
Senses Akustik I Installation manual IDuo
Assembly Guide - Important Information
This assembly guide is specifically for the right-hand opening door of the
Kolo Duo unit without furniture.
1.
2. The packaged Kolo Duo unit weighs 511 kg and should be installed by 2-3
individuals. The installation process typically takes an average of 45 to
90 minutes.
3. Exercise caution during assembly and ensure that the installation site is
protected to prevent any injuries or damage to the product or its
surroundings.
4. Position and assemble the Kolo Duo unit as close as possible to its final
placement. If necessary, the fully assembled unit can be repositioned by
retracting the four levelling feet and moving it using the bottom rollers.
However, be cautious not to push the unit against the direction of the
rollers to avoid tipping or damaging them.
5. Ensure that you have all the required tools & parts listed from page
03 to 07 before starting the assembly process.
6. We recommend maintaining a minimum of 30 cm of space between the
wall or between multiple units of the Kolo Duo.
7. Verify that the power source for the Kolo Duo can safely handle a load of 10
amps. When the ventilation is active, the LED light is at its full illumination,
and the power charging station is not in use, the wattage usage is 24W.
The power cord fuse is set at 7 amps to prevent overloading.
8. The Kolo Duo unit includes 2 AC power outlets and 2 USB charging outlets.
Do not connect any electronic devices that require more than 5 amps.