Sofar SAR-100 User manual

Shenzhen SOFARSOLAR Co., Ltd.
USER
MANUAL
SOFAR SAR-100

Shenzhen SOFARSOLAR Co., Ltd.
11/F, Gaoxinqi Technology Building,
District 67, XingDong Community, XinAn Street,
Bao’An District, Shenzhen, China
SOFARSOLAR GmbH
Krämerstrasse 20
72764 Reutlingen
Germany
Email: service.uk@sofarsolar.com
Web: www.sofarsolar.com
Document number
Issue 01 | 05.2023
English

Content
1 About the Manual ................................ 1
2 Introduction ..................................... 2
3 Parameters....................................... 3
4 Feed-in Limitation System Diagram ............... 4
5 Product Installation .............................. 5
5.1 Tool.........................................................5
5.2 Location ....................................................6
6 Device Installation Procedure ..................... 7
6.1 Check the Packing...........................................7
6.2 Device Installation ...........................................7
6.3 Internal Structure ......................................... 10
6.4 Device Wiring ............................................. 11
7 Parameter Configuration.........................17
7.1 Login to Web Page ........................................ 17
7.2 WiFi Encryption ........................................... 18
7.3 Set Parameter ............................................. 19
7.4 Firmware Upgrade......................................... 32
8 Instruction for Indicator Light, Dial Switch and Reset
Button ..........................................33
8.1 Indicator Light............................................. 33
8.2 Relay Light ................................................ 33
8.3 DIN-Rail Logger Switch .................................... 34
8.4 DIN-Rail Logger Reset Button .............................. 34
Installation and User Manual

9 SOLARMAN Monitoring ..........................35
9.1 Register . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
9.2 SOLARMAN Business APP .................................. 36
9.3 SOLARMAN Smart APP..................................... 42
10 Q&A ............................................51
11 Contact US......................................52

1 About the Manual
1.1 About the Manual
This manual is intended for professional personnel who install and operate
theSAR-100Introduction
1.2 Interpretation of Symbols
CAUTION
Non-observance may result in minor injury.
eFollow the warnings in order to prevent injury!
/05*$&
eProvides tips essential to the optimal operation of the product.
Installation and User Manual 1/53
About the Manual

2 Introduction
Feed-in limitation box supports the feed-in limitation application of paral-
lel-connected machine for SOFARSOLAR inverter. It enables the real-time
monitoring of grid-tied situation through the integration of three-phase meter,
logger and CT (Customers need to purchase CT by themselves according to
on-site situation), which meets the requirement of real-time adjusting inverter
output power at self-consumption scenario. It can connect to multiple inverters
and support data transmission via WiFi&Ethernet.
2/53 SOFAR SAR-100
Introduction

3 Parameters
Parameter Description
Product Model SAR-100
Remote Communication 2.4G WiFi + Ethernet
Local Communication RS485
No. of Connections 10
Accessing Method Three-Phase Four-Wire
Working Voltage 3x230/400V 50/60Hz
Working Current 3x1.5(6)A
IP Grade IP65
Working Temperature -25°C~+60°C
Working Humidity 5%-95% (No Condensation)
Installation Method Wall-Hanging
Size 400*300*170mm
Weight 4.1kg
Installation and User Manual 3/53
Parameters

4 Feed-in Limitation
System Diagram
Load
R
S
T
N
Load
R
S
T
N
R
S
RS485 A
RS485 B
T
NInverter
R
S
Grid
T
N
R
S
RS485 A
RS485 B
T
NInverter
L1 L2 L3 N
L1 L2 L3 N
N
10
L2 L3
5 8
L1
2
S1 S2
P1 P2
S1 S2
P1 P2
S1 S2
P1 P2
1
Ia 1 Ia 2 A
24
B
253 4
Ib 1 Ib 2
6 7
Ic 1 Ic 2
9
S2 S1
P2 P1
S2 S1
P2 P1
S2 S1
P2 P1
1
Ia 1 Ia 2 A
24
B
253 4
Ib 1 Ib 2
6 7
Ic 1 Ic 2
9
Meter 1Meter 1 Meter 2
N
10
L2 L3
5 8
L1
2
A B
N
L
-
+
TA TB RA RB
V-G V+
RA RB
G
TA TB
+V -V
OUTPUT DC12V
4/53 SOFAR SAR-100
Feed-in Limitation System Diagram

5 Product Installation
5.1 Tool
Tool Name Picture Usage Remark
Wire stripper Strip cable insu-
lation
Cross screwdriver Use to connect
Wire cutter Used to cut power
cables
Adjustable
Wrench
Use to fi x expan-
sion screws
Percussion Drill Use to drillholes
Wire crimper Press line
Crystal head wire
pliers
Pressing crystal
head
Computer Use to operate
network confi gu-
ration
COM Line RS485 Communi-
cation
(Shielded twisted
pair)
Diameter: 3-7mm
Voltage connec-
tion line
Use to connect
voltage sampling
signal and power
supply
Specifi cation:
AWG 12-18,
105°/600V
Installation and User Manual 5/53
Product Installation

Tool Name Picture Usage Remark
Double-core cable Use to connect CT
signal
Specifi cation:
AWG 16-22,
105°/600V
5.2 Location
The installation location must meet the following requirements.
• Please install near the crossroad of grid side and grid-tie side. The wiring
length of CT shall not exceed 10m.
• The location recommended is to avoid damp and dust environment. Direct
sunlight and aggressive vapour should also be avoided. The ambient tem-
perature range: -25°C ~ +60°C.
• The maximum communication distance to the inverter should be less than
500m. The communication line should be far away from strong electricity
such as power lines.
• The installation position should be away from metal structures to ensure
WiFi signal quality.
6/53 SOFAR SAR-100
Product Installation

6 Device Installation
6.1 Check the Packing
Please ensure that the delivery list items are complete (list below):
/05*$&
eIf any item is damaged or missing, please contact SOFARSOLAR.
6.2 Device Installation
Installation Precautions
• It is recommended to install the data logger of the inverter and connect it
to the network.
• Power off the device before installation.
• Please use daisy-chain method when connecting the inverter through
RS485.
• Feed-in limitation box only supports one low-voltage bus and only supports
inverter access under the same low-voltage bus, which does not support
different low-voltage buses (As shown in the picture below).
Installation and User Manual 7/53
Device Installation

Installation Clearance
8/53 SOFAR SAR-100
Device Installation

Installation Steps
1. Select a right (fi rm & fl at) place to install the device;
2. Determine the drilling hole positions according to hangers;
320mm
ºPP
360mm
3. Fix the device using expansion screws.
Installation and User Manual 9/53
Device Installation

6.3 Internal Structure
No. Name Description
1 Circuit Breaker Protect system and maintenance power outage
2 Meter 1 Monitor grid side power
3 Power Provide DC power for relay and DIN-Rail logger
4 Repeaters Improve RS485 link communication stability
5 DIN-Rail Logger Collect and upload meter and inverter data for feed-in limitation
6 Meter 2 Monitor power at generation side
10/53 SOFAR SAR-100
Device Installation

6.4 Device Wiring
CAUTION
eAll electrical installations must be in accordance with local electrical stan-
dards and permission must be obtained from the local electricity authori-
ty before the SAR-100 can be connected to the grid by a professional.
eWhen replacing components, ensure that the new replacement compo-
nents meet the trial requirements of the SAR-100.
eEnsure that the AC input voltage and current match the rated voltage
and current, otherwise the components will be damaged or will not work
properly.
eAppropriate ESD measures should be taken
ePlease ensure that the following wiring is carried out with the SAR-100
powered off.
:LUH6SHFLᚏFDWLRQDQG:LUH3UHVVLQJ
᧪9ROWDJHOLQH
Serial number Description Numerical value
A Outer diameter of wire Less than 13mm
B Cross-ional area of wirsecte recommend1~3mm²
C Conductor length DERXWPP᧤PPIRU3(᧥
D Bare copper wire length aPPaPPIRU3(
Installation and User Manual 11/53
Device Installation

᧪&7OLQH
Serial number Description Numerical value
A Outer diameter of wire Less than 3mm
B Cross-sectional area of wire Recommend 0.35~1.3mm²
C Conductor length About 45mm
D Bare copper wire length About 5mm
᧪56OLQH
RS485 communication cables are recommended to use Shielded twisted pair
cable with a conductor cross-sectional area of ≤ 2mm².
6.4.2 Device Hole Diagram
It is recommended to thread according to the diagram, in case of twining and
dislocation which might cause transmitting interference of RS485 communica-
tion and antenna (As shown in the picture below).
12/53 SOFAR SAR-100
Device Installation

6.4.3 Connect to Inverter
The max. number of inverters that SAR-100 can connect to is 10. The A/B of the
inverter RS485 line is connected to the A/B position in SAR-100(As shown in
the picture below).
Baud rate for all inverters: 9600.
A is RS485+ and B is RS485-. If the RS485 link communication is abnormal,
please connect a 120Ω resistor between A and B point of the last inverter.
MAX 10
RS485RS485RS485
A B
Inverter address settings:
1. M1 i.e. Meter 1 (Grid side) address: 001, M2 i.e. Meter 2 (Generation side)
address:100, which cannot be changed.
2. Inverter modbus address should be confi gured starting from 002, it is rec-
ommended to use continuous address as 002-011.
3. Please make sure inverter stand-alone feed-in limitation function: OFF.
Disable feed-in limitation at LCD screen according to SOFARSOLAR user
manual.
Installation and User Manual 13/53
Device Installation

6.4.4 Connect to CT and AC Line
As shown in the picture above, the CT corresponding to Meter 1 should be
installed on grid side. S1&S2 should be connected as the above picture shows.
The arrow of CT installation should be from grid to inverter.
The CT corresponding to Meter 2 should be installed on generation side. S1&S2
should be connected as the above picture shows. The arrow of CT installation
should be from inverter to grid.
• The length of voltage input connection line should be less than 100m.
And connect to phase line R ,S, T, N accordingly.
• Communication distance between CT and meter should be less than 10m.
• CT of Meter 1 should be selected according to the electricity consumption
capacity. CT of Meter 2 should be selected according to the plant capacity.
• When the power is ON, it is prohibited to open the secondary side of the
CT to prevent safety accidents and device damage.
14/53 SOFAR SAR-100
Device Installation

5HSODFH([WHUQDO$QWHQQD
WiFi network requires signal enhancement, an external antenna can be used.
The replacement method for external antennas is as follows.
1. Unscrew the original small antenna of DIN-Rail logger and install the exten-
sion antenna.(As shown in the picture below).
2. Thread the external antenna through the right-most waterproof joint, then
put the antenna bottom into the rubber hole and tighten waterproof joint
(As shown in the picture below).
(WKHUQHW&RQQHFWLRQ
If the networking method is a wired connection, connect the ethernet cable
(As shown in the picture below).
Installation and User Manual 15/53
Device Installation

16/53 SOFAR SAR-100
Device Installation
Other manuals for SAR-100
1
Table of contents
Popular Controllers manuals by other brands

Maple Systems
Maple Systems Graphic HMIs Information sheet

Newhaven Display International
Newhaven Display International NHD-FT81x-SHIELD user guide

Rockwell Automation
Rockwell Automation Allen-Bradley Micro820 user manual

BFT
BFT Magistro ROLL quick guide

American Meter Company
American Meter Company 1213B2 Series Operating instructions manual

ROBBE
ROBBE RO-CONTROL V2 Series user manual