Spike Systems PBG Series User guide

Spike&Systems:&PBG&System&Family&Installation&
!
!
!
!
!
!
!
!
!
!
!
PBG$100/120/140/160+
SYSTEM+MANUAL+
Automated+Motorized+Hydraulic+Traffic+Controller+
!
Spike+Systems+
3623!S.!Seventh!Street!
Phoenix,!Arizona!85040!
Phone:&(602)&243=0291&
Fax:&(602)&243=0294&
!
!

Spike&Systems:&PBG&System&Family&Installation&
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
This%manual%describes%the%operational%requirements%of%the%
PBG%Hydraulic%Traffic%Control%System%
as%it%is%normally%configured%on%site.%
!

!
!
i+
Table+of+Contents+
Section+1+$+Pre$Installation+Planning+and+Considerations ........................................ 1!
1.1+WARNINGS+AND+NOTICES ....................................................................................................... 1!
1.2+Product+Model+Numbers ......................................................................................................... 2!
1.3+Product+Family+Description+and+Specifications .............................................................. 2!
1.4+Right+or+Left+Side+Configuration ........................................................................................... 3!
1.5+Spike+Systems+Plate+Barrier+Gate+(PBG)+Product+Family+Overview......................... 4!
1.5.1!PBG<100!As!Installed!and!Dimensions!for!Installation!Planning....................................4!
1.5.1!PBG!System!Family!Parts!Identification!and!Shipping!Contents.....................................5!
1.6+Configuration+Options+of+the+PBG+Family.......................................................................... 6!
1.6.1!Standard!Layout!(Universal)...........................................................................................................6!
1.6.2!Sample!PBG<100!Layout....................................................................................................................7!
1.6.3!Sample!PBG<120!RH!and!LH!Layout ............................................................................................8!
1.6.4!Sample!PBG<160!RH!and!LH!Layout ......................................................................................... 10!
1.6.5!Sample!PBG<100!Special!Layouts............................................................................................... 11!
Section+2+–+Physical+Installation.......................................................................................15!
2.1+Installation+Planning..............................................................................................................15!
2.2+Installation+Preparation:+System+Unpacking .................................................................15!
2.3+Plate+Barrier+Gate+Component+Weights...........................................................................16!
2.4+Plate+Barrier+Gate+(PBG)+System+Installation ................................................................16!
2.5+Pre$Installation:+Ensure+Power+and+Data+Conduits+are+in+Place .............................18!
2.6+Pre$Installation+Considerations:+Inductive+Loop+Vehicle+Detector........................18!
2.7+Saw+Cut+Inductive+Loop+Vehicle+Detector+as+Preparation+for+Installation...........19!
2.8+Plate+and+Cabinet+Placement+and+Preparation+(Left+Hand+Shown)........................21!
2.8.1!Position!the!Control!Cabinet!Close!to!the!and!Plate!Barrier .......................................... 24!
2.8.2!Position!the!Non<Control!Cabinet!Close!to!the!Plate!Barrier......................................... 25!
2.8.3!Hydraulic!Cylinder!Installation!to!Barrier!Plate.................................................................. 26!
Section+3+–+Hydraulic,+Electrical,+and+Control+Installation ...............................................27!
3.1+Hydraulic+Hose+Installation .................................................................................................27!
3.2+Installation+of+Concrete+Anchors........................................................................................33!
3.2.1!System!View!Prior!to!Anchor!Installation.............................................................................. 33!
3.2.2!Anchor!Bolt!Installation ................................................................................................................. 34!
3.3+Verify+Proper+Alignment+of+Upper+Limit+Switch+within+Control+Cabinet .............37!
3.4+Replace+Inside+Panels+for+Control+and+Non$Control+Cabinets ..................................39!
3.5+AC+Power+Connection .............................................................................................................39!
3.6+Traffic+Control+Signal+Mounting .........................................................................................41!
3.6.1!Wiring!for!Traffic!Control!Signal ................................................................................................ 42!
3.7+Wiring+for+Remote+Operating+Switch+(Guard+Shack,+Typically) ..............................43!
3.8+Installation+Electrical+Reference+Information...............................................................46!
Section+4+$+System+Operation+and+Maintenance..........................................................61!
4.1+Barrier+Gate+Manual+Operation ..........................................................................................61!
4.2+Barrier+Gate+Emergency+Operation:+Manual+Gate+Lowering ....................................61!
4.3+Important+Hydraulic+Power+Unit+(Pump)+Information ..............................................62!
4.3.1!Observations!and!Recommendations ...................................................................................... 62!
4.3.2!Seal!Kits!and!Components............................................................................................................. 62!
4.3.3!Hydraulic!Hose!Connections ........................................................................................................ 63!
4.3.4!Pump!Adjustments ........................................................................................................................... 63!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
ii"
4.3.5!On<Going!Maintenance!Tasks:!Hydraulic!Pump .................................................................. 64!
4.4+Possible+Field+Repair+Tasks .................................................................................................64!
4.4.1!Plate!Replacement ............................................................................................................................ 64!
4.4.2!Clevis!Installation,!Non<Control!Cabinet................................................................................. 66!
4.4.3!Clevis!Installation,!Control!Cabinet........................................................................................... 67!
4.4.4!Hydraulic!Cylinder!Installation,!Control!and!Non<Control!Cabinet ............................ 68!
4.5+Maintenance+Reference+Information................................................................................69!
Appendix+A+$+Warranty........................................................................................................75!
Appendix+B+–+Optional+Inductive+Loop+Vehicle+Detector+Installation .................77!
B.1+Inductive+Loop+Vehicle+Detector+(Saw+Cut+Control+Loop)+General+Guidelines...77!
B.2+Inductive+Loop+Vehicle+Detector+(Saw+Cut+Control+Loop)+Relay+Connection......78!
Appendix+C+$+General+Safety...............................................................................................81!
C.1+General+Safety+Considerations............................................................................................81!
C.2+Safety+Signs ................................................................................................................................81!
!
Figures+
Figure!1!<<!PBG<100!As!Installed!and!Dimensions!for!Installation!Planning ...................4!
Figure!2!–!PBG!Product!Family!Major!Component!Identification.........................................5!
Figure!3!–!PBG<120!Universal!Layout!and!Configuration.........................................................6!
Figure!4!–!PBG<100!RH!DB!(Right!Handed,!Double!Buttress) ................................................7!
Figure!5!<<!PBG<120!LH!DB!(Left!Handed,!Double!Buttress)...................................................8!
Figure!6!<<!PBG<120!RH!DB!(Right!Handed,!Double!Buttress) ...............................................8!
Figure!7!<<!PBG<120!RH!DB!(Right!Handed,!Double!Buttress) ...............................................9!
Figure!8!<<!PBG<160!LH!DB!(Left!Handed,!Double!Buttress)................................................ 10!
Figure!9!<<!PBG<100!LH!SB!(Left!Handed,!Single!Buttress)...................................................11!
Figure!10!<<!PBG<100!LH<RH!DB!(Left!&!Right!Handed,!Double!Buttress) ....................12!
Figure!11!!<<!PBG<100!LH<RH!DB!(Left!&!Right!Handed,!Double!Buttress) ...................13!
Figure!12!<<!Control!and!Non<Control!Cabinets!Secured!to!Shipping!Pallet..................15!
Figure!13!–!Inner!Panel!Removal!from!Control!and!Non<Control!Cabinets ..................17!
Figure!14!–!Temporary!Placement!of!Control!Cabinet!to!Mark!Location!of..................19!
Figure!15!–!Inductive!Loop!Vehicle!Detector!(Saw!Cut!Loop)!Beneath!Cabinet .........20!
Figure!16!–!Placement!of!the!Plate!on!the!Ground,!Propped!Up ........................................21!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
iii"
Figure!17!–!Wood!Blocks!Used!Under!the!Plate,!3!Locations!(1!of!3)..............................22!
Figure!18!–!Wood!Blocks!Used!Under!the!Plate,!3!Locations!(2!of!3)..............................22!
!Figure!19!–!Wood!Blocks!Used!Under!the!Plate,!3!Locations!(3!of!3).............................23!
Figure!20!<<!Locate!Control!Cabinet!near!the!Plate!and!Hinge!for!Installation............24!
Figure!21!–!Placement!of!Control!Cabinet!Relative!to!Client!Installed!Conduit ..........24!
Figure!22!<<!Locate!Non<Control!Cabinet!near!the!Plate!and!Hinge!for!Installation.. 25!
Figure!23!<<!Secure!Hydraulic!Cylinder!to!Plate,!2!sides........................................................26!
Figure!24!<<!Hardware!for!Mounting!Hydraulic!Cylinders....................................................26!
Figure!25!!–!Hydraulic!Hose!Location,!As!Shipped,!Inside!Control!Cabinet ..................27!
Figure!26!!–!Two!Hoses!Routed!Through!Track!to!Non<Control!Cabinet.......................28!
Figure!27!–!Pulling!Two!Hydraulic!Hoses!Through!PBG!Control!Cabinet......................28!
Figure!28!!–!Two!Hoses!Routed!to!Non<Control!Cabinet .......................................................29!
Figure!29!–!Placing!Track!in!Position!Above!Hoses. ................................................................29!
Figure!30!!–!Minor!Positional!Adjustments .................................................................................30!
Figure!31!!–!Hydraulic!Hose!Connection,!Non<Control!Cabinet.......................................... 31!
Figure!32!!–!Hydraulic!Hose!Connection,!Control!Cabinet....................................................32!
Figure!33!!–!Hydraulic!Hose!Connection,!Non<Control!Cabinet.......................................... 32!
Figure!34!<<!System!View!Prior!to!Anchor!Installation...........................................................33!
Figure!35!!–!Adjust!Cabinet!Locations!to!Ensure!½”!Gap!between!Plate!and!Cabinets
.........................................................................................................................................................................34!
Figure!36!!–!Hilti!Concrete!Anchor!Bolt!(4”!x!5/8”) .................................................................34!
Figure!37!–!Drilling!Pilot!Holes!for!Concrete!Anchors............................................................35!
Figure!38!!–!Cleaning!Pilot!Holes!After!Drilling .........................................................................36!
Figure!39!–!Secure!Anchors!with!Wrench!for!Final!Attachment........................................36!
Figure!40!!–!View!of!Upper!and!Lower!Limit!Switches,!Control!Cabinet........................37!
Figure!41!!–!Location!of!Upper!Limit!Switch,!Control!Cabinet ............................................38!
Figure!42!!–!Location!of!Lower!Limit!Switch,!Control!Cabinet,!Reference!Only.......... 38!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
iv"
Figure!43!!–!Replacement!of!Inner!Panels!Control!and!Non<Control!Cabinets ............ 39!
Figure!44!!–!AC!Power!Junction!Box!Inside!Control!Cabinet................................................ 40!
Figure!45!!–!Location!of!Flexible!Conduit!Installation!to!AC!Junction!Box..................... 41!
Figure!46!!–!Traffic!Control!Lighting!Installation!Guidelines...............................................41!
Figure!47!!–!Location!of!Traffic!Control!Mounting!Adapter,!Control!Cabinet............... 42!
Figure!48!!<<!Assembled!Traffic!Control!Mounting!Adapter,!Control!Cabinet ....................42!
Figure!49!!–!Traffic!Control!Signal!Wiring....................................................................................43!
Figure!50!!–!Installation!Location!of!Field!Connection!Barrier!Operator.......................44!
Figure!51!!–!Limit!Switch!Wiring!(Usually!Performed!at!Factory)....................................45!
Figure!52!!–!Electronic!Control!Panel!Components,!Control!Cabinet...............................46!
Figure!53!!–!Siemens!S7<1200!PLC,!Control!Cabinet!<<!With!(Top)!and!Without!
(Bottom)!Covers!Removed..................................................................................................................47!
Figure!54!!–!Siemens!PLC!Wiring!Scheme ....................................................................................48!
Figure!55!!–!Schneider!LC1!D25!Relay,!Control!Cabinet ........................................................49!
Figure!56!!–!TB!1!Terminal!Block,!Installation!Wiring,!Control!Cabinet......................... 50!
Figure!57!!–!TB!1!Terminal!Block,!Factory!Wiring,!Control!Cabinet.................................51!
Figure!58!!–!TB!2!Terminal!Block,!Factory!Wiring,!Control!Cabinet.................................52!
Figure!59!!–!TB!2!Terminal!Block,!Installation!Wiring,!Control!Cabinet.........................53!
Figure!60!!–!Momentary!On/Off!Operation!Switch,!Wired!at!Factory,!Control!Cabinet
.........................................................................................................................................................................54!
Figure!61!!–!Momentary!Switch!in!OFF!or!Neutral!Position.................................................55!
Figure!62!!–!Momentary!Switch!in!Up!(Raise)!Gate!or!Barrier!Plate................................ 55!
Figure!63!!–!Momentary!Switch!for!DOWN!or!Lower!Gate!or!Barrier!Plate ................. 55!
Figure!64!!–!Left!Side!Electrical!Schematic,!Control!Cabinet................................................56!
Figure!65!!–!Right!Side!Electrical!Schematic,!Control!Cabinet............................................. 57!
Figure!66!!–!Entire!Electrical!Schematic,!Control!Cabinet.....................................................58!
Figure!67!!–!Motor/Pump!and!Fluid!Reservoir,!Control!Cabinet .......................................59!
Figure!68!!–!Manual!Operating!Switch!Location........................................................................61!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
v"
Figure!69!!–!Manual!Gate!Lowering!in!Case!of!Power!Loss!or!Other!Unusual!Event.62!
Figure!70!!–!Replacing!a!Damaged!Plate!to!a!Non<Damaged!Hinge!Assembly .............65!
Figure!71!!–!Clevis!Installation,!Non<Control!Cabinet .............................................................66!
Figure!72!!–!Clevis!Installation,!Control!Cabinet .......................................................................67!
Figure!73!!–!Hydraulic!Cylinder!Installation,!Control!Cabinet............................................. 68!
Figure!74!!–!Hydraulic!Cylinder!Installation,!Non<Control!Cabinet ..................................68!
Figure!75!!–!Installation!Location!of!Optional!Inductive!Vehicle!Detection!Module .78!
Figure!76!!–!Typical!Inductive!Vehicle!Detection!Module!(Saw!Cut!Control)...............79!
Figure!77!!–!Wiring!of!Optional!Inductive!Vehicle!Detection!Module..............................80!
!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
vi"

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
1"
Section+1+$+Pre$Installation+Planning+and+Considerations+
1.1+WARNINGS+AND+NOTICES+
The!Spike!Systems!Hydraulic!Plate!Barrier!Gate!(PBG)!is!designed!to!regulate!the!flow!of!
traffic!through!a!secure!control!point.!!The!PBG!is!also!designed!and!manufactured!to!
ensure!personnel!safety!when!the!equipment!is!operated!properly!and!all!safety!
precautions!are!strictly!followed.!
Persons!responsible!for!the!operation!and!field!maintenance!of!the!sytem!should!read!this!
manual!carefully!before!attempting!to!operate!the!equipment!or!perform!any!service!or!
adjustment!procedures.!
The!Warnings,!Cautions,!and!Notes!in!this!manual!represent!the!following!information:!
•A!WARNING!is!an!operation,!procedure!or!condition!that!can!cause!injury!or!death.!
•A!CAUTION!is!an!operation,!procedure!or!condition!that!can!cause!damage!to!the!
equipment.!
•A!NOTE!provides!helpful!information.!
The!warnings!and!cautions!that!follow!apply!to!all!parts!of!this!manual.!
WARNING: !"#$%#&'(()*(&+$,#-.$'#$%&%/*-'0'.12*3')*$4&2#*15.&%/*
$65&!3$%#*"!$.'#&"%7**"%()*65'(&+&$1*!$.2"%%$(*2-"5(1*'##$3!#*
#"*"!$.'#$8*2$.9&:$*".*3';$*'1<52#3$%#2*#"*#-$*-)1.'5(&:*
#.'++&:*:"%#."(*2)2#$3*$65&!3$%#7*
WARNING: +"(("=*#-$*!.$:'5#&"%'.)*&%2#.5:#&"%2*$4':#()7**1"*%"#*#';$*
2-".#:5#27**1"*%"#*'2253$*#-'#*2"3$"%$*$(2$*-'2*':#$1*"%*)"5.*
>$-'(+7**&+*'%)*.5($*".*!.$:'5#&"%*&2*%"#*:($'.*#"*)"58*2$$*)"5.*
25!$.9&2".*>$+".$*52&%/*#-$*3':-&%$7*
WARNING: #-&2*5%&#*:"%#'&%2*'*#-$.3'(()*+52$1*$($:#.&:*3"#".7**&+*#-$*
3"#".*2#"!28*1"*%"#*'2253$*!"=$.*&2*%"#*!.$2$%#7**5%$4!$:#$1*
3"#".*2#'.#,5!*&2*!"22&>($*'+#$.*#-$*!."#$:#".*#.&!27**1&2:"%%$:#*
!"=$.*+."3*:&.:5&#*>$+".$*!$.+".3&%/*'%)*2$.9&:$*#"*#-$*
3"#".7**=-$%*!"=$.*&2*.$:"%%$:#$18*.$2$#*!."#$:#".*>$+".$*
':#&9'#&%/*2)2#$37*
WARNING: #"*'9"&1*!$.2"%'(*&%<5.)8*>$*'='.$*#-'#*9"(#'/$2*'.$*!.$2$%#*&%*
#-$*-)1.'5(&:*#.'++&:*:"%#."(*2)2#$37**9"(#'/$2*'2*("=*'2*?@*
9"(#2*:'%*:'52$*2$.&"52*&%<5.)*5%1$.*2"3$*:"%1&#&"%27**1"*%"#*
>$*3&2($1*>)*#-$*#$.3*("=*9"(#'/$7*
NOTE: Spike!Systems!assumes!no!liability!for!accident!or!injury!incurred!through!improper!
installation,!operation,!maintenance!and!use!of!this!equipment.!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
2"
1.2+Product+Model+Numbers+
!
The!PBGQ100/120/140!and!/160!are!available!with!clear!widths!of!10,!12,!14,!and!16!feet,!
respectively,!as!shown!in!the!table!below.!!
Model!Number!
Guide!
Spike!PBG!!
System!
Orientation!
Buttress!
Options!
Clear!!
Width!
!
PBGQ100!
RH!or!LH!
SB!or!DB!
10’!
!
PBGQ120!
RH!or!LH!
DB!
12’!
!
PBGQ140!
RH!or!LH!
DB!
14’!
!
PBGQ160!
RH!or!LH!
DB!
16’!
*
(ABACD*
.-!Right!Handed!(placement!of!Control!Cabinet!as!you!drive!toward!the!PBG!system.)!
(-!Left!Handed!(placement!of!Control!Cabinet!as!you!drive!toward!the!PBG!system.)!
2>!Single!Buttress!(One!or!two!Control!Cabinets!and!no!NonQControl!Cabinet).!The!
PBGQ100!can!be!configured!with!a!Control!Cabinet!on!the!right!or!left!side,!with!NO!
NonQControl!Cabinet.!Also,!two!PBGQ100!systems!can!be!combined!with!a!Control!
Cabinet!on!each!side!(and!no!NonQControl!Cabinets)!for!a!total!Clear!Width!of!20’.!
When!this!configuration!is!used,!there!can!be!up!to!a!fourQfoot!gap!between!
systems!for!a!total!Clear!Width!of!24’.!
1>!! Double!Buttress!(One!Control!Cabinet,!one!NonQControl!Cabinet).!!
!
1.3+Product+Family+Description+and+Specifications+
!
The!PBG!family!is!an!automated!hydraulic!Plate!Barrier!Gate!that!is!surface!mounted.!The!
product!line!is!designed!primarily!to!prevent!against!unauthorized!vehicles!from!either!
entering!or!exiting!a!secured!control!point.!Using!hydraulic!and!solid!state!components,!
and!with!it’s!customizable!control!logic,!it!can!easily!be!adapted!to!variety!of!uses,!for!
example,!revenue!control,!rental!car!agency,!security!checkpoints,!and!others.!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
3"
!
Cycle!to!lower!barrier!3!seconds!
"EAFGHICB*#IJAK*
Cycle!to!raise!barrier!3!seconds!
1FILA*:MCNIBOFGHIMCK*
Automated!hydraulic!control!power!unit,!with!tieQrod!
Hydraulic!Cylinders!
!MPAF*.AQOIFAJACHRK*
1Q1/2!HP,!110V!SingleQphase!12A.!The!unit!can!be!built!to!
meet!any!local!power!requirement!as!to!voltage,!
frequency!and!phase*
+ICIRSK*!
Powder!Coat:!Red!or!Yellow!standard.*
:MCHFMT*:IFUOIHK*
The!system!is!completely!preQwired!requiring!only!the!
connection!of!the!power!feed!and!the!control!circuits.!The!
circuits!and!power!connections!are!terminated!at!the!wire!
connector!strips!in!the!electrical!control!box!located!in!the!
locked!hydraulic!Control!Cabinet.!The!controls!are!preQ
wired!to!accommodate!a!wide!range!of!control!options!
including:!remote!open!and!close!from!multiple!locations;!
radio!open!and!close;!open!by!card!reader,!guard!shack,!
key!switch!or!vehicle!detector*
"EHIMCRK*
Radio!ReceiverQRemote!Radio!Control,!High!Security!Card!
Readers,!Key!Lock!Switch,!Directional!Indication!System*
+
1.4+Right+or+Left+Side+Configuration+
!
All!PBG!system!configurations!are!shipped!from!the!factory!as!either!a!right!or!left!hand!
control,!depending!on!the!specific!installation!requirements.!For!the!purposes!of!this!
manual,!all!drawings!depict!a!left!hand!control.!However,!all!installation!steps!are!the!same!
regardless!of!orientation!of!the!Barrier!Gate!and!control.!
Spike!PBG!systems!ship!to!the!installation!location!with!all!possible!assembly!and!
installation!steps!preQperformed!by!the!factory.!Each!system!is!specifically!configured!to!
match!and!address!each!sales!order!prior!to!shipment!to!the!installation!location.!
The!client!is!responsible!for!running!necessary!power!to!the!installation!location(s)!with!
separate!conduit!for!low!voltage!controls.!These!controls!often!connect!between!the!
Control!Cabinet!and!a!guard!shack,!but!optionally!can!also!attach!to!card!readers!and!other!
optional!system!inputs.!Prior!to!commencing!any!installation!steps,!the!installer!should!
ensure!that!all!power!and!data!connections!have!been!properly!installed,!connected!and!
configured.!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
4"
1.5+Spike+Systems+Plate+Barrier+Gate+(PBG)+Product+Family+Overview+
1.5.1"PBG-100"As"Installed"and"Dimensions"for"Installation"Planning"
!
Figure 1 -- PBG-100 As Installed and Dimensions for Installation Planning
!
PBGQ100!
Clear!Width!
Plate!Width!
System!
Width!
Slab!
Width!
Depth!
!
!
10’!(120”)!
!
11’!
!
13’!
!
14’!
!
50”!
!
PBGQ120!
Clear!Width!
Plate!Width!
Overall!
Width!
Slab!
Width!
Depth!
!
!
12’!(144”)!
!
!
13’!
!
15’!
!
16’!
!
50”!
!
PBGQ140!
Clear!Width!
Plate!Width!
Overall!
Width!
Slab!
Width!
Depth!
!
!
14’!(168”)!
!
!
15’!
!
17’!
!
18’!
!
50”!
!
PBGQ160!
Clear!Width!
Plate!Width!!
Overall!
Width!
Slab!
Width!
Depth!
!
!
16’!(192”)!
!
!
17’!
!
!
19’!
!
!
20’!
!
!
50”!
!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
5"
1.5.1"PBG"System"Family"Parts"Identification"and"Shipping"Contents"
!
Figure 2 – PBG Product Family Major Component Identification
+
Shipped+Components+Not+Pictured+
•Clevises!and!associated!attachment!hardware!for!hydraulic!cylinders.!Two!
hydraulic!cylinders,!one!each!are!preQinstalled!to!mounted!clevis!hardware!
on!the!inside!of!the!Control!Cabinet!and!one!to!the!clevis!on!the!inside!of!
the!NonQControl!Cabinet.!The!lower!ends!of!hydraulic!cylinders!are!to!be!
attached!to!welded!clevis!assemblies!on!the!Plate!Barrier!
•Two!rubber!hydraulic!hoses,!rolled!and!stored!in!the!Control!Cabinet!
•Standard!and!optional!safety!signs!
•PreQturned!wires!for!Inductive!Control!Loops!and!electronic!unit!to!be!
installed!on!TBQ1!within!Control!Cabinet!
•Traffic!Control!lighting!and!associated!installation!equipment!
•LowerQcost!traffic!barrier!assembly!(option)!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
6"
1.6+Configuration+Options+of+the+PBG+Family+
1.6.1"Standard"Layout"(Universal)"
!
Figure 3 – PBG-120 Universal Layout and Configuration
!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
7"
1.6.2"Sample"PBG-100"Layout"
!
!
!
Figure 4 – PBG-100 RH DB (Right Handed, Double Buttress)
!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
8"
1.6.3"Sample"PBG-120"RH"and"LH"Layout"
!
!
!
Figure 5 -- PBG-120 LH DB (Left Handed, Double Buttress)
!
!
!
Figure 6 -- PBG-120 RH DB (Right Handed, Double Buttress)
!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
9"
!
!
Figure 7 -- PBG-120 RH DB (Right Handed, Double Buttress)
!
!
!!
!
"
"

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
10"
1.6.4"Sample"PBG-160"RH"and"LH"Layout"
!
+
Figure 8 -- PBG-160 LH DB (Left Handed, Double Buttress)
!

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
11"
1.6.5"Sample"PBG-100"Special"Layouts"
+
+
Figure 9 -- PBG-100 LH SB (Left Handed, Single Buttress)
+
+
+

Spike&Systems:&PBG&System&Family&Installation&
! ! ! !
12"
+
+
Figure 10 -- PBG-100 LH-RH DB (Left & Right Handed, Double Buttress)
+
This manual suits for next models
4
Table of contents