
INSTALLATION INSTRUCTIONS
SAVE THESE INSTRUCTIONS
701 Millennium Boulevard Greenville, SC 29607 (864) 678-1000 www.spaulding-ltg.com
LED BOLLARD LIGHT FIXTURES
(FN1, FN2, TMS, TMR)
WARNING: DISCONNECT POWER BEFORE INSTALLATION OR SERVICING
READ INSTRUCIONS CAREFULLY - FAILURE TO DO SO COULD RESULT IN PERSONAL
INJURY. RETAIN INSTRUCTIONS FOR SERVICING.
FIXTURE INSTALLATION
1. UNPACK LUMINAIRE AND CHECK FOR DAMAGE.
2. PLACE BASE OVER PRESET ANCHOR BOLTS. BOLT PROJECTION
ABOVE CONCRETE TO BE 2.00" MIN. TO 2.50" MAX.
USE FLAT WASHERS AND HEX NUTS BOTH BELOW AND
ABOVE THE BASE.
3. LEVEL THE TOP SURFACE OF THE BASE BY ADJUSTING
THE BOTTOM LEVELING NUTS.
4. GROUT AT BOTTOM OF BASE AFTER LEVELING. DO NOT BLOCK
ANY OPENINGS IN BASE USED FOR VENTILATION. TIGHTEN
UPPER NUTS.
5. MAKE WIRING CONNECTIONS.
6. PLACE FIXTURE DOWN OVER BASE, LINING UP THREADED HOLES
IN BASE WITH COUNTERSUNK HOLES IN FIXTURE HOUSING.
- LED LIGHT ARRAY CAN BE ADJUSTED BY LOOSENING THREE
MOUNTING SCREWS
- ONCE LED LIGHT ARRAY IS POINTING IN THE DESIRED DIRECTION
TIGHTEN MOUNTING SCREWS
BEFORE ENERGIZING LED MAKE CERTAIN THAT:
- LINE VOLTAGE CORRESPONDS TO BALLAST
- LED LIGHT ARRAY IS POINTING IN DESIRED DIRECTION.
LED RELAMPING INSTRUCTIONS
1. REMOVE CAP BY LOOSENING ALLEN SOCKET SCREW AND SEALING
WASHER.
2. DISCONNECT LED LEADS FROM BALLAST.
3. REPLACE LED BOARDS BY REMOVING TWO MOUNTING SCREWS
FROM EACH BRACKET
4. REVERSE ABOVE PROCEDURE TO RE-ASSEMBLE FIXTURE BEING
SURE SEALING WASHER IS ON SCREW.
NOTE: HEAD OF SCREW WILL NOT BE FLUSH WITH TOP OF HOUSING
DUE TO SEALING WASHER. DO NOT OVERTIGHTEN TOP ALLEN HEAD
SOCKET SCREW.
B
D
C
93062553_A
05/07/2015
B 3X
C 2X
D
2.00"/2.50"
LEVELING
NUTS
CONCRETE
BASE
OPENING IN BASE
FOR VENTILATION