
Installation and operation manual
8 Technical changes reserved
6.2. “U” under-ceiling suspension
The door curtain is suspended in four
suspension points on the curtain casing. The
suspension points are accessible from outside
and rivet nuts (M10 threads) are installed on
the curtain from production plant.
Upon special purchase order, the following is
supplied as accessories to the U under-ceiling
suspensions:
1 pc cover, 2 pcs outer casing, 2 pcs inner
casing, 2 pcs foot, 4 pcs M10x1000 threaded
rod, 4 pcs M10/40 anchor, 4 pcs left-right M10
suspension sleeve, 4 pcs left-right M10 bolt, 8
pcs M10 nuts, 30 pcs 4.8x13 metal sheet screw.
Measure the position of the curtain and its
distance from the ceiling, and cut the threaded
bars to required length. Mark the anchoring
points according to drilling scheme (refer to figure) and drill the ceiling holes for installation of anchors. Fit the threaded rods into
the prepared ceiling anchors and rotate the nuts. First, attach left-right bolt into the curtain, fasten with nuts, and rotate left-right
suspension sleeves on the bolt. Please start with the suspension. Slide the outer casing into the inner casing and screw the food
on the inner casing using metal sheet screws. Combine the assembles using the cover, fit in the air curtain, and screw the screws
in the metal sheet. Then, set the air curtain into the required position and tighten up the suspension sleeve to the threaded bars
until the required connection is made, then secure the sleeve with the nuts. Slide out the suspension inner casing up to height
required and fasten the screws in the metal sheet.
Pay attention to correct fitting of all nuts to all assembly components. Pay attention to the end position of the threads to avoid
loosening and falling the curtain by rotation.
6.3. “S” under-ceiling suspension
The door curtain is suspended in four
suspension points on the curtain casing. The
suspension points are accessible from outside
and rivet nuts (M10 threads) are installed on
the curtain from production plant. The “S”
under-ceiling suspension is fitted in five
suspension points.
Upon special purchase order, the following is
supplied as accessories to the S under-ceiling
suspensions:
1 pc runner, 2 pcs runner lid, 1 pc central inner
suspension, 1 central outer suspension, 1 pc
suspension lid, 5 pcs M10x1000 threaded rod, 5
pcs M10/40 anchor, 5 pcs left-right M10
suspension casing, 5 pcs left-right M10 bolt, 10
pcs M10 nuts, 4 pcs Allen M10x30 bolt, 20 pcs
Allen FL M5x12 bolt, 4 pcs M5 nuts, 4 pcs washer size 10, 4 pcs spring washers size 10.
Measure the position of the curtain and its distance from the ceiling, and cut the threaded bars to required length. Mark the
anchoring points according to drilling scheme (refer to figure) and drill the ceiling holes for installation of anchors. Fit the threaded
rods into the prepared ceiling anchors and rotate the nuts. Start with the under-ceiling suspension. Slide the central inner
suspension to the central outer suspension and place it on the runner to the points where the riveting nuts (M10 threads) are
located. Screw using the left-right bolts, fasten with nuts, and rotate left-right suspension sleeves on the bolt. Slide the under-
ceiling suspension onto the threaded rods and set to the required position. Tighten up the suspension sleeve to the threaded bars
until the required connection is made, then secure the sleeve with nuts. Then, place the air curtain under the suspension and
screw with M10 Allen bolts. Slide out the central inner suspension up to the required height and fasten with the bolts. Cover the
open points on the under-ceiling suspension with lids using M5 Allen bolts.