Sermatec HV5120 User manual

1/14
LFP Storage System
HV5120 User Manual
Document No.:
Version:V1.0

2/14
Contents
HV5120 USER MANUAL .............................................................................................................. 1
1. SCOPE AND SIGN ....................................................................................................................3
2. PRODUCT COMPONENTS ........................................................................................................6
2.1.1 PRODUCT MAIN COMPONENTS .........................................................................................6
2.1.2 BATTERY SYSTEM PORT .................................................................................................... 7
2.1.3 SYSTEM DIAGRAM .............................................................................................................7
2.1.4.ANNOUNCEMENTS OF PARALLEL CONNECTION BEFORE START-UP ................................9
2.2 DEFINITION OF COMMUNICATION PIN SOCKETS ............................................................ 10
2.3 PACKAGE ............................................................................................................................ 11
3. PRODUCT ELECTRICAL CHARACTER .................................................................................... 12
3.1 MODULE SPECIFICATION ...................................................................................................12
4. MANAGEMENT SYSTEM (BMS) FUNCTION ...........................................................................13
5. PRODUCT EXTERIOR REQUIREMENT ...................................................................................13
6. DATA STORAGE REQUIREMENT ........................................................................................... 13
7. PACKING, TRANSPORTATION, STORAGE REQUIREMENTS ................................................. 13
7.1 PRODUCT PACKAGE PACKING REQUIREMENTS ................................................................ 13
7.2 PRODUCT TRANSPORTATION REQUIREMENTS .................................................................13
7.3 PRODUCT STORAGE REQUIREMENT .................................................................................. 13
8. REGULAR MAINTENANCE ..................................................................................................................14
8.1 SOC CHECK ......................................................................................................................... 14
8.2 CABLE CHECK ..................................................................................................................... 14
8.3 BALANCE ............................................................................................................................ 14
8.4 OUTPUT RELAY CHECK .......................................................................................................14
8.5 HISTORY CHECK .................................................................................................................14
8.6 MAINTENANCE ................................................................................................................... 14

3/14
1. Scope and Sign
1.1 This User Manual is to describe the technical indexes of HV5120 Battery Module produced by
Shanghai Sermatec Energy & Technology Co.,Ltd.And would be used as the basis of product inspection
by Sermatec Quality Department and Client.
1.2 This manual includes important description given below: The installation and usage of
HV5120 storage product must follow this manual. The design of the product and the tests are based
on the global safety requirements. But same for all the electricals, you must follow some prevention
strategies during installation and operation. To decrease the risk of human injury and make sure that
the product is installed and operated safely, you must read and follow all the descriptions,
announcements and warnings carefully.
1.3 Signs
Danger
Fatal Voltage!
Battery module would generate DC voltage, and would cause fatal
voltage and electric shock.
Only trained person can do the installation of the battery module.
Warning
Damaged battery system may lead to risk of human injury.
Don’t draw the connector when the system is working!
Cut off on several power source, and make sure that there is no
voltage left.
Alarm
Decrease the possibility of battery module system error or risk on
life-cycle.
Read
Sings
Please firstly read the User Manual and Datasheet before starting using
the battery!
Sign
Danger! Careful!

4/14
Sign l
Be Careful of Electric Shock!
Sign
Don’t put the system beside inflammables.
Sign
Don’t connect +/- reversely.
Sign
Don’t put the system beside fire.
Sign
Isolate the system from children and pets.
Sign
Recycle Sign
Sign
Waste Electrical and Elecctronic Equipment (WEEE) Command
(2012/19/EU)
Sign
EMC Certificate Sign

5/14
Sign
TÜV Rheinland Safety Certificate Sign
Danger: Battery provides electricity. When battery is short-circuit or wrongly installed,
may lead to danger of burn or fire.
Danger: Fatal voltage exists in battery port and cables. Touch cables or ports could lead to
serious human injury or death.
Warning: Please don’t open or change the appearance of the battery module;
Warning: When operate on the batteries, please wear proper Personal Protective
Equipment (PPE), e.g. rubber gloves, rubber boots, goggles.
Warning: LV5324 system working temperature range: 0℃~50℃; Proper temperature: 18℃~ 28℃. If
it exceeds the range, the battery life-cycle might be decreased or even cause battery system over/low
temperature warning or protection. And may influence warranty.
Warning: On the battery installation, installers shall follow the local installation standards.
Attention: Improper setting or service may permanently destroy the battery.
Attention: Wrong inverter parameters may lead to battery early aging.
Alarm
1)During installation or operation, please carefully read the user manual (in the
attachment), this is very important and necessary. If you don’t follow the instruction or
warnings in this document, it could lead to electric shock, serious damage, or death, or destroy the
battery and impossible to control the battery.
2)During Long period of storage, it is necessary to charge every half a year, SOC should be higher than
90%;
3)Battery need to be charged before 12 hours after fully charged.
4)Cables need to be sufficiently insulated.
5)During maintenance, all the battery ports must be disconnected.
6)If you find any error, please directly contact manufacturer in 24 hours.
7Please don’t use cleanse to wash the battery.
8)Please don’t expose the battery to inflammables or pungent chemicals or steam;
9)Please don’t paint any part of the battery, including inside or outside components.
10)Please don’t directly connect battery and PV panels.
11)Except authorized Sermatec staffs, don’t open, repair or disassembly batteries. Our company
doesn’t take responsibility for any results due to disobeying safety operation or design, production and
device safety standards.
12)Direct or indirect damage due to above items, is not included in Sermatec warranty.
13)It is not allowed to insert foreign matter to any part of the battery.
1.2Before connection

6/14
1)Please firstly check the product and pack list after opening the case. If there is any damage or
missing, please contact local dealer.
2)Before installation, please make sure that grid power is cut off, and make sure that the battery is at
‘Off’ condition.
3)Connection must be correct, don’t connect battery +/- reversely, and make sure that the battery is
not short-circuited.
4)Don’t connect battery directly with AC power.
5)Battery inner BMS is 51.2VDC, please don’t connect the battery in series.
6)The battery system shall be grounded sufficiently, and the resistance shall be smaller than 100mΩ.
7)Make sure that the battery system electrical parameters is compatible to related devices.
8)Make the battery far from water and fire.
1.3Usage
1)If you need to move or repair battery system, you must cut off the power, and totally
shut down the battery.
2)Don’t connect the battery with different types of batteries
3)Don’t connect the battery with malfunctioning or incompatible inverters.
4)Don’t disassembly the battery (When the QC label is teared or destroyed).
5)When fire occurs, please use dry powder extinguisher, don’t use liquid extinguisher.
2. Product Components
2.1.1Product main components
Component
Specification
Figure
Battery Box
100Ah 1P16S
Low Voltage BMS
Maximum Current 50A
Pedestal
Width 363mm Depth 590mm Height
72.5mm, 50A
Power Cables
Orange and Black 1xAWG3,Surlok Connector
Communication
Cable
CAN, RS485 communication cable
Battery Output
Surlok Port

7/14
2.1.2 Battery System Port
2.1.3 System Diagram
Power Output
Communication
Power Switch
SOC Display,
Status Indicator,
WiFi indicator,
Alarm Indicator

8/14
Model Type
HV5120
Battery Cell
LFP
Battery Energy(kWh)
20.48
25.60
30.72
35.48
40.96
Battery Voltage(Vdc)
204.8-409.6
Battery Capacity(AH)
400
500
600
700
800
Module Number(pcs)
4
5
6
7
8
Module Energy(kWh)
5.12
Module Voltage(Vdc)
51.2
Module Capacity(AH)
100
Cell Number(pcs)
16
Charging Voltage(Vdc)
228
285
342
399
456
Nominal Charging
Current(A)
20
Suggested Charging
Current(A)
50
Charging Current(A,
Max.@15S)
55
Cut-off Discharging
Voltage(Vdc)
189.6
237
284.4
331.8
379.2
Nominal Discharging
Current(A)
20
Suggested Discharging
Current(A)
50
Maximum Discharging
Current(A)
55
Efficiency(%, ≤
0.5C-rate)
96
Depth of Discharge%)
90
Dimension(W*D*H,
mm)
590*363
*985.5
590*363
*1168
590*363
*1350.5
590*363
*1533
590*363
*1715.5
Communication
RS485\CAN
Protection Level
IP55
Life Cycle(Years)
15+
Working
Temperature(℃)
0~50
Storage
Temperature(℃)
-20~60
Altitude(M)
<2,000
Product Certificate
IEC62619 CE
Transport Certificate
UN38.3

9/14
1)Controller Dimension
(W*D*H, mm)
2)Module Dimension
(W*D*H, mm)
3)Pedestal Dimension
(W*D*H, mm)
570*352*183
570*352*182.5
590*363*72.5
2.1.4 Announcements of parallel connection before start-up
1. Install and pile the batteries correctly, and then turn the switch to ‘ON’ position, start up the
batteries. When the batteries are installed wrongly, it would lead to startup error. After starting up
the system normally, the batteries would distribute the address automatically. The main control
box at the top would judge through the data sent from the below batteries.If the data sent from
the batteries are judged to be normal, the batteries would be started up successfully, otherwise
startup would fail.
2. Shut down. When the battery is not charged or discharged, then you can shut down the battery.
The switch can be used to cut-off the circuit when the battery is powering the loads. But to protect
outer devices, we suggest to firstly shutdown the loads and stop charging/discharging and then
turn the switch to ‘Off’, and make sure that the indicators are OFF, so that the battery is shut down.

10 /14
2.2 Definition of communication pin sockets
CAN: Communication Terminal:(RJ45 port) Follow CAN Protocol, used for
communication between battery and inverter.
RS485: Communication Terminal:(RJ45 port) Follow RS485 Protocol , used for
communication between battery and inverter
CAN
RS485
Baud
Rate
500K Default
19200 Default
No.
Description
1
CANH
RS485A
2
CANL
RS485B
3
GND
GND
4
5
6
--
7
--
8
--

11 /14
LV3584 LFP Battery Interface Description
No.
Name
Label
Function Description
1
Grounding Port
Used for Battery Grounding
2
Switch
Power Switch, while at ‘ON’ status,
system started up; While at ‘Off’
status, the system cannot be started
up, cannot output power.
3
RUN Indicator
RUN
When switch is at ‘ON’, the RUN
indicator would be ‘ON’.
4
SOC indicator
POWER
When the switch is at ‘ON’ status, the
control box would display SOC based
on the battery data.
5
WIFI and FAULT
WIFI/FAULT
Status indicator, Fault Indicator, WiFi
indicator
6
CAN Port
CAN
Used for communication
7
RS485 Port
RS485
Used for communication
8
- Input/Output Port
“-“
Battery Input/Output - Port
9
+ Input/Output
Port
“+“
Battery Input/Output + Port
2.3 Package
LV3584 Box,Inner Dimension:650mm*430mm*260mm;Outer Dimension:670mm*445mm*280mm
LV3584 Accessory Box,Outer Dimension:600mm*100mm*40mm
Battery Dimension:570mm*352mm*182.5mm
Accessory List
Accessory Name
Specification
Figure
Grounding Cable
Yellow-Green/1
Meter/10AWG/Two side
TL6-6 Circle Connector
nut, screw, bolt
Full Set

12 /14
Outer Accessory List
Accessory Name
Specification
Figure
+ Outer Power Cable
Orange/3m/4AWG/SURLOK
Connector/25-8 Connector
- Outer Power Cable
Black/3m/4AWG/SURLOK
Connector/25-8 Connector
Outer CAN
Communication Cable
Black/3.0m/STP/Two-Side RJ45
Connector
3. Product Electrical Character
3.1 Module Specification
Parameter
Specification
Remark
3.1.1Nominal Voltage
51.2V
3.1.2Nominal Capacity
Typical:104Ah
Charge normally and lay 0.5-1h,
0.1C discharge to 47.2V or
discharge until BMS protect.
Minimum:103Ah
3.1.3Nominal Charge
Method
0.2C Constant Current Constant Voltage (57V) charge until
discharge current 0.01C
3.1.4Nominal Discharge
Current
20A
3.1.5Discharging Protect
Current
55A
15s delay protection. 1 minute
after protection resume or directly
resume when there is charge
current
3.1.6Nominal Charging
Current
50A
3.1.7 Charging Protect
Current
55A
15s delay protection. 1 minute
after protection resume or directly
resume when there is discharge
current
3.1.8Battery Inner
Resistance (BMS Excluded)
Inner Resistance<20mΩ
3.1.9Upper Value of
Charging Voltage
57.6±0.1V
Suggested Charging Voltage 57±
0.5V
3.1.10Lower Value of
Discharging Voltage
47.2±0.1V
3.1.11Working Temperature
Charging
-10~60℃
Discharging
-10~60℃
3.1.12 Working Humidity
5%~95%
No condensation, system can work
normally
3.1.13Storage Temperature
-25℃~65℃

13 /14
4. Management System (BMS) Function
BMS has following function: Over-charging protection, over-discharging protection, high-voltage
protection, low-voltage protection, charging over-current protection, over-temperature protection,
low-temperature protection, short-circuit protection, battery cell balance function.
5. Product exterior Requirement
Battery exterior keeps clean, and installer need to firstly clean dusts and scrap iron before
installation and power on. And installer shall keep the area clean.
6. Data Storage Requirement
The battery test data must be stored in the database. So that the data can be checked with SN
number.
7. Packing, Transportation, Storage Requirements
7.1 Product Package Packing Requirements
Battery module precharge to 60%~70% SOC or deliver according to customer requirement. The
battery remaining SOC after going on boat depends on the storage time and storage condition.
1. Battery Module meets UN38.3 Certificate Standard.
2. Especially, the package must follow Revised Special Rule of Road Cargo Transportation and
Existing Dangerous Goods Act.
7.2 Product Transportation Requirements
Battery must be prevented from strong shaking, impact, extrusion, and must be prevented from
sunlight and rain. The battery can be transported through car, train, boat, air etc. for transportation.
The battery shall be lightly moved during assembly and disassembly, and cannot be dropped, rolled
and pressed hardly.
7.3 Product Storage Requirement
Battery shall avoid exposure to corrosive matters, and shall be away from fire and heat source.
Suggestion for storage:
a)Long-time Storage (more than 3 months), battery shall be stored under 5~45℃, relative
humidity 65%, without corrosive air. Battery module shall be stored under 5~45℃, dry, clean,
with good ventilation. Battery shall be charge to 50~55% SOC. And it is suggested to do a
chemical active charging and discharging every 3 months. The maximum time interval cannot be
longer than 6 months.
Note: If the battery is not long-time stored in the correct way mentioned above, the battery life
cycle would be decreased greatly.

14 /14
8. 【Regular Maintenance】Check the Battery Voltage through Monitoring. Check whether the
system voltage is normal or not. For example: Cell voltage is abnormally high/low.
8.1 SOC Check:
Use Monitoring system to check Battery System SOC status, and check the battery SOC is normal
or not.
8.2 Cable Check:
Check all the cables with eyes. Check whether there is breakage, aging, loosing.
8.3 Balance:
Long-time of not fully charged would lead to battery module unbalance. Solution: Do balance
maintenance every three months (Charge to 100% SOC). Generally speaking, this process can be
achieved automatically through communication between system and outer devices.
8.4 Output Relay Check:
When load is small (low current), control the switch of output relay, to hear the sound from the
relay, so that you will know that the relay is working normally.
8.5 History Check:
Analyze history records, check whether there is accident (warning, protection), and analyze on
the reasons.
8.6 Maintenance:
For the functions that needs maintenance during restarting, it is suggested to do maintenance
every 6 months. need recycle,
Destroyed batteries could have electrolyte leakage or generate combustible gas. If there is fire,
please call local Fire Alarm Number. If the destroyed batteriesthe recycling process shall follow
the local rules to achieve the recycle of related items.
If there is any further question, please contact us.
Shanghai Sermatec Energy&Technology Co.,Ltd.
Address:1388 Xindian Road, Jiading District, Shanghai, China
Phone No.:+86 021-69986891
Product Demand Email:presales@sermatec-ess.com
Technical Support Email:support@sermatec-ess.com
Table of contents
Other Sermatec Storage manuals
Popular Storage manuals by other brands

Lifetime
Lifetime 60298 Assembly instructions

TESVOLT
TESVOLT TS Series installation instructions

Compaq
Compaq StorageWorks 3000 - RAID Array release note

Fantec
Fantec MD-26U3 250GB specification

Dell EMC
Dell EMC Unity 480 Hardware Information Guide

Huawei
Huawei LUNA2000-200KWH-2H1 Smart String ESS Maintenance manual

Archos
Archos ARCFlash user manual

Oracle
Oracle ZFS installation guide

Western Digital
Western Digital My Book Thunderbolt Duo manual

Western Digital
Western Digital WDBFKT0040BGY-WESN user manual

Western Digital
Western Digital Scorpio Blue WD1200BEVE Specification sheet

Sun Microsystems
Sun Microsystems Sun StorEdge A1000 Installation, operation and service manual