- 20 Series rotary Joints are designed to work with ball bearings need lubrication periodically while in
operation.
- Do not apply too much grease on ball bearings. Over greasing will result damage of the bearings.
- All 20 Series Rotary Joints are equipped with grease relief valve to protect ball bearings from over
greasing.
- Always use fresh grease to the ball bearings.
- Before maintenance, be sure that no feed pressure is applied.
- If the rotary joint is defected and leaking occurs, replace seals with new ones and do not work with
leaking joints.
LUBRICATION
1. First hold the housing of the joint with a bench wise. Do not clamp
too tightly, it will damage housing or bearings.
2. Apply sealant/adhesive or teflon tape to the threads of the
hoses and assemble them to the housing.
4. If shaft outlets are threaded, apply sealant/adhesive or teflon
tape to the threads of the outlet hoses and assemble to the
shaft.
3. If housing connections are SAE Flange, place o-rings into the
grooves and fix flanges of the hoses with appropriate bolts.
10. Do not pipe direclty. It may create excessive side loads and
damage the joint.
11. Attach an anti rotation rod to anti rotation connection of the
housing. Be sure that one end of the rod is fixed to the housing and
the other end floats freely.
12. Rigid connection of the anti rotation rod will damage the joint.
13. If shaft flange connections are threaded; connect hoses on the
shaft to the machine connections.
14. Connect hoses on the housing to the supply lines.
5. Clean rotating joint flange face and machine bore surface
before assembling.
7. Align rotating joint flange and machine bore flange.
9. If shaft outlets are threaded, align shaft outlets with machine
connections and fix the shaft to the machine with appropriate bolts.
6. If shaft outlets are with o-rings&grooves; place o-rings into the
grooves of the shaft flange and apply grease slightly to fix the o-rings
inside the grooves.
8. If shaft outlets are with o-rings&grooves; align flange plot bore and
flow channels to the machine bore and flow channels; fix the shaft
to the machine with appropriate bolts.
16. After assembly; control rotation of joint. If any wobble, vibration,
knocking or noise show up or if any eccentricity seems; disassemble
the joint from the machine and assemble it again.
15. After assembly, check rotating joint for leakage. A small amount of
leakage may be seen in the starting period. Never use leaking joint.