyourspecification.However,ifyou
wishtochangetheworkingpressuresetting,proceedas
follows.
Allpressurecontrolsarefactorypresetandrequireno
adjustment.However,ifachangeoftheoperatingsteam
pressureisrequired,thenproceedas
follows:
• Disconnectallpowersuppliesfromtheboiler.
• Closethesteamoutletvalve
• Removethelowerfrontcover.
• Turntheblackknoboftheoperatingpressureswitch
clockwisetoincreasethepressureandcounterclockwise
todecreasethepressure.
• Connectallpowersuppliestotheboiler,openthesteam
outletvalve,andinstallthelowerfrontcover.
h.Toshutofftheboiler,turnthePOWERswitchonthe
boilercontrollerOFF.
Standclearofscaldingwaterorsteam.
Disconnect the boiler from all power
supplies.
2.Operation
2.1BoilerStartup
GAUGE
GLASS
VALVES
BLOWDOWN
VALVE FEEDWATER
SHUTOFFVALVE
TurntheBLOWDOWNENABLE
switchOFFifinstalled
TurnthePOWER
switchON
NOTICE
WARNING
HighPressure
SafetyLimit
PressureSwitch.
DONOTADJUST!
Operating
PressureSwitch
OptionalBoiler
BlowoffPressure
Switch.OPT1016
STEAMOUTLET
VALVE
Donotletthepumptorundryforan
extended time as this will cause
damagetothepump.
FIGURE11
FIGURE12
FIGURE13
FIGURE14
2.2PressureAdjustment