
VI
4.2.1 Installation Site Requirement ...............................................................24
4.2.2 Foundation Requirements....................................................................25
4.2.3 Installation Spacing Requirement .........................................................26
4.3 Hoisting and Fixing .......................................................................................27
4.3.1 Lifting Precautions ..............................................................................27
4.3.2 Lifting .................................................................................................28
4.3.3 Fixed Installation.................................................................................30
4.3.4 Film Removal......................................................................................32
5 Electrical Connection .....................................................................................34
5.1 Precautions..................................................................................................34
5.2 Overview of Wiring Area................................................................................34
5.3 Preparation Before Wiring .............................................................................36
5.3.1 Preparing Installation Tools ..................................................................36
5.3.2 Opening the Container Door and Cabinet Door......................................37
5.3.3 Preparing Cables ................................................................................38
5.3.4 Copper Wire Connection......................................................................39
5.3.5 Cable Entry Design .............................................................................39
5.4 Ground Connection ......................................................................................40
5.5 DC Output Port Connection ...........................................................................42
5.6 Auxiliary Power Supply Port Connection.........................................................42
5.7 Ethernet Communication Port Connection ......................................................44
5.8 Post-wiring Operations..................................................................................44
6 Battery Connection ........................................................................................46
6.1 Precautions..................................................................................................46
6.2 Cable Connection.........................................................................................47
7 Powering up and Shutdown ..........................................................................49
7.1 Power-on Operation......................................................................................49
7.1.1 Inspection Before Powering up.............................................................49
7.1.2 Powering on Steps ..............................................................................49
7.2 Shutdown ....................................................................................................50
7.2.1 Planned Powering off ..........................................................................50
7.2.2 Unplanned (Emergency) Shutdown ......................................................51
8 Fire Suppression ............................................................................................52
8.1 General Rules ..............................................................................................52
8.2 Fire Suppression Equipment .........................................................................52
8.3 Exhaust System ...........................................................................................53