SunSynk SUN-BATT-15.97 User manual

7 Abbey Square, Chester CH1 2HU, England.Address:
Product Description
SUN-BATT-15.97
Tell: +852-2884 4318 Fax: +852-2884 4816
Sunsynk UK Ltd.

CONTENTS
1
Technical Data 1-2
2
Product Overview 3
3
4
4
5
6
6
3 Installation Guide 7
7
7
7-8
9
9
9
9
10
10
10
11-14
4
Maintenance 15
15
16
2.1 Brief Introduction
2.2 Interface Introduction
2.2.1 Switch ON/OFF
2.2.2 LED Indicator Definition
2.2.3 CAN / RS485 Port
2.2.4 RS232 Port
3.1 Checking Before Installation
3.1.1 Checking Outer Packing Materials
3.1.2 Checking Deliverables
3.2 Tools
3.3 Installation requirements
3.3.1 Installation environment requirements
3.3.2 Installation carrier requirements
3.4 Installation Instructions
3.4.1 Dimensions
3.4.2 Installation Procedure
4.1 Recharge Requirements During Normal Storage
4.2 Recharge Requirements When Over Discharged

TECHNICAL DATA
01 02
Peormance
Communication
GeneralSpecication
OrderingandDeliverablePa
StandardCompliance
Nominal Voltage
Batte Energy
Charge Voltage
Discharge Voltage
Max Charge / Discharge Current
Max Charge / Discharge Power
Sho Circuit Current
Nominal Capacity
Nominal Charge/Discharge Current
Nominal Charge/Discharge Power
Display
Communication
Installation
Working Temperature
Storage Temperature
Max Operating Altitude
IP Rating
Cycle life
Scalability
Cell Technology
Weight (Kg)
Dimension( W×D×H mm )
Ceication
Product ordering pa
Operating / Storage / humidity
55.68~56.16Vdc
45.6-56.16 Vdc
51.2 Vdc
15970 Wh
312Ah
150A
7500W
300A
15000W
450A
SOC status indicator, LED indicator
CAN、RS485、RS232
Floor stand or Wall mounted
-20℃ ~ 60℃
≤25℃,12 months; ≤35℃,6 months; ≤45℃,3 months
6000 Cycles @ 80% DOD / 25℃ / 0.5C,
≤2000m
IP20
60% EOL
LiFePO
Max 8 batteries in parallel
4
SUN-BATT-15.97 Batte
SUN-BATT-15.97 Parallel cable
130kg
720×160×916mm
SUN-BATT-15.97 to PCS cable
≤ 95%RH
1. Test conditions: 100% depth of discharge (DoD), 0.2C rate charge & discharge at 25℃
2. Charge/discharge derating occurs when the operating temperature from -10℃ to 5 ℃.& 45 ℃ to 55 ℃.
3. Condition apply. Refer to SUN-BATT-15.97 Warranty Letter
1
2
3
PACK:UN38.3、IEC 62619、IEC61000
CELL:UN38.3、IEC62619、UL 1642、JET
(more available upon request)

PRODUCT OVERVIEW
2.1 Brief Introduction
SUN-BATT-15.97 is a lithium battery with an operating voltage range between
45.6~56.16V. It is designed for residential energy storage applications and works together
with a 48v battery hybrid inverter. SUN-BATT-15.97 is not suitable for supporting
life-sustaining medical devices.
SUN-BATT-15.97 has built-in BMS (Battery Management System), which can manage and
monitor cells information including voltage, current and temperature. Besides that, BMS can
balance cells charging to extend cycle life. BMS has protection functions including over-dis-
charge, over-charge, over-current and high/low temperature; the system can automatically
manage charge state, discharge state and balance state.
Multiple SUN-BATT-15.97 can be connected in parallel to expand capacity and power, 8
SUN-BATT-15.97 can be connected in parallel at most.
PRODUCT OVERVIEW
03 04
2.2 Interface Introduction
2.2.1 Switch ON/OFF
1. Switch ON
For single SUN-BATT-15.97, switch ON rocker switch (near positive/negative connector),
then long press (more than 3 seconds) ON/OFF button on front panel, LED will flash then
battery will operate normally. L1 to L6 shows battery SOC, L7/L8 shows battery status.
For multiple SUN-BATT-15.97 in parallel, switch ON rocker switch on all batteries, long press
(more than 3 seconds) ON/OFF button of MASTER battery, LED will flash, battery system
will automatically encode and assign ID to each slave battery, then battery system will
operate normally.

Note:
flash 1 - 0.25s light / 3.75s off
flash 2 - 0.5s light / 0.5s off
flash 3 - 0.5s light / 1.5s off
Charging Battery Level Indicators Instructions
LED Indicators Instructions
2.2.2 LED Indicator Definition
RUN ALM
L8 L7 L6 L5 L4 L3 L2 L1
OFF OFF OFF OFF OFF OFF OFF OFF All OFF
Flash 1 OFF Indicates Standby
Normal Light OFF The highest capacity indicator LED
flashes(flash 2),others lighting
Full Charged Light OFF Light Light Light Light Light Light Turn to standby status when charger off
Protection OFF Light OFF OFF OFF OFF OFF OFF Stop charging
Normal Flash 3 OFF
UVP OFF OFF OFF OFF OFF OFF OFF OFF Stop charging
Protection OFF Light OFF OFF OFF OFF OFF OFF Stop discharge
OFF Light OFF OFF OFF OFF OFF OFF Stop charging and Discharge
Battery Leve l Indicator
Des criptionsStatus
Fault
Discharge
According to the battery level
Shut down
Standby According to the battery level
Charging
According to the battery level
L8 L7 L6 L5 L4 L3 L2 L1
017% OFF OFF OFF OFF OFF Flash 2
18 33% OFF OFF OFF OFF Flash 2 Light
34 50% OFF OFF OFF Flash 2 Light Light
51 66% OFF OFF Flash 2 Light Light Light
67 83% OFF Flash 2 Light Light Light Light
84 100% Flash 2 Light Light Light Light Light
Full Charge d Light Light Light Light Light Light
Charging
Light OFF
Battery Level
%
Status
Battery Level Indicator
PIN
Pin 1、Pin 8
Pin 2、Pin 7
Pin 3
Pin 4
Pin 5
Pin 6
Definition
RS485-B ( to PCS, reserved )
RS485-A ( to PCS, reserved )
NC
CANH ( to PCS )
CANL ( to PCS )
GND
2.2.4 RS232 Port
PIN
Pin 1、Pin 8
Pin 2、Pin 7
Pin 3、Pin 6
Pin 4、Pin 5
Definition
GND
RS232_TX
RS232_RX
NC
RS232 Communication Terminal (RJ45 port) follow RS232 protocol,
for manufacturer or professional engineer to debug or service.
2. Switch OFF
Press start button of Master PACK more than 3s and then release the button, the master
pack will shut down after all slave packs shut down(Sleep mode) .
For single SUN-BATT-15.97, switch OFF rocker switch (near positive/negative connector).
For multiple SUN-BATT-15.97 in parallel, switch OFF rocker switch ofall slave batteries
first.Then switch OFF rocker switch ofMASTER battery.
Discharging Battery Level Indicators Instructions
2.2.3 CAN / RS485 Port
L8 L7 L6 L5 L4 L3 L2 L1
0 17% OFF OFF OFF OFF OFF Light
18 33% OFF OFF OFF OFF Light Light
34 50% OFF OFF OFF Light Light Light
51 66% OFF OFF Light Light Light Light
67 83% OFF Light Light Light Light Light
84 100% Light Light Light Light Light Light
Status Discharge
Battery Level Indicator
Battery Level
%Flash 3 OFF
CAN / RS485 Communication Terminal (RJ45 port), connect to inverter,
follow CAN / RS485 protocol.
05 06

3.1 Checking Before Installation
3.1.1 Checking Outer Packing Materials
3.1.2 Checking Deliverables
Packing materials and components may be damaged during transportation. Therefore,
check the outer packing materials before installing the battery. Checking the surface of
packing materials for damage, such as holes and cracks. If any damage is found, do not
unpack the battery and contact the dealer as soon as possible. You are advised to remove
the packing materials within 24 hours before installing the battery.
After unpacking the battery, check whether deliverables are intact and complete. If any
damage is found or any component is missed, contact the dealer.
The below table shows the components and mechanical parts that should be delivered.
INSTALLATION
GUIDE
Start
END
Check Before
Installation
Prepare
Installation Tools
Determine The
Installation Position
Electrical
Connection
Install Wall
Bracket
Install Battery
Installation flow chart
07 08
Carton
NO. Pictures Quantity Description
1
2
3
4
5
6
7
8
9
10
1PCS
1PCS
Battery
Hanging bracket
Supporting structure
2PCS
1PCS
Wall bracket
1PCS Test report
1PCS Certificate
4PCS
12PCS M6*16
2PC
M10*80
S M4*20
1PCS Manual
Hanging
bracket
Supporting
structure
Wall bracket
Pearl wool
Battery
Pearl wool

Minimum mounting distance between battery pack and equipment:
3.2 Tools
Model
Installation
Protection
Knife Measuring tape Socket wrench
(10/16mm)
Rubber mallet Cross Screwdriver Hammer drill(12mm)
ESD gloves Safety goggles Anti-dust respirator
Safety shoes
Tools
3.3 Installation requirements
• Install the battery in the indoor environment.
• Place battery in secure location away from children and animals.
• Do not place the battery near any heat sources and avoid sparks.
• Do not expose the battery to moisture or liquids.
• Do not expose the battery to direct sunlight.
3.3.1 Installation environment requirements
• Only mount battery on fire resistant building. Do not install batteries on flammable buildings.
• Battery is quite heavy, make sure the wall/ground can meet the load bearing requirements.
3.3.2 Installation carrier requirements
09 10
3.4.1 Dimensions
3.4 Installation Instructions
150mm 150mm 150mm
150mm 150mm
150mm 150mm 150mm
720mm
916mm
160mm

Connect to ground.
STEP 3
Use a crane to lift the ring on the battery pack and attach it to the
wall bracket.
STEP 4
11 12
Drill the hole with an 12mm drill bit as follows and fix the wall bracket to the wall.
STEP 1
3.4.2 Installation Procedure
Fastening
plater(M4*20)
PE
Hanging
Bracket
Supporting
structure
Floor Stand
Hole location
135 280 135
M10*80
14
620
135 280 135
M10*80
14
≥630
Wall Mounted
Hole location
The bearing capacity of the
wall is greater than 150kg.
STEP 2
Install the hanging bracket and support plate.
Lift the battery pack by crane

B-
P+ P+ P- P- P+ P+ P- P- P+ P+ P- P-
L1 L2 L4
L3
L8
L7
L5
L6
Parallel Cables:L1=L2=L3=L4=1000mm:70mm²EV Cable
Power Cables:L5=L6=L7=L8=1500mm:35mm²EV Cable
Inverter(one port)B-
P+ P+ P- P- P+ P+ P- P- P+ P+ P- P-
L1 L2 L4
L3
L6
L5
Parallel Cables:L1=L2=L3=L4=1000mm:70mm²EV Cable
Power Cables:L5=L6=1500mm:70mm²EV Cable
Battery
Battery
MASTER
Inverter(two port)
MASTER SLAVE SLAVE
Parallel
Parallel
CAN
Parallel
RS232
CAN RS232 CAN RS232
STEP 7
When multiple batteries are connected in parallel, follow the following wiring mode.
Parallel Cables length 1000mm;Power Cables length 1500mm.
scheme one
scheme two
B+
CAN RS232
to PCS CAN port CAN RS232
SLAVE SLAVE
communication cable Parallel
communication cable Lin In Link
Lin In Link
Lin In Link Out Out Out
to PCS CAN por
Lin In Link Out Lin In Link Out Lin In Link Out
communication cable communication cable
B+

4.1 Recharge Requirements During Normal Storage
Battery should be stored in an environment with temperature range between -10°C ~
+45°C, and maintained regularly according to following table with 0.5C (150A) current till 40
% SoC after long storage time.
MAINTENANCE
Recharge Conditions When In Storage
Storage
Environment
Temperature
Relative Humidity of
Storage Environment Storage Time SOC
Below -10℃prohibit
-10~25℃5%~70%
/
/
/
/
5%~70%
5%~70%
≤12 months
25~35℃≤6 months
35~45℃≤3 months
Above 45℃prohibit
30%≤SOC≤60%
30%≤SOC≤60%
30%≤SOC≤60%
Recharge Requirements When Over Discharged4.2
Over discharged (90% DoD) battery should be recharged according to following table,
otherwise over discharged battery will be damaged.
Recharge conditions when battery is over discharged
Storage Environment
Temperature Storage Time Note
-10~25℃≤15 days
25~35℃≤7 days
-10~45℃<12 hours
Battery Pack
disconnected from PCS
Battery Pack connected to PCS
15 16
Table of contents
Other SunSynk Batteries Pack manuals