RMG 720 Guide

Operation and Maintenance,
Spare Parts edition 08/1991
Serving the Gas Industry - WORLDWIDE
720.20
Safety Shut-Off Valve
RMG 720

720.20 S.02

720.20 S.3
Our leaflet 720.00 gives full information with technical data, different versions, and dimensions of the safety shut-off
valve (SAV) RMG 720.
Our brochure "General Operating Instructions for Gas Pressure Regulators and Safety Devices" will be useful to fit
the valve into the line, put it into service and find faults that might disturb its operation.
The construction, set-up, supervision and maintenance of gas pressure regulating stations are subject to special
national technical rules which should be strictly observed, for example those given by the German DVGW Work-
sheets G 490, G 491, and G 495.
The frequency of periodical maintenance to be foreseen for the safety shut-off valve RMG 720 should be determined
according to the prevailing service conditions and the type and composition of the gaseous medium. We, therefore,
obstain from imposing any fixed intervals and would rather refer you to the recommendations given by the DVGW
Worksheet G 495 on "Gas Pressure Regulating Stations and Metering Stations for High Gas Volumes - Supervision
and Maintenance".
For maintenance all parts are to be cleaned and subjected to a thorough visual inspection. A visual inspection should
not be omitted when the course of operation or performance tests have shown lack of response accuracy.
Particular care should be given to the checking of sealings and diaphragms, as well as all carrying and movable parts.
Damaged parts should be replaced by new ones.
The item numbers referred to in the maintenance instructions are identical with those of the spare parts drawings and
spare parts lists.
We recommend to keep all parts that are specially marked (*) in the spare parts lists in stock for prompt maintenance
availability.
2. Special operating instructions
• Opening the safety shut-off valve (SAV)
The SAV is provided with underpressure shut-off release. Re-engagement is possible only after the pressure pre-
vailing at the measuring point comes up to the service pressure p . The pressure compensation necessary for re-
opening is automatically effected by the pressure compensating valve integrated in the valve plate.
Measuring units K 1a, K 2a
(for incorporation into RMG 720 DN 25, and into RMG 300, RMG 330, RMG 332 as well as RMG 402)
Screw out locking cap (1), turn upside-down, screw
it on to valve stem and turn slowly towards body:
The pressure compensation will respond.
Pull locking cap until stop and let it go back
smoothly: The SAV is open and will re-engage.
In order to ensure perfectly reliable SAV-release
performance after re-opening, it is
to screw the locking cap back into its normal
position
a
ATTENTION
indispensable
1. General Remarks
locking cap (1)
valve stem (40, 53, 59)

720.20 S.04
Measuring units K4, K5, K6
(for incorporation into RMG 720, DN 50 to DN 100, and into RMG 330, RMG 332, RMG 408)
Press valve stem towards main body; cap (130) and
a suitable tool (screw driver) can be used as a lever.
Exert pressure SLOWLY and wait until pressure
compensation is effected. Press valve stem
through until stop and let it go back smoothly:
The SAV is open and will re-engage.
When using the tripping valve RMG 919-3 instead
of a breathing line, make sure to screw out the
locking screw (100) prior to re-engagement
operation.
Measuring units K4, K5, K6
(for incorporation into RMG 402)
Screw out locking cap, turn it round, screw it on
to valve stem and turn slowly towards body;
the pressure compensation valve will respond.
Pull locking cap until stop and let it go back
smoothly: The SAV is open and will re-
engage.
In order to ensure perfectly reliable SAV-release
performance after re-opening, it is indispensable
to screw the locking cap (201) back into its normal
position.
• Tripping tests
In order to avoid the risk of mechanical damages tripping tests should be effected only after the measuring unit will
have been mounted into the main valve body.
ATTENTION
ATTENTION
valve stem (207)
locking cap (201)
locking screw (100)
valve stem (156)
cap (130)
ATTENTION
tripping valve
RMG 919
tripping valve
RMG 919
Tripping tests with the measuring units K4, K5, K6 incorporated in the gas pressure regulator
RMG 402 must not be made as long as the locking cap (201) is screwed on to the valve stem
(207).

720.20 S.05
3. Special maintenance instructions
• Measuring units
Trip the SAV before you remove it from the body. SAV valves provided with underpressure release (standard version)
will close automatically.
ATTENTION
Prior to dismantling the tripping mechanism, the valve plate and the valve stem (40, 53, 59, 156, 207) of a measuring
unit released by underpressure should be moved back to reach at least its re-engagement position.
In view of the necessity of a new zero-adjustment by means of the shim (138, 234) an exchange of the measuring units
K5 for K4 or K4 for K5 or K6 cannot be made at site.
• Valve stem (40, 53, 59, 156, 207)
It is important that the valve stem can be moved easily and smoothly. Should any faults or damages of material (e.g.
ridges or flaws) be detected at the valve stem shoulder, the valve stem has to be replaced by a new one.
When fitting an new (two-piece) valve stem into the measuring units K4, K5, K6 of the series produced up to 1989,
make sure that a new guide sleeve (139, 243) and a new closing spring (119, 242) are mounted together with the
valve stem. The new version does not provide for a pressure relief ball mechanism.
Before inserting the valve stem (156, 207) into the guide sleeve (139, 242) pull the pressure relief balls (former
version) apart by applying the special assembly bolt W4 from above.
• Spring retainer (24, 103, 204)
The contact surfaces between spring retainer and diaphragm plate (26) and between switch bush (8), spring retainer
and guide sleeve (104, 206) should be kept free from grease.
• Relieving springs
For maintenance of measuring units K4, K5, K6 delivered before July 1986 make sure to fit new relieving springs
stock no. 10 008 640.
• Valve plate (155, 222)
For inserting the O-ring (124, 220) into the groove of the valve plate proceed as follows:
- grease the O-ring and put it on the groove; apply an equal pressure by hand on several points around its circum-
ference for even insertion.
- press the O-ring fully into the groove.
• Shim (138, 234)
The shim serves to adjust the tripping device to its exact zero position. After any replacement of the diaphragm, the
shim must be re-integrated unchanged.

720.20 S.06
• Switch bush (8, 26, 137, 232)
If the bush shows any signs of defects (e.g. flaw in material), replace it by a new one.
• Torque
Tighten the screws (9, 148) and nuts (51, 58, 113, 213) by torque wrench to the torque levels of the table below:
• Lubricants
screws and nuts
item no.
9
51
58
113, 213
148
torque figues M in Nm
SAV RMG 720
size DN
25 50 80 100
sub-unit for incorporation
into RMG 300, 330, 332
size DN
25 50 80 100
sub-unit for incorporation
into RMG 402, 408
inlet size DN
25 50 80 100
12
10
20
10
20
10
20
12
12
12
10
40
12
12
12
10
40
10
40
10
40
12
12
12
10
25
10
40
10
40
A
Lubricant
silicone grease
stock no. 00 027 079 (box)
stock no. 00 027 081 (tube)
fitting paste
stock no. 00 027 091
pressure gun grease
stock no. 00 027 058
application (grease parts slightly)
all O-rings
diaphragm reinforcement (10, 140, 211)
valve stem guide range (40, 53, 59, 156, 207)
switch balls and bushes (14, 18, 52, 63, 106, 137, 208, 232)
setpoint adjusting screw (4, 102, 202)
screwed pipe connections (28, 37, 49, 143, 168, 172, 231, 236, 249)
fastening bolts and screws (9, 17, 45, 127, 148)

720.20 S.07
W7
W6
(for former models)
RMG 720
RMG 300
RMG 330
RMG 332
RMG 402
RMG 720
RMG 330
RMG 332
RMG 402
RMG 408
for all models
RMG stock no.
• Tools for assembly and adjustment
type
RMG 720
RMG 300
RMG 330
RMG 332
RMG 402
RMG 330
RMG 332
RMG 402
RMG 720
RMG 330
RMG 332
RMG 402
RMG 408
DN 25
DN 25
DN 25 and DN 50
DN 25 and DN 50
DN 25
DN 80 and DN 100
DN 80 and DN 100
DN 50 to DN 100
DN 50 to DN 100
DN 80 and DN 100
DN 80 and DN 100
DN 50 to DN 100
DN 50 to DN 100
size for item no. tool no. description
tool for assembly
13 W1 pliers A 19 DIN 5254 00 026 531
20, 121,
219, 308 W2 pliers D 19 DIN 5256 00 026 532
110,
238,
322 W5
twin-dowel key
10 008 582
DN 25
DN 25
DN 25 and DN 50
DN 25 and DN 50
DN 25
DN 50 to DN 100
DN 80 and DN 100
DN 80 and DN 100
DN 50 to DN 100
DN 50 to DN 100
4W7
102,
202 W7
tool for adjustment
5, 133, 227 W8
W8
10 004 912

720.20 S.08
Spare parts
Measuring units K 1a / K 2a
Spare parts drawing of K 1a / K 2a
Drawing for RMG 720, DN 25 and RMG 402, DN 25
*) parts to be kept in stock for maintenance
measuring unit for
underpressure release only measuring unit for overpressure release only,
special version
(without diaphragm rupture safety protection)
measuring unit for
overpressure and underpressure release
4.
4.1.
4.1.1.
4.1.1.1.
partial view A
K 1a K 2a

720.20 S.09
Drawing for RMG 300, DN 25,
and for RMG 330, RMG 332, DN 25 and DN 50
*) parts to be kept in stock for maintenance
RMG 330, RMG 332
4.1.1.2.
RMG 300

720.20 S.10
material
RMG stock no.
K 1a K 2a
item
no. description
1
2*
3
4
5
6
-
-
-
-
7*
8*
9
10*
11
12
13*
14*
15*
16
17
18
19*
20*
21*
22*
23
-
24
25
-
-
-
-
26
27*
28
29
SAV locking cap
sealing ring
spring housing
spring plate
spring plate
setpoint spring:
wire dia. 2,5
wire dia. 3,2
wire dia. 3,6
wire dia. 4,75
O-ring
switch bush, complete
cylinder screw
diaphragm
diaphragm plate
pressure disc
securing ring
ball
O-ring
plug
hexagon socket screw
SAV support, complete
O-ring
securing ring
valve plate, vulcanized
valve plate, vulcanized
main valve body:
ratedPN 16
rated ANSI 150 (p zul 16 bar)
spring retainer
setpoint spring:
wire dia. 1
wire dia. 1,1
wire dia. 1,2
wire dia. 1,4
diaphragm plate, complete
sealing ring
screwed socket
cutting ring
LM
K
GLM
Ms
K
SF
SF
SF
SF
KG
LM/NSt/St
St
KG
St
LM
SF
NSt
KG
K
St
LM/NSt/St/KG
KG
SF
LM/KG
LM/KG
GS
GS
K
SF
SF
SF
SF
LM/KG
LM
St
St
10 000 854
00 020 343
10 010 608
10 001 844
10 000 856
-
10 000 866
10 000 867
10 001 839
00 021 069
-
00 010 150
18 354 902
-
-
-
00 005 108
00 020 371
00 026 066
10 004 895
10 010 585
00 020 243
00 019 093
10 003 580
10 004 942
10 008 454
10 008 455
10 008 563
-
10 000 868
-
10 001 760
10 004 929
00 018 694
10 007 642
00 030 904
Spare parts list for K 1a / K 2a
List for RMG 720, DN 25 and RMG 402, DN 25 (inlet size)
Parts marked by an asterisk (*) to be kept in stock for maintenance:
10 000 854
00 020 343
10 010 608
10 001 844
10 000 856
10 001 838
10 000 866
10 000 867
10 001 839
00 021 069
10 010 612
00 010 150
10 010 610
10 010 611
10 004 882
00 019 131
00 005 108
00 020 371
00 026 066
10 004 895
10 010 585
00 020 243
00 019 093
10 003 580
10 004 942
10 008 454
10 008 455
10 008 563
10 001 826
-
10 001 837
10 001 760
-
00 018 694
10 007 642
00 030 904
material key:
K ... plastic material
KG ... rubber-like plastic material
LM ... light metal
GS ... cast steel
colour:
yellow
bright red
dark red
white
St ... steel
NSt... stainless steel
SF ... spring steel
colour:
yellow
light blue
white
black
4.1.2.
4.1.2.1.

720.20 S.11
00 010 150
00 003 399
10 010 595
10 004 923
00 020 345
10 004 933
10 009 227
00 010 150
00 003 399
10 010 614
00 020 563
10 011 077
10 011 080
10 010 605
10 011 076
10 011 081
00 010 150
00 003 399
10 010 595
10 004 923
00 020 345
10 004 933
10 009 227
00 010 150
00 003 399
10 010 614
00 020 563
10 011 077
10 011 080
10 010 605
10 011 076
10 011 081
St
St
LM/St/KG
NSt
KG
LM
SF
St
St
NSt
KG
SF
St
LM
LM/KG
LM/KG
cylinder screw
hexagon nut
SAV support, complete
valve stem, complete
O-ring
intermediate piece
pressure spring
cylinder screw
hexagon nut
valve stem, complete
O-ring
pressure spring
connecting sleeve
SAV support, complete
valve plate, vulcanized
valve plate with relief jet
50
51
52
53*
54*
55
56
57
58
59*
60*
61
62
63
64*
65*
material RMG stock no.
K 1a K 2a
item
no. description
30
31*
32
33
34*
35
36
37
38*
39
40*
41*
42*
43
44*
45
46
47*
48
49
cap nut
O-ring
supporting ring
intermediate ring
O-ring
cutting ring
cap nut
screwed socket
sealing ring
hexagon nut
valve stem, complete
O-ring
O-ring
pressure spring
sealing ring
locking screw
arresting tube
Seeger grip ring
stay tube
tripping valve RMG 919-1
St
KG
LM
LM
KG
St
St
St
LM
St
NSt
KG
KG
SF
LM
St
LM
St
LM
-
00 030 804
00 020 361
10 004 938
10 010 598
00 021 005
00 030 904
00 030 804
10 007 642
00 018 694
10 004 924
10 008 635
00 020 345
00 020 243
10 009 227
00 018 689
00 026 175
10 001 784
00 019 183
10 010 584
10 022 971
00 030 804
-
-
-
-
00 030 904
00 030 804
10 007 642
00 018 694
-
10 008 635
00 020 345
00 020 243
10 009 227
00 018 689
00 026 175
10 001 784
00 019 183
10 010 584
10 022 971
material RMG stock no.
K 1a K 2a
item
no. description
List for sub-units for incorporation into RMG 300, DN 25
and for RMG 330 and RMG 332, DN 25 and DN 50
Parts marked with an asterisk (*) to be held in stock for maintenance:
RMG 330, 332:
RMG 300:
4.1.2.2.
material key:
K ... plastic material
KG ... rubber-like plastic material
LM ... light metal
GS ... cast steel
St ... steel
NSt... stainless steel
SF ... spring steel

720.20 S.12
Measuring units K4, K5, K6
Spare parts drawing of K4, K5, K6
Drawing for RMG 720, DN 50 to DN 100, for RMG 330 and RMG 332,
DN 80 and DN 100, and for RMG 408, DN 50/100 to DN 100/200
measuring unit K4 for
overpressure and underpressure release
4.2.
4.2.1.
4.2.1.1.
measuring unit K4 for
overpressure release only
special version (without diaphragm
rupture safety protection)
measuring unit K6 for
underpressure release only
*) parts to be held in stock for maintenance

720.20 S.13
Drawing for RMG 402, DN 50 to DN 100 (inlet size)
*) parts to be kept in stock for maintenance
4.2.1.2.
measuring unit K6 for
underpressure release only
measuring unit K4 for
overpressure and underpressure release measuring unit K4 for
overpressure release only
special version (without diaphragm
rupture safety protection)

720.20 S.14
10 008 569
00 020 429
10 001 844
10 008 563
10 008 564
10 022 115
00 005 108
00 020 430
10 008 551
10 008 552
10 008 553
00 010 043
10 008 567
00 017 201
00 008 281
00 005 559
00 020 413
00 020 383
10 007 589
10 008 577
00 020 246
00 019 127
10 008 612
00 020 412
00 020 596
00 020 432
00 020 281
00 012 324
00 014 123
00 003 399
10 008 581
10 008 580
10 008 533
10 008 535
10 008 856
material RMG stock no.
DN 50 DN 80 DN 100
item
no. description
100
101*
102
103
104
105
106
107*
108
-
-
-
109
110
111
112
113
114*
-
-
117*
118
119
120*
121
122
123*
124*
125*
126*
127
128
129
130
131
132
-
-
133
locking screw
O-ring
spring plate
spring retainer
guide sleeve
attenuating disc
ball
O-ring
diaphragm plate:
for K 4, Ø 122 mm
for K 5, Ø 68 mm
for K 6, Ø 42 mm
hexagon screw
double hole round nut
grooved pin
washer
hexagon nut
O-ring
-
-
O-ring
ring segment
pressure spring
O-ring
Seeger circlip ring
ring segment
O-ring
O-ring
O-ring
O-ring
gudgeon/hexagon screw
safety washer / washer
hexagon nut
valve stem cap
receiving cap (for response tests)
cover:
for K4
for K5 and K6
spring plate
LM
KG
Ms
K
Ms
KG
NSt
KG
LM
LM
LM
St
St
St
St
St
KG
KG
St
NSF
KG
SF
St
KG
KG
KG
KG
St
St
St
LM
Ms
GLM
GLM
K
10 008 569
00 020 429
10 001 844
10 008 563
10 008 564
10 022 115
00 005 108
00 020 430
10 008 551
10 008 552
10 008 553
00 010 043
10 008 567
00 017 201
00 008 281
00 005 559
00 020 413
00 020 383
10 007 589
10 008 577
00 020 247
00 019 127
10 008 612
00 020 412
00 020 268
00 020 432
00 020 281
00 012 324
00 014 123
00 003 399
10 008 581
10 008 580
10 008 533
10 008 535
10 008 856
Spare parts list for K4, K5, K6
List for RMG 720, DN 50 to DN 100, for RMG 330 and RMG 332,
DN 80 and DN 100, and for RMG 408, DN 50/100 to 100/200
Parts marked by an asterisk (*) to be held in stock for maintenance:
10 008 569
00 020 429
10 001 844
10 008 563
10 008 564
10 022 115
00 005 108
00 020 430
10 008 551
10 008 552
10 008 553
00 010 043
10 008 567
00 017 201
00 008 281
00 005 559
00 020 413
00 020 383
10 007 589
10 008 577
00 020 247
00 019 127
10 008 612
00 020 412
00 020 268
00 020 432
00 020 281
00 012 324
00 014 123
00 003 399
10 008 581
10 008 580
10 008 533
10 008 535
10 008 856
4.2.2.1.
material key:
K ... plastic material
KG ... rubber-like plastic material
LM ... light metal
Ms ... brass
GS ... cast steel
St ... steel
NSt ... stainless steel
SF ... spring steel
GLM ... cast light metal

720.20 S.15
10 000 868
10 001 760
10 000 866
10 000 867
10 001 761
10 021 404
10 008 616
00 014 135
10 008 558
10 008 545
10 008 547
10 008 549
00 030 026
00 018 694
10 008 521
10 008 523
10 008 500
00 010 032
00 014 113
00 020 432
10 008 559
-
10 008 614
10 008 606
10 008 599
10 008 592
-
10 008 462
10 008 463
10 008 559
00 026 550
10 008 620
10 008 571
10 008 579
00 011 084
00 006 157
10 001 784
material RMG stock no.
DN 50 DN 80 DN 100
item
no. description
134
-
-
135
-
-
-
136
137
138
139
140*
-
-
-
-
-
143
144
145
-
-
-
147
148
149
150*
151
152
153
154*
155
156*
157
-
-
-
158
159
160
161
162
-
164
165
166
setpoint spring:
wire dia. Ø 1,1
wire dia. Ø 1,4
setpoint spring:
wire dia. Ø 3,2
wire dia. Ø 3,6
wire dia. Ø 4,5
hexagon nut
switch bush
shim
guide cylinder
diaphragm:
K 4
K 5
K 6
-
-
straight screwed plug connection
sealing ring
measuring unit flange:
for K 4
for K 5 and K 6
-
connecting flange
hexagon screw
safety washer
O-ring
disk
intermediate piece
nut
valve plate, complete
valve plate
valve stem, complete
main valve body:
rated PN 16
rated PN 16
rated ANSI 150
disk
screw plug
tube ring
valve stem guide
valve stem cap
-
cylinder screw
disk
arresting tube
SF
SF
SF
SF
SF
St
NSt
LM
Al-Bz
KG
KG
KG
St
LM
LM
LM
GGG
St
St
KG
St
LM
NSt
LM/KG
LM
NSt
GGG
GS
GS
St
K
KG
LM
LM
St
St
LM
10 000 868
10 001 760
10 000 866
10 000 867
10 001 761
10 021 404
10 008 616
00 014 135
10 008 558
10 008 545
10 008 547
10 008 549
00 030 026
00 018 694
10 008 521
10 008 523
10 008 502
00 010 445
00 014 115
00 020 432
10 008 559
10 008 641
10 008 614
10 008 606
10 008 601
10 008 592
10 008 437
10 008 467
10 008 469
10 008 559
00 026 550
10 008 620
10 008 571
10 008 579
00 011 084
00 006 157
10 001 784
10 000 868
10 001 760
10 000 866
10 000 867
10 001 761
10 021 404
10 008 616
00 014 135
10 008 558
10 008 545
10 008 547
10 008 549
00 030 026
00 018 694
10 008 521
10 008 523
10 008 502
00 010 445
00 014 115
00 020 432
10 008 559
10 008 641
10 008 614
10 008 606
10 008 601
10 008 592
10 008 427
10 008 464
10 008 466
10 008 559
00 026 550
10 008 620
10 008 571
10 008 579
00 011 084
00 006 157
10 001 784
material key:
K ... plastic material
KG ... rubber-like plastic material
LM ... light metal
GS ... cast steel
St ... steel
NSt ... stainless steel
SF ... spring steel
GLM ... cast light metal
Al-Bz ... aluminium-bronze
GGG ... nodular cast iron
colour:
light blue
black
colour:
bright red
dark
black

720.20 S.16
10 008 538
10 022 971
00 018 694
00 030 804
00 030 904
00 030 113
00 020 596
00 005 692
00 014 113
10 008 599
10 008 592
00 026 363
material RMG stock no.
DN 50 DN 80 DN 100
item
no. description
167
168
169*
170
171
172
124*
148
149
155
156*
163
124*
148
149
155
156*
ring support (K6 only)
tripping valve RMG 919-1
sealing ring
cap nut
cutting ring
screwed socket
O-ring
hexagon nut
safety washer
valve plate
valve stem, complete
protection cap
O-ring
hexagon nut
safety washer
valve plate
valve stem, complete
LM
-
LM
St
St
St
KG
St
St
LM
NSt
KG
KG
St
St
LM
NSt
10 008 538
10 022 971
00 018 694
00 030 804
00 030 904
00 030 113
00 020 268
00 013 120
00 014 113
10 008 601
10 008 594
00 026 363
00 020 268
00 013 120
00 014 114
10 008 601
10 008 594
material key:
K ... plastic material
KG ... rubber-like plastic material
LM ... light metal
St ... steel
NSt ... stainless steel
Ms ... brass
10 008 538
10 022 971
00 018 694
00 030 804
00 030 904
00 030 113
00 020 226
00 013 120
00 014 114
10 008 600
10 008 593
00 026 363
00 020 266
00 013 120
00 014 114
10 008 600
10 008 593
Parts of sub-unit for incorporation into RMG 408, DN 50/100 to DN 100/200:
Parts of sub-unit for incorporation into RMG 330 and RMG 332, DN 80 and DN 100:
List for RMG 402, DN 50 to DN 100 (inlet size)
Parts marked by asterisk (*) to be kept in stock for maintenance:
10 021 413
10 001 844
10 000 865
10 000 866
10 000 867
10 001 761
10 009 563
00 020 316
10 021 411
10 021 415
10 021 794
10 021 417
10 021 404
10 022 115
material RMG stock no.
DN 50 DN 80 DN 100
item
no. description
201
202
203
-
-
-
-
204
205*
206
207*
-
-
-
-*
locking screw
spring plate
setpoint spring:
wire dia. Ø 2,5
wire dia. Ø 3,2
wire dia. Ø 3,6
wire dia. Ø 4,5
spring retainer
O-ring
guide sleeve, complete
pre-assembled valve stem, consisting of:
valve stem, complete
connecting rod
hexagon nut
attenuating disk
LM
Ms
SF
SF
SF
SF
K
KG
Ms/KG/St
NSt
NSt/St
NSt
St
KG
10 021 413
10 001 844
10 000 865
10 000 866
10 000 867
10 001 761
10 009 563
00 020 316
10 021 411
10 021 795
10 021 794
10 021 848
10 021 404
10 022 115
10 021 413
10 001 844
10 000 865
10 000 866
10 000 867
10 001 761
10 009 563
00 020 316
10 021 411
10 021 795
10 021 794
10 021 848
10 021 404
10 022 115
colour:
yellow
bright red
dark red
black
4.2.2.2.

720.20 S.17
00 005 108
10 008 551
10 008 552
10 008 553
00 010 043
10 008 545
10 008 547
10 008 549
10 008 281
00 005 559
00 017 201
10 007 589
10 008 500
00 019 127
00 020 596
10 008 599
10 008 606
00 020 412
10 008 612
10 008 614
00 020 429
10 000 856
10 000 868
10 001 760
10 008 533
10 008 535
00 018 694
10 022 971
10 008 616
00 020 430
00 014 135
00 018 694
00 030 026
10 008 521
10 008 523
10 008 567
00 020 413
00 020 383
material RMG stock no.
DN 50 DN 80 DN 100
item
no. description
208*
209
-
-
-
210
211*
-
-
-
212
213
214
-
-
217
218
219*
220*
221
222*
223*
224
225
226*
227
228
-
-
229
-
-
230*
231
232*
233*
234
235*
236
237
-
-
238
239*
-
241*
ball
diaphragm plate:
for K 4
for K 5
for K 6
hexagon screw
diaphragm:
for K 4
for K 5
for K 6
washer
hexagon nut
pin
-
-
ring segment
SAV connecting flange
snap ring
O-ring
valve plate with relief valve
valve plate, vulcanized
O-ring
ring segment
nut
O-ring
spring plate
setpoint spring:
wire dia. Ø 1,1
wire dia. Ø 1,4
diaphragm cover:
for K 4
for K 5 and K 6
sealing ring
tripping valve RMG 919-1
switch bush
O-ring
disk
sealing ring
screwed connection
measuring unit flange:
for K4
for K5 and K6
double hole round nut
O-ring
-
O-ring
NSt
LM
LM
LM
St
KG
KG
KG
St
St
St
St
St
SF
KG
LM
LM/KG
KG
St
NSt
KG
K
SF
SF
LM
LM
LM
NSt
KG
LM
LM
St
LM
LM
St
KG
KG
00 005 108
10 008 551
10 008 552
10 008 553
00 010 043
10 008 545
10 008 547
10 008 549
10 008 281
00 005 559
00 017 201
10 007 589
10 008 502
00 019 127
00 020 268
10 008 601
10 008 606
00 020 412
10 008 612
10 008 614
00 020 429
10 000 856
10 000 868
10 001 760
10 008 533
10 008 535
00 018 694
10 022 971
10 008 616
00 020 430
00 014 135
00 018 694
00 030 026
10 008 521
10 008 523
10 008 567
00 020 413
00 020 383
00 005 108
10 008 551
10 008 552
10 008 553
00 010 043
10 008 545
10 008 547
10 008 549
10 008 281
00 005 559
00 017 201
10 007 589
10 008 502
00 019 127
00 020 266
10 008 600
10 008 606
00 020 412
10 008 612
10 008 614
00 020 429
10 000 856
10 000 868
10 001 760
10 008 533
10 008 535
00 018 694
10 022 971
10 008 616
00 020 430
00 014 135
00 018 694
00 030 026
10 008 521
10 008 523
10 008 567
00 020 413
00 020 383
material key:
K ... plastic material
KG ... rubber-like plastic material
LM ... light metal
St ... steel
NSt ... stainless steel
SF ... spring steel
colour:
light blue
black

720.20 S.18
10 008 577
10 008 557
00 020 432
00 019 183
10 010 584
10 001 784
00 030 113
00 030 804
00 030 904
material RMG stock no.
DN 50 DN 80 DN 100
item
no. description
242
243
244*
245
246
247
-
249
250
251
pressure spring
guide cylinder, pre-assembled
O-ring
Seeger grip ring
stay tube
arresting tube
-
screwed socket
cap nut
cutting ring
SF
Al-Bz
KG
St
LM
LM
St
St
St
10 008 577
10 008 557
00 020 432
00 019 183
10 010 584
10 001 784
00 030 113
00 030 804
00 030 904
material key:
K ... plastic material
KG ... rubber-like plastic material
LM ... light metal
St ... steel
SF ... spring steel
Al-Bz .. aluminium-bronze
10 008 577
10 008 557
00 020 432
00 019 183
10 010 584
10 001 784
00 030 113
00 030 804
00 030 904
5. SAV-model produced from 06/89 to 03/91
measuring unit
spring cover with
throttling port
Remark:
It is possible to integrate the tripping valve RMG 919 (see item 168, page 15) into formerly delivered SAV-units.
In this case the throttling port should be rebored to at least 4 mm.

720.20 S.19
6.
6.1.
6.1.1
Special features
Spare parts drawings
Remote release upon current supply
6.1.2. Manual release

313 / 314
316
311
313 / 314
313 / 314
315
311 / 312
720.20 S.20
6.1.3. Remote release and manual release upon current supply
remote release
manual release
Other RMG Control Unit manuals
Popular Control Unit manuals by other brands

Glyn
Glyn ACLAVIS TX-LVDS manual

TRIGA
TRIGA TR-CONTROL-6 Installation and maintenance instructions

CVS Controls
CVS Controls DBQ Series instruction manual

Gemu
Gemu 410 Installation, Operating and Maintenance Instructions for the Installer and the User

Water Specialist
Water Specialist WS1TT Drawings and Service Manual

Solartron Metrology
Solartron Metrology BICM Series User Leaflet

Pfeiffer Vacuum
Pfeiffer Vacuum UDV 046 operating instructions

resideo
resideo Braukmann D15SN installation instructions

STW
STW TCG Series Starting up

GEM
GEM 617 Installation, operating and maintenance instructions

Vimar
Vimar Elvox ECP2 Connection and operating manual

A.R.I.
A.R.I. Eliptix R-30 R 2W Installation, Operating, Maintenance