Installation
To install the printer, proceed as follows:
Installing the Rechargeable Batteries
y Remove the 4 rechargeable batteries from the packaging (the batteries
are discharged).
y Open the paper roll compartment by lifting the paper roll compartment
cover.
y Open the battery compartment by tilting back the battery compartment
cover.
y Insert the 4 rechargeable batteries into the battery compartment.
Make sure that the poles match the + and – signs.
y Close the battery compartment.
y Close the paper roll compartment.
You cannot thread the paper roll until the printer has been turned on.
Connecting the Printer to the arium® and Turning it on
y Connect the included mains adapter to the printer.
y Connect the interface cable to the printer.
y Turn on your arium® device.
y It takes 28 hours to charge the batteries to full capacity.
Inserting a Paper Roll
y Follow the instructions for inserting a paper roll in the t „Operating
Instructions,“ „Maintenance“ chapter (page 71).
Configuration
y Go to the „Printer Port“ menu by pressing the „p“ key (hold for at least 5 seconds).
y Use the „▲,“ „▼,“ „r“ and „l“ keys to navigate within the „Printer Port“ menu as
per t section 3: Sartorius 611APR1 Data Printer – Menu Control.
y Check the settings as per section 2 and change if necessary.
y The following values must be set:
Setting options Value to be set
Baud rate 1920 0 19,200 bd
Data bits 7 0 7 data bits
Parity 0 0 Space parity
Handshake 0 0 Hardware DTR|CTS
P1: Send CR|LF 1 0 On printout with CR|LF
P2: Print format 0 0 Right-justified
P3: Decimal char 0 0 Decimal point
P4: Num. function 0 0 Print without numerator
P5: Inverse from 0 0 No inverse printing
P6: Print mode 0 0 Standard = Values stored individually
P7: Data|Time 1 0 Date|Time printing
P8: Print TEXT1 0 0 No Vartext 1 printing
P9: Print TEXT 2 0 0 No Vartext 2 printing
Fig. 2: Settings for arium®
2 3