Rinnai Demand Duo CHS199100CUiP User manual

Rinnai Commercial Hybrid System Installaon and Operaon Manual
INSTALLATION AND OPERATION MANUAL
Demand Duo™
Commercial Hybrid Water Heang System
If the informaon in these instrucons is not followed exactly, a re or
explosion may result causing property damage, personal injury, or death.
• Do not store or use gasoline or other ammable vapors and liquids in the vicinity of this or any other
appliance.
• WHAT TO DO IF YOU SMELL GAS
− Do not try to light any appliance.
− Do not touch any electrical switch; do not use any phone in your building.
− Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instrucons.
− If you cannot reach your gas supplier, call the re department.
• Installaon and service must be performed by a qualied installer, service agency or the gas supplier.
WARNING WARNING
Demand Duo™ Model
CHS199100CU

Contents
READ AND SAVE THESE INSTRUCTIONS
1. Welcome .........................................................3
2. Safety ..............................................................4
Safety Symbols ....................................................4
Safety Precauons...............................................5
3. About ..............................................................6
Specicaons.......................................................6
Dimensions and Connecons..............................7
4. Installaon ...........................................................8
Installaon Guidelines.........................................8
Typical Installaon Illustraons ..........................9
Unpack the Demand Duo™ ..............................10
Choose an Installaon Locaon .......................11
Transporng the Demand Duo™.......................13
Earthquake Strapping Instrucons....................13
Installaon Locaon Checklist ..........................14
5. Venng..........................................................15
Venng Guidelines ............................................15
Venng Installaon Sequence...........................16
Terminaon Consideraons..............................16
Select a Vent Type.............................................17
6. System Plumbing ......................................... 35
Pressure Relief Valve Requirements.................35
PRV Temperature Requirements .....................35
Piping Diagram for Basic Installaons...............36
Piping Diagram for Mulple Unit Installaons .37
Connect Water Heater to the Water Supply ....38
Fill the System ..................................................38
Condensate .......................................................39
7. Gas Supply.....................................................41
Connect the Gas Supply ....................................41
8. Power Supply................................................43
9. Post-Installaon Checklist .............................45
10. Maintenance............................................... 46
11. Appendices ..................................................47
Service/Maintenance Log..................................47
Replacement Parts ...........................................48
Warranty ...........................................................49
12. Notes...........................................................51

Rinnai Commercial Hybrid System Installaon and Operaon Manual 3
If You Need Service
Contact your local dealer/distributor or call Rinnai
Customer Care at:
1-800-621-9419
Please have your full serial number or model number
available for product- or service-related issues.
Thank you for purchasing Rinnai’s Demand Duo™
Commercial Hybrid Water Heang System. This manual
provides informaon on the installaon, operaon, and
maintenance of Rinnai’s Demand Duo™ Commercial
Hybrid Water Heang System. Read this manual
completely before installing or operang the system.
This manual is a supplement to the Installaon and
Operaon Manual for Commercial CU199 Condensing
Tankless Water Heaters; refer to the CU199 manual for
complete water heater details, including:
• Parameter Sengs (High Altude Adjustment, Vent
Length Adjustment, and more)
• Temperature Controller Installaon
• Performance Data
• Diagnosc Codes
To The Installer
• A trained and qualied professional must
install the system, inspect it, and leak test it
before use. The warranty will be voided due to
any improper installaon.
• The trained and qualied professional should
have skills such as:
− Gas line sizing
− Connecng gas lines, water lines, valves,
and electricity
− Knowledge of applicable naonal, state,
and local codes
− Installing venng through a wall or roof
− Training in installaon of tankless water
heaters. Training on Rinnai Tankless Water
Heaters is accessible at
www.trainingevents.rinnai.us.
• Read all instrucons in this manual before
installing the system. The system must be
installed according to the exact instrucons in
this manual.
Welcome
1
To The Consumer
• You must read the enre manual to properly
operate the water heater and to have regular
maintenance performed.
• Keep this manual for future reference.
• As when using any appliance generang heat, there
are certain safety precauons you should follow.
See the Safety Precauons secon for detailed
safety precauons.
• Be sure your water heater is installed by a licensed
installer.
• If installing in the state of Massachuses, you must
read the Massachuses State Gas Regulaons
secon in the Installaon and Operaon Manual for
Commercial CU199 Condensing Tankless Water
Heaters (supplied with tankless water heater).
For Your Records
Dealer Name:
Dealer Phone #:
Purchase Date:
Tank Serial #:
System Serial #:
Tank Serial
Number Label
System Serial
Number Label
• Proper installaon is the responsibility of the
installer.
• When installaon is complete, leave this manual
with the system or give the manual directly to the
consumer.

4Rinnai Commercial Hybrid System Installaon and Operaon Manual
Safety
2
• If the informaon in these instrucons is not followed exactly, a re or explosion may result causing property
damage, personal injury, or death.
• Do not store or use gasoline or other ammable vapors and liquids in the vicinity of this or any other appliance.
• WHAT TO DO IF YOU SMELL GAS:
− Do not try to light any appliance.
− Do not touch any electrical switch; do not use any phone in your building.
− Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instrucons.
− If you cannot reach your gas supplier, call the re department.
• Installaon and service must be performed by a qualied installer, service agency or the gas supplier.
• The warning signs in this manual are here to prevent injury to you and others. Please follow them explicitly.
WARNING
Indicates an imminently hazardous
situaon which, if not avoided, will
result in personal injury or death.
Indicates a potenally hazardous
situaon which, if not avoided,
could result in personal injury or
death.
Indicates a potenally hazardous
situaon which, if not avoided,
could result in minor or moder-
ate injury. It may also be used to
alert against unsafe pracces.
Safety alert symbol. Alerts you to potenal
hazards that can kill or hurt you and others.
DANGER CAUTION
WARNING
This manual contains the following important safety symbols. Always read and obey all safety messages.
Safety Symbols

Rinnai Commercial Hybrid System Installaon and Operaon Manual 5
WARNING
• Before operang, smell all around the appliance area
for gas. Be sure to smell next to the oor because
some gas is heavier than air and will sele on the
oor.
• Keep the area around the appliance clear and free
from combusble materials, gasoline, and other
ammable vapors and liquids.
• Combusble construcon refers to adjacent walls and
ceiling and should not be confused with combusble
or ammable products and materials. Combusble
and/or ammable products and materials should
never be stored in the vicinity of this or any gas
appliance.
• Always check the water temperature before entering
a shower or bath.
• To protect yourself from harm, before performing
maintenance:
− Turn o the electrical power supply by unplugging
the power cord or by turning o the electricity at
the circuit breaker. (The temperature controller
does not control the electrical power.)
− Turn o the gas at the manual gas control valve.
− Turn o the incoming water supply.
− Use only your hand to turn the manual gas control
valve. Never use tools. If the manual gas control
valve will not turn by hand, do not try to repair it;
call a trained and qualied professional. Force or
aempted repair may result in a re or explosion.
• Do not use this appliance if any part has been under
water. Immediately call a licensed professional to
inspect the appliance and to replace any part of the
control system and any manual gas control valve
which has been under water.
• Do not use substute materials. Use only parts
cered for the appliance.
• Should overheang occur or the gas supply fail to
shut o, turn o the manual gas control valve to the
appliance.
• Only trained and qualied professionals are
permied to adjust parameter sengs.
• Do not use an extension cord or adapter plug with
this appliance.
• Any alteraon to the appliance or its controls can be
dangerous and will void the warranty.
• Proper venng is required for the safe operaon of
this appliance.
• Flammable liquids such as cleaning solvents, aerosols,
paint thinners, adhesives, gasoline and propane must
be handled and stored with extreme care. These
ammable liquids emit ammable vapors and when
exposed to an ignion source can result in a re
hazard or explosion. Flammable liquids should not be
used or stored in the vicinity of this or any other gas
appliance.
• DO NOT operate the water heater without the front
panel installed. The front panel should only be
removed for service/maintenance or replacing internal
components.
• BURN HAZARD. Hot exhaust and vent may cause
serious burns. Keep away from the water heater. Keep
small children and animals away from the water
heater.
• Hot water outlet pipes leaving the water heater can be
hot to touch.
• Do not store or use gasoline or other ammable
vapors and liquids in the vicinity of this or any other
appliance.
• Install the vent system per local and naonal codes.
• Do not install this water heater above 10,200
(3,109 m).
• Do not obstruct combuson air to the water heater.
• Failure to properly vent this appliance can result in
death, personal injury and/or property damage.
• Rinnai recommends that every home have a carbon
monoxide (CO) alarm in the hallway near bedrooms in
each sleeping area. Check baeries monthly and
replace them annually.
• California law requires the following Proposion 65
warning to be provided:
For proper installaon, operaon and safety, it is important to follow the instrucons and adhere to the safety
precauons shown throughout this manual. The following precauons apply to the installer and consumer.
WARNING
DO NOT adjust the internal gas valve. The design is such that adjustment is not
required. Warranty will be voided if the internal gas valve is adjusted.
This product can expose you to chemicals including
lead, lead compounds and carbon disulde which
are known to the State of California to cause cancer,
birth defects or other reproducve harm. For more
informaon, visit www.P65Warnings.ca.gov.
Safety Precauons

6Rinnai Commercial Hybrid System Installaon and Operaon Manual
Model CHS199100CU
Appliance Type Commercial Hybrid Water Heang System Consisng of Condensing Tankless
Water Heater, Insulated Storage Tank, Pump and Controller
Installaon Type Internal (Indoor) Commercial Applicaons
Category Category IV
Ignion System Direct Electronic Ignion
Product Weight 431 lb (195 kg)
Gas Consumpon Btu/hr (kW/h) Minimum: 15,000 (4.3) Maximum: 199,000 (58.3)
Water Supply Pressure 150 PSI (Maximum)
Temperature Seng 98° F (37° C) to 185° F (85° C)
Tank Volume 119 Gallons (450 Liters)
First Hour Delivery* 317 Gallons (1,200 Liters)
Sound Level 49 dB
Electrical Data
Normal 265 W
Standby 44 W
Freeze Protecon 148 W
Max Current 5.5 A
Fuse Tankless Water Heater Engine: 10 Amps, Controller: 10 Amps
Gas Supply Pressure** Natural 3.5 - 10.5 in. w.c.
Propane 8.0 - 13.5 in. w.c.
By-Pass Flow Control Electronic
Connecons Gas Supply Inlet: 3/4 in. MNPT Hot Water Outlet: 1-1/2 in. MNPT
Cold Water Inlet: 1-1/2 in. MNPT
Electric Connecons Appliance: AC 120 Volts, 60Hz.
Integrated Temperature Controller: DC 12 Volts (Digital)
Water Temperature Control Simulaon Feed Forward and Feedback
Commercial ENERGY STAR® Cered (CU199i) Yes
Complies with South Coast Air Quality
Management District 14 ng/J or 20 ppm NOx
Emission Levels (CU199i) Yes
Product
Number
Gas
Type
Input Thermal
Eciency
U.S. Gallon / HR Liters / HR at Temperature Rise Indicated
Tank
Capacity
°F 30°F 40°F 50°F 60°F 70°F 80°F 90° 100°F 110°F 120°F 130°F 140°F
BTU/HR kW °C 17°C 22°C 28°C 33°C 39°C 44°C 50°C 56°C 61°C 67°C 72°C 78°C
CHS199100CU NG/
LP 199,000 58 97%
119 U.S.
Gals. GPH 780 585 468 390 334 292 260 234 213 195 180 167
450
Liters LPH 2,953 2,214 1771 1476 1264 1105 984 886 806 738 681 632
Recovery Capabilies
Specicaons
* First Hour Delivery Rang is a theorecal calculaon based on 70% usable tank capacity (Tank Capacity x .70 + (recovery) = First Hour Rang
** The maximum gas supply pressure must not exceed the value specied by the manufacturer.
Rinnai products are connually being updated and improved; therefore, specicaons are subject to change without prior noce.
About
3

Rinnai Commercial Hybrid System Installaon and Operaon Manual 7
Dimensions and Connecons
RIGHT
TOP FRONT
LEFT
Measurements in inches (in.)

8Rinnai Commercial Hybrid System Installaon and Operaon Manual
Installation
4
THIS SECTION IS INTENDED FOR THE INSTALLER
Installer qualicaons: A trained and qualied professional must install the appliance, inspect it, and leak test the
Demand Duo™ before use. The warranty will be voided due to any improper installaon. The trained and qualied
professional should have skills such as: Gas sizing; Connecng gas lines, water lines, valves, and electricity; Knowledge
of applicable naonal, state, and local codes; Installing venng through a wall or roof; and training in installaon of
tankless water heaters. Training for Rinnai Tankless Water Heaters is accessible online at www.trainingevents.rinnai.us.
• This water heater is suitable for combinaon water
heang and space heang and not suitable for space
heang applicaons only.
• The installaon must conform with local codes or, in
the absence of local codes, with the Naonal Fuel
Gas Code, ANSI Z223.1/NFPA 54, or the Natural Gas
and Propane Installaon Code, CSA B149.1.
• The appliance, when installed, must be electrically
grounded in accordance with local codes or, in the
absence of local codes, with the Naonal Electrical
Code, ANSI/NFPA 70, or the Canadian Electrical Code,
CSA C22.1.
• The appliance and its main gas valve must be
disconnected from the gas supply piping system
during any pressure tesng of that system at test
pressures in excess of 1/2 psi (3.5 kPa) (13.84 in
W.C.). For system tesng at pressures less than or
equal to 1/2 psi (3.5 kPa) (13.84 in W.C.) the
appliance must be isolated from the gas supply
piping by closing its individual manual shuto valve.
• You must follow the installaon instrucons and
those in the venng secon for adequate
combuson air and exhaust.
• If a water heater is installed in a closed water supply
system, such as one having a backow preventer in
the cold water supply line, means shall be provided
to control thermal expansion. Contact the water
supplier or local plumbing inspector on how to
control thermal expansion.
• Should overheang occur or the gas supply fail to
shut o, turn o the manual gas control valve to the
appliance.
• Combuson air must be free of chemicals, such as
chlorine or bleach, that produce fumes. These fumes
can damage components and reduce the life of your
appliance.
When installing the Demand Duo™, follow these guidelines:
DO NOT install the Demand Duo™ Commercial
Hybrid Water Heang System outdoors.
DO NOT install the water heater in an area
where water leakage of the unit or connecons
will result in damage to the area adjacent to the
appliance or to lower oors of the structure.
When such locaons cannot be avoided, it is
required that a suitable drain pan, adequately
drained, be installed under the water heater.
The pan must not restrict combuson air ow.
DO NOT install the water heater in an area with
negave air pressure.
DO NOT obstruct the ow of combuson and
venlaon air.
DO NOT use this appliance in an applicaon
such as a pool or spa heater that uses
chemically treated water. This appliance is
suitable for lling large or whirlpool spa tubs
with potable water.
DO NOT use substute parts that are not
authorized for this appliance.
DO NOT
Installaon Guidelines

Rinnai Commercial Hybrid System Installaon and Operaon Manual 9
AHot Water Outlet *
BHot Water Outlet Valve *
CCold and Hot Unions *
DTemperature-Pressure Relief
Valve
EOperaon Unit / Temperature
Control
FTemperature-Pressure Relief
Valve Discharge Pipe
(do not cap, plug, or reduce )
*
GPressure Relief Valve Discharge
Pipe (do not cap, plug, or reduce ) *
HCondensate Discharge Pipe (Must
include air gap ) *
IDrain Pan *
JVent pipe (PVC Room Air shown
for illustraon purposes, see
venng secon for other opons)
*
KGas Control Valve *
LGas Union *
MDrip Leg (Sediment Trap) *
NCold Water Supply Valve *
OCold Water Supply *
PThermal Expansion Tank *
QNon-Tempered Supply Line *
RThermostac Mixing Valve *
SNon-Tempered Return Line *
* Field Supplied
Mixing Valve Installaon
Cold Water
Supply
Hot
Water
COLD
WATER
SUPPLY
ABC
D
O
N
P
J
E
I
FM
L
K
R
Q
S
GHD
HOT WATER
OUTLET
Typical Installaon Illustraons

10 Rinnai Commercial Hybrid System Installaon and Operaon Manual
Carefully unpack your system package and verify the
following contents are included.
If any items are damaged or missing, contact your local
dealer/distributor or call Rinnai Customer Care at
1-800-621-9419. Do not aempt to use any item that
appears damaged.
Items included with system:
• Rinnai Demand Duo™ Commercial Hybrid
Water Heang System
• Temperature and Pressure Relief Valve (Tank)
• Pressure Relief Valve (pre-installed on the
tankless water heater)
• Installaon and Operaon Manual (this manual)
• 2 in. PVC Vent Screens (x2) and Vent Screen
Screws
To avoid danger of suocaon, keep plasc bags
away from babies, small children and pets. Do not
use these bags in cribs, beds, carriages, or playpens.
The bags are not a toy.
WARNING
Gather the recommended tools and parts before
starng installaon.
Items Needed (Not Included)
• Pipe wrenches (x2)
• Phillips Head screwdriver
• Adjustable pliers
• Wire cuers
• Gloves
• Safety glasses
• Level
• Soap or gas leak detector soluon
• Approved venng
• Teon tape (recommended) or pipe
compound
• Pipe insulaon
Other Items You May Need
• Hammer drill with concrete bits
• Saw
• Threading machine with heads and oiler
• Core drill with diamond head
• Torch set
• Copper tubing cuer
• Steel pipe cuer
• Heat tape
• 5/8 in. ID PVC exible tubing
• Electrical wire
• Concrete wall anchors
• Oponal pipe cover
• PVC glue/cement and primer
• 2 conductor 22 AWG wire for controller
• Single gang electrical box
• Wire nuts
• Unions and drain valves
• Drain pan
• Earthquake strap
Items Included What You’ll Need
Unpack the Demand Duo™

Rinnai Commercial Hybrid System Installaon and Operaon Manual 11
Contaminant Maximum Level
Total Hardness Up to 200 mg/L
Aluminum * Up to 0.2 mg/L
Chlorides * Up to 250 mg/LL
Copper * Up to 1.0 mg/L
Dissolved Carbon Dioxide (CO2) Up to 15.0 mg/L
Iron * Up to 0.3 mg/L
Manganese * Up to 0.05 mg/L
pH * 6.5 to 8.5
TDS (Total Dissolved Solids) * Up to 500 mg/L
Zinc * Up to 5 mg/L
When selecng an installaon locaon, you must ensure that clearances will be met and that the vent length will be
within required limits. Consider the installaon environment, water quality, and need for freeze protecon.
Requirements for the gas line, water lines, electrical connecon, and condensate disposal can be found in their
respecve installaon secons in this manual.
Environment
* Source: Part 143 Naonal Secondary Drinking Water Regulaons
This secon provides informaon on the importance of water quality to the Rinnai Tankless Water Heater. The
informaon is intended to serve as general guidelines only and is not a complete list of water quality guidelines.
Air surrounding the water heater, venng, and vent terminaon(s) is used for combuson and must be free of any
compounds that cause corrosion of internal components. These include corrosive compounds that are found in aerosol
sprays, detergents, bleaches, cleaning solvents, oil based paints/varnishes, and refrigerants. The air in beauty shops,
dry cleaning stores, photo processing labs, and storage areas for pool supplies oen contains these compounds.
Therefore, it is recommended that external (outdoor) models be used for these locaons where possible. In
applicaons ulizing room air where there are high levels of parculates, Rinnai oers a room air screen.
The water heater, venng, and vent terminaon(s) should not be installed in any areas where the air may contain
these corrosive compounds.
If you install this water heater in an area that is known to have hard water or that causes scale build-up, the water
must be treated and may require a more frequent ushing schedule.
This water heater includes a service indicator (Service Soon, SS). When selected in the parameter sengs, an SS code
will display on the controller indicang that it is me to ush and service the water heater. Scale build-up is caused by
hard water and can be accelerated if the water heater is set at a high temperature.
Rinnai oers Southeastern Filtraon’s “ScaleCuer Water Condioning System” that oers superior lime scale
prevenon and corrosion control by feeding a blend of control compounds into the cold water supply.
Choose an Installaon Locaon
Water Quality Guidelines
Consideraon of care for your water heater should include evaluaon of water quality. The water must be potable,
free of corrosive chemicals, sand, dirt, or other contaminants. It is up to the installer to ensure the water does not
contain corrosive chemicals or elements that can aect or damage the Rinnai Tankless Water Heater. Water that
contains chemicals exceeding the levels below can damage the Rinnai Tankless Water Heater. Replacement of
components due to water quality damage is not covered by the warranty.

12 Rinnai Commercial Hybrid System Installaon and Operaon Manual
CLEARANCES
Locaon Clearance
Top 2 in. (51 mm)
(0 in. from vent components)
** Clearance for servicing the anode rods is 54 in. from the top of
the water heater
Boom (Ground) 0 in.
Front 6 in. (152 mm)
* Clearance for servicing is 24 in. (610 mm) in front of water heater
Back 0 in.
Sides (Le and Right) 0 in.
Door
0 in. Minimum 0 in. Minimum
0 in. Minimum ** 12 in. Minimum
*6 in. Minimum

Rinnai Commercial Hybrid System Installaon and Operaon Manual 13
• Choose the right hand truck to support the weight
and size of the water heater. Refer to the
Specicaons secon in this manual for specic
weights and dimensions.
• Use proper liing techniques to load the water
heater onto the hand truck:
− Posion the water heater onto the hand truck
so the weight is evenly balanced and the tank is
touching the rails of the hand truck.
− Secure the water heater to the hand truck:
→ Posion STRAP A around the tankless unit
as illustrated below.
→ Posion STRAP B around the base of the
tank below the lower enclosure.
Earthquake Strapping
Instrucons
1. Loosen the screws along the perimeter of the plasc
enclosures.
2. Remove the plasc enclosures.
3. Posion straps around the tank per the requirements
of California Oce of the State Architect. DO NOT
POSITION THE STRAPS OVER PIPE, FITTINGS or
WIRE.
4. Replace the plasc enclosures. Modicaon of the
plasc enclosures may be necessary to t the
enclosures over the earthquake straps.
5. Replace the screws around the perimeter of the
plasc enclosures.
Transporng the
Demand Duo™
Lower
Enclosure
Strap A
Strap B
Products installed in the state of California must be
braced, anchored, or otherwise secured to avoid
moon or falling during an earthquake. Contact the
California Oce of the State Architect located at 1102
Q Street, Suite 5100, Sacramento, CA 95811 for
instrucons.
NOTICE
STRAP
Plasc
Enclosure
(Side)
Plasc
Enclosure
(Boom)
STRAP

14 Rinnai Commercial Hybrid System Installaon and Operaon Manual
□ The water heater is not exposed to corrosive compounds in the air.
□ The water heater locaon complies with the required clearances.
□ The planned combuson air and exhaust terminaon locaons meet the required clearances.
□ The water supply does not contain chemicals or exceed total hardness that will damage the heat exchanger.
□ A standard 3 prong 120 VAC, 60 Hz properly grounded wall outlet or other 120 VAC, 60 Hz source is available.
□ The installaon must conform with local codes or, in the absence of local codes, with the Naonal Fuel Gas
Code, ANSI Z223.1/NFPA 54, or the Natural Gas and Propane Installaon Code, CSA B149.1.
Use this checklist to ensure you have selected the correct locaon for the water heater.
Installaon Locaon Checklist

Rinnai Commercial Hybrid System Installaon and Operaon Manual 15
Venting
5
Venng Guidelines
• When installed as direct vent, the vent system
cered and listed with the appliance. You must use
vent components that are cered and listed with
the water heater model.
• Avoid dips or sags in horizontal vent runs by
installing supports per the vent manufacturer’s
instrucons.
• Support horizontal vent runs every four feet and all
vercal vent runs every six feet or in accordance
with local codes.
• Venng should be as direct as possible with a
minimum number of pipe ngs.
• Engineered vent systems must be rmly pressed
together so that the gaskets form an air ght seal.
• The vent piece connected to the water heater must
be secured with one self-tapping screw.
• If the vent system is to be enclosed, it is suggested
that the design of the enclosure shall permit
inspecon of the vent system. The design of such
enclosure shall be deemed acceptable by the
installer or the local inspector.
• Refer to the instrucons of the vent system
manufacturer for component assembly instrucons.
WARNING
DO NOT use cellular core PVC/CPVC.
DO NOT use Radel, ABS, or galvanized material to
vent this appliance.
DO NOT cover non-metallic vent pipe and ngs
with thermal insulaon.
DO NOT combine vent components from
dierent manufacturers.
DO NOT reduce the vent diameter.
DO NOT connect the venng system with an
exisng vent or chimney.
DO NOT common vent with the vent pipe of any
other manufacturer’s water heater or appliance.
If it becomes necessary to
access an enclosed vent
system for service or repairs, Rinnai is not responsible
for any costs or dicules in accessing the vent
system. The warranty does not cover obtaining access
to a vent system in an enclosed environment.
NOTICE
For venng informaon not specied in this secon, refer to the Installaon and Operaon Manual for Commercial
CU199 Condensing Tankless Water Heaters (supplied with each tankless water heater). This manual includes complete
venng informaon, including approved vent manufacturers and terminaons.
NOTICE

16 Rinnai Commercial Hybrid System Installaon and Operaon Manual
1. Install the water heater.
2. Determine the terminaon method—horizontal or vercal, concentric, or twin pipes, etc.
3. Determine proper locaon for wall or roof penetraon for each terminaon.
4. Install terminaon assembly as described in this manual or in the vent manufacturer’s installaon instrucons.
5. Install air and vent piping from water heater to terminaon.
6. Slope horizontal exhaust run towards the water heater 1/4 in per foot. DO NOT slope combuson air pipe
towards water heater.
7. Install vent supports and brackets allowing for movement from expansion, or as per vent manufacturer’s
instrucons or local code requirements.
8. Install vent screen (supplied with water heater) on PVC combuson air and exhaust terminaon elbows as
illustrated below.
• Press vent screen inside of terminaon piece/elbow.
• Secure vent screen to the elbow with screw provided.
Check to determine whether local codes supersede the
following clearances:
• Avoid terminaon locaons near a dryer vent.
• Avoid terminaon locaons near commercial
cooking exhaust.
• Avoid terminaon locaons near any air inlets.
• You must install a vent terminaon at least 12 in
above the ground or ancipated snow level.
The vent for this appliance shall not terminate:
• Over public walkways.
• Near sot vents or crawl space vents or other area
where condensate or vapor could create a nuisance
or hazard or cause property damage.
• Where condensate or vapor could cause damage or
could be detrimental to the operaon of regulators
pressure relief valves, or other equipment.
Listed below are important consideraons for locang
vent terminaon under a sot (venlated or unvenlated
or eave vent; or to a deck or porch):
• Do not install vent terminaon under a sot vent
such that exhaust can enter the sot vent.
• Install vent terminaon such that exhaust and rising
moisture will not collect under eaves. Discoloraon
to the exterior of the building could occur if installed
too close.
• Do not install the vent terminaon too close under
the sot where it could present recirculaon of
exhaust gases back into the combuson air part of
the terminaon.
Venng Installaon Sequence
Terminaon Consideraons

Rinnai Commercial Hybrid System Installaon and Operaon Manual 17
Three types of venng opons are available:
Concentric Pipe
Combuson air and exhaust vent directly through
a single concentric connecon. Hot exhaust exits
through the interior tube, while combuson air
Exhaust
Exhaust
Combuson
air
Combuson
air Combuson
air
Combuson
air
Exhaust
Direct Vent Non-Direct (Room Air) Vent
Mulple water heaters sharing a combuson air
header and a separate exhaust header that vents
directly through separate penetraons to the outside.
Combuson Air
Exhaust Exhaust
Room Air
For Combuson
Twin Pipe
Combuson air and exhaust vent directly
Room air is used for combuson while exhaust
vents to the outside.
Mulple water heaters using room air for
combuson while sharing an exhaust header that
vents directly to the outside.
Direct Vent (Concentric Pipe and Twin Pipe)
1
Non-Direct Vent (Room Air)
2
Common Vent (Indoor Units Only. Direct Vent and Non-Direct/Room Air Vent)
3
Select a Vent Type

18 Rinnai Commercial Hybrid System Installaon and Operaon Manual
Canadian Installaons
(CSA B149.1) U.S. Installaons
(ANSI Z223.1 /NFPA 54)
Ref Descripon Direct Vent (Indoor Unit) Direct Vent (Indoor Unit)
AClearance above grade, veranda, porch, deck, or balcony 12 in. (30 cm) 12 in. (30 cm)
BClearance to window or door that may be opened 36 in. (91 cm) 12 in. (30 cm)
CClearance to permanently closed window **
DVercal clearance to venlated sot, located above the terminal within a
horizontal distance of 2 (61 cm) from the center line of the terminal **
EClearance to unvenlated sot **
FClearance to outside corner **
GClearance to inside corner **
HClearance to each side of center line extended above meter/regulator
assembly **
IClearance to service regulator vent outlet
Above a regulator within 3
(91 cm) horizontally of the vercal
center line of the regulator vent
outlet to a maximum vercal
distance of 15 (4 m)
*
JClearance to non-mechanical air supply inlet to building or the
combuson air inlet to any other appliance 36 in. (91 cm) 12 in. (30 cm)
KClearance to a mechanical air supply inlet 6 (1.83 m) 3 (91 cm) above if within
10 (3 m) horizontally
LClearance above paved sidewalk or paved driveway located on public
property 7 (2.13 m) [1] *
MClearance under veranda, porch, deck, or balcony 12 in. (30 cm) [2] *
Direct Vent Terminaon Clearances (For Concentric and Twin Pipe)
Direct Vent (Concentric Pipe and Twin Pipe)
1
AIR SUPPLY INLET
VENT TERMINAL
AREA WHERE TERMINAL
IS NOT PERMITTTED
X
V
SNOW
TERMINATION
Clearance in
Ref. A also
applies to
anticipated
snow line
Clearance to opposite wall is 24 in. (60 cm).
[1] A vent shall not terminate directly above a sidewalk or paved driveway that
is located between two single family dwellings and serves both dwellings.
[2] Permied only if veranda, porch, deck, or balcony is fully open on a mini-
mum of two sides beneath the oor.
Clearances are in accordance with local installaon codes and the
requirements of the gas supplier. (Dégagement conforme aux codes
d’installaon locaux et aux exigences du foumisseur de gaz.)

Rinnai Commercial Hybrid System Installaon and Operaon Manual 19
All terminaons (horizontal and/or vercal) must terminate 12 in. (0.30 m) above grade or ancipated snow level.
12 in. (0.30 m)
Between terminals at same level
60 in. (1.52 m)
Between terminals at dierent levels
Note: 24 in. (0.61 m)
to wall or parapet
Combuson air and exhaust vent directly through a single
concentric connecon. Hot exhaust exits through the interior
tube, while combuson air enters through the outer layer.
Combuson
air
Exhaust
Concentric Pipe Terminaon Clearances
Direct Vent (Concentric Pipe)
1
Concentric Pipe Overview
Combuson
air
Inside
Corner
12 in.
(0.30 m)
12 in.
(0.30 m)
60 in. (1.52 m) vercally
between terminals

20 Rinnai Commercial Hybrid System Installaon and Operaon Manual
Remove and discard screw from
concentric ue connecon.
Remove exhaust adapter ring (discard for
concentric venng conguraons).
Concentric
Install the concentric vent. Ensure it
is properly seated.
Secure the vent pipe to the concentric ue
connecon with the supplied screw.
Concentric Pipe Installaon Instrucons
Important: Install the venng terminaon according to the diagrams and instrucons in
this manual. Slope the venting 1/4 in. per foot toward the appliance according to the vent
manufacturer’s installation instructions. Dispose of condensate per local codes.
Direct Vent (Concentric Pipe)
1
2
3
1
4
Concentric Vent Maximum Equivalent Length
Vent Sizes 2 in. X 4 in. 3 in. X 5 in.
Vent Lengths 65 (20 m) 150 (46 m)
• 45° elbow is equivalent to 3 (1 m)
• 90° elbow is equivalent to 6 (2 m)
Concentric Pipe Example Vent Applicaons
Horizontal Wall Terminaons
2 in. x 4 in.
3 in. x 5 in.
Vercal Roof
Terminaons
2 in. x 4 in.
and
3 in. x 5 in.
Concentric Pipe Maximum Vent Length
This manual suits for next models
2
Table of contents
Other Rinnai Heating System manuals
Popular Heating System manuals by other brands

Roberts Gorden
Roberts Gorden CoRayVac CRV-B-12 Installation & operation

Sabiana
Sabiana Carisma Floor CRP-ECM installation instructions

Vents
Vents VUT2 250 P EC User's operation manual

Sentinel
Sentinel SOLARFLUSH operating instructions

Inocal
Inocal RIRS 400HE Technical data

Watlow
Watlow Relialine 170 Specifications