manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Reliance Foundry
  6. •
  7. Control System
  8. •
  9. Reliance Foundry Collapsible Bollard User manual

Reliance Foundry Collapsible Bollard User manual

1-877-789-3245 | info@reliance-foundry.com | www.reliance-foundry.com
Collapsible Bollard Installaon Fold-Down
Mounng
Parts List
Installaon Equipment
#PART QTY
1Fold-Down Bollard 1
2Fold-Down Base 1
3Hexagon Socket Buon Head Cap Bolt 3/8" 2
4Hex Nut Nylon Lock 3/8" 2
5Hexagon Socket Buon Head Cap Bolt 1/2" 4
6Stainless Steel Washer 1/2" 4
7Drop-in Concrete Insert 1/2" 4
8Padlock (oponal) 1
5/8" Masonry Drill Bit Hammer
1/2" Insert Seng Tool Hammer Drill or Rotary Hammer
9/16" Wrench Broom/Pressure Washer
5/16" Hex Key Vacuum
7/32" Hex Key Level
Chalk Measuring Tape
To protect the nish, keep bollards in original
packaging unl exact moment of installaon.
Handle with care to avoid scratching or
damaging bollard surfaces.
Once scratched, bollards cannot be repaired
to original form without re-nishing the enre
surface.
Bollards shown in the diagrams may not be the same model as the bollards shipped in this order. This does not aect the integrity of the installaon.
Before Installaon
STEP 1: Always check for hazards such as water pipes,
gas lines, and underground wiring before digging.
STEP 2: Use a broom or pressure washer to clean the
concrete surface prior to bollard installaon.
STEP 3: Study the site plans to locate and mark the
precise center point of each bollard. For secure
installaon, ensure there is a minimum radius* of solid
concrete around each mark.
* Concrete insert manufacturers such as www.ucanfast.com
recommend a radius of 9"
1
2
3
46
5
7
8
1-877-789-3245 | info@reliance-foundry.com | www.reliance-foundry.com
Collapsible Bollard Installaon Fold-Down
Mounng
STEP 4: Place the fold-down base over each center point
marking so that the base’s middle coincides with the
center point.
STEP 5: Use chalk to create drill-markings for each bolt.
For secure installaon, ensure there is a minimum radius*
of solid concrete around each hole for the drop-in insert.
Remove the base. Note: Be sure to make any necessary
adjustments to the orientaon now. Once drilled and
installed, there is no way to reposion the base.
Drill the Holes
STEP 6: Tap a pilot divot hole in the center of each mark.
STEP 7: Set the depth control on the hammer drill (or
rotary hammer) to 2". If depth control is not available,
mark 2" on the masonry bit.
STEP 8: Drill a hole that has a 5/8" diameter and 2" depth.
Drill on high speed, using the hammer funcon if available.
Secure the Fold-Down Base
STEP 9: Clear the hole of all debris and/or standing water
using the vacuum.
STEP 10: Tap the drop-in insert (A) into the hole with the
sloed end facing down, and drive it down unl its top sits
ush with the concrete surface. Insert a seng tool (B)
into the threaded hole, then hammer down. This will cause
the internal expansion plug to set the concrete insert in
place. Note: If a proper seng tool is not available, an
equivalent at-end punch can be used.
STEP 11: Carefully set the fold-down base over the
installaon posion so that the base’s bolt holes are
directly on top of the drilled holes and concrete inserts.
STEP 12: Place the washers over the holes on the fold-
down base and set the bolts into place.

1.00"
3.13"
2"
5/8"
PARTS LIST
DESCRIPTION
PART NUMBER
QTY
ITEM
concrete
11
Drop-in Concrete Insert 3/4" - requires 1" x 3 1/8" hole (dia. x depth)Drop-in Concrete Insert 3/4"
1
2
set_tool_3_4
1
3
hammer_public
1
4
B
A
STEP 9
STEP 8
STEP 10
STEP 12
* Concrete insert manufacturers such as www.ucanfast.com
recommend a radius of 9”
1-877-789-3245 | info@reliance-foundry.com | www.reliance-foundry.com
Collapsible Bollard Installaon Fold-Down
Mounng
Inspect the installaon. Abrasions should be
covered as soon as possible. For damage repair
or other servicing needs, please contact Reliance
Foundry’s sales department.
STEP 13: Use a hex key to ghten the bolts unl secure.
Tighten bolts evenly in a crisscross paern.
STEP 14: Place the bollard in an upright posion and aach
the padlock to the fold-down base.
<model>
STEP 14

Other Reliance Foundry Control System manuals

Reliance Foundry R-7651-EM User manual

Reliance Foundry

Reliance Foundry R-7651-EM User manual

Reliance Foundry R-1009-12 User manual

Reliance Foundry

Reliance Foundry R-1009-12 User manual

Reliance Foundry R-7186 User manual

Reliance Foundry

Reliance Foundry R-7186 User manual

Popular Control System manuals by other brands

Niles VCS50 Specification sheet

Niles

Niles VCS50 Specification sheet

CSP Pacific SENTRY BARRIER Product and installation manual

CSP Pacific

CSP Pacific SENTRY BARRIER Product and installation manual

Sulzer ABS PC 242 user guide

Sulzer

Sulzer ABS PC 242 user guide

Siegenia DRIVE operating instructions

Siegenia

Siegenia DRIVE operating instructions

Sensaphone Sentinel Pro User manual addendum

Sensaphone

Sensaphone Sentinel Pro User manual addendum

Siemens PCS 7 Service manual

Siemens

Siemens PCS 7 Service manual

Soca ST-320 Operation and installation manual

Soca

Soca ST-320 Operation and installation manual

Intermatic MULTIWAVE PE653RC Programming and usage instructions

Intermatic

Intermatic MULTIWAVE PE653RC Programming and usage instructions

Trumpf TruConvert DC 1030 Operator's manual

Trumpf

Trumpf TruConvert DC 1030 Operator's manual

Imesa MCA 1500 manual

Imesa

Imesa MCA 1500 manual

Cooper Wiring Devices TR7740 quick start guide

Cooper Wiring Devices

Cooper Wiring Devices TR7740 quick start guide

Beninca VE.650 Operating instructions and spare parts catalogue

Beninca

Beninca VE.650 Operating instructions and spare parts catalogue

Siemens tiastar MCC installation instructions

Siemens

Siemens tiastar MCC installation instructions

Hurco Autobend 6 installation manual

Hurco

Hurco Autobend 6 installation manual

Pentair Pool Products Pool/Spa Control System CP-100 Installation and owner's manual

Pentair Pool Products

Pentair Pool Products Pool/Spa Control System CP-100 Installation and owner's manual

CorroVenta SuperVision user manual

CorroVenta

CorroVenta SuperVision user manual

Trinity ET Plus 350 Assembly manual

Trinity

Trinity ET Plus 350 Assembly manual

Skov DOL 278AMT-1 Technical manual

Skov

Skov DOL 278AMT-1 Technical manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.