
01 02
• Check package contents against supplied parts and hardware list to assure that all
components were received undamaged. Do not use damaged or defective parts. lf you
require replacement parts, please contact amada customer service at
• Carefully read all instructions before attempting installation. If you do not understand the
instructions or have any concerns or questions, please contact customer service at
• Not all parts and hardware included will be used.
• Do not use this product for any purpose that is not explicitly specified in this manual. Do
not exceed weight capacity. We cannot be liable for damage or injury caused by improper
mounting, incorrect assembly or inappropriate use. Thank you for your understanding.
IMPORTANT SAFETY INFORMATION
Tools Needed (Not lncluded)
Stud Finder Pencil Screwdriver
Level Drill 5/64 in.(2mm)
Wood Drill
15/64 in.(6mm)
Concrete Drill
Supplied Parts and Hardware
Wall Anchor
M13x42mm
x8
F
CAUTION!
These wall anchors [F]
are for drywall ONLY.
DO NOT use them in
concrete / brick / wood
studs wall.
CAUTION!
These anchors are for
concrete or brick
walls ONLY. DO NOT
use them in drywall
or wood studs.
x8
G
Wall Anchor
M6x30mm
Hammer
Long Lag Screw
M4x50mm
(C) x8
Short Lag Screw
M4x30mm
(D) x8
Screw
M4x15mm
(E) x8
(A) x2 (B) x4
Step 1 Secure the Metal Brackets [B] to Wood Board [A]
Before installation, please identify your wall type.
For wood stud installation, follow the step 2A.
For drywall installation, follow the step 2B.
For solid concrete and concrete block walls installation, follow the step 2C
Step 2 Secure Floating Shelf to Wall
D
C
F
[Not Included]
(For wood stud only!)
[Optional]
2 in.(50mm)
For Screw [C]
ø5/64 in.(ø2mm)
Step 2A For Wood Stud
For wood stud mounting, wall
anchors [F] and [G] are not
necessary.
WARNING:
XX
F G
A
B
B
E