
IM-P372-27 CTLS Issue 2
2
LSB31, LSB32, LSB33, LSB34, LSB71, LSB72, LSB73 and LSB74 Limit Switch Boxes for BVA300 Series Actuators
Safe operation of this product can only be guaranteed if it is properly installed, commissioned,
used and maintained by qualified personnel (see Section 1.11) in compliance with the operating
instructions. General installation and safety instructions for pipeline and plant construction, as
well as the proper use of tools and safety equipment must also be complied with.
Isolate the mains supply before carrying out any work on the switch box.
1.1 Intended use
Referring to the Installation and Maintenance Instructions, name-plate and Technical Information
Sheet, check that the product is suitable for the intended use / application. These products comply
with the requirements of the Pressure Equipment Directive (PED) and carry the mark when
so required.
i) Verify the limit switch box name plate to insure the respective unit has the correct mechanical,
inductive or pneumatic sensors. This is important as different switch boxes have different
internals.
ii) Check material suitability, pressure and temperature and their maximum and minimum values.
If the maximum operating limits of the product are lower than those of the system in which it
is being fitted, or if malfunction of the product could result in a dangerous overpressure or
overtemperature occurrence, ensure a safety device is included in the system to prevent such
over-limit situations.
iii) Spirax Sarco products are not intended to withstand external stresses that may be induced by
any system to which they are fitted. It is the responsibility of the installer to consider these
stresses and take adequate precautions to minimise them.
iv) Remove protection covers from all connections and protective film from all name-plates, where
appropriate, before installation on steam or other high temperature applications.
1.2 Access
Ensure safe access and if necessary a safe working platform (suitably guarded) before attempting
to work on the product. Arrange suitable lifting gear if required
1.3 Lighting
Ensure adequate lighting, particularly where detailed or intricate work is required.
1.4 Hazardous liquids or gases in the pipeline
Consider what is in the pipeline or what may have been in the pipeline at some previous time.
Consider: flammable materials, substances hazardous to health, extremes of temperature.
1.5 Hazardous environment around the product
Consider: explosion risk areas, lack of oxygen (e.g. tanks, pits), dangerous gases, extremes of
temperature, hot surfaces, fire hazard (e.g. during welding), excessive noise, moving machinery.
1. Safety information