Timotion TBB2 User manual

VERSION:D
20200514
TBB2
User Manual

TBB2 User Manual
Version D.May 2020
2
Contents
Contents .....................................................................................................................................................................2
Safety Instructions .....................................................................................................................................................3
1. Product Specifications .........................................................................................................................................3
2. Capacity Status and LED Indications ....................................................................................................................4
3. Operation .............................................................................................................................................................5
4. Maintenance.........................................................................................................................................................6
5. Electrical Protections ...........................................................................................................................................6
6. Appearance and Wiring Definitions.......................................................................................................................7
7. Packages, Transportations, and Storage ..............................................................................................................8
8. Manufacture information......................................................................................................................................9
9. Performance Data ................................................................................................................................................9
9.1 Charging and discharging characteristics .......................................................................................................................... 9
9.2 Constant life tests of charging/discharging on the 12V lead-acid battery in TBB2..................................................10
9.2.1 Testing temperature ...............................................................................................................................................10
9.2.2 Testing sample ........................................................................................................................................................10
9.2.3 Testing methods......................................................................................................................................................10

TBB2 User Manual
Version D.May 2020
3
Safety Instructions
1. Please read the following safety information carefully prior to the proper usage.
2. TBB2 must be used with rated input voltage only.
3. Don’t discard TBB2 randomly or expose them to heat sources, such as radiators or space heaters to
avoid any fire or explosions. To reduce environmental impacts, please bring your battery to a certified
recycling depot at the end of its life.
4. The battery must be tested by an authorized battery maintenance center.
1.Product Specifications
Product model: TBB2
Input voltage: 29 ~45V DC
Output voltage: 24V DC
Battery capacity: 1.2Ah (0.1C-discharge by 120mA)
Rated output current: 1.2A
Duty cycle: 10% (2 min. ON /18 min. OFF)
Operating temperature: 5~45°C
IP rating: Up to IP66W
Dimensions: 175*117*59.3mm
Net weight: 1.5kg /pc

TBB2 User Manual
Version D.May 2020
4
2.Capacity Status and LED Indications
There are four (4) kinds of LED indication status for the TBB2 power capacity:
When charging: charging or fully charged.
When discharging: high electricity capacity or low electricity capacity.
Above LED indications status, please refer to the following chart as Figure A:
Figure A
Status
Capacity of TBB2
LED indication- color & mode
When charging- (when system is connecting to AC power)
Charging
<100%
Green
Continuously short flashing-
blink once for 1 second /1-second interval
Fully Charged
=100%
Green
Shine continuously
When discharging- (TBB2 provides electricity when the system is unplugged)
High electricity
25%-100%
Green
Constantly long flashing –
blink once for 0.5 seconds / 4-second intervals
Low electricity
<25%
Orange
Constantly long flashing –
blink once for 0.5 seconds / 4-second intervals
When TBB2 under protection
Under protection
<20%
No flash light
Failure
Failure
- - -
Orange
Constantly on
Note 1: Green light will shine continually which means the capacity is around 70%; it will take another extra 10 hours to
be fully charged. (Within warranty>90%)
Note 2: When TBB2 is under protection mode (refer to section D): The LED indication is continuously off.
Note 3: If the orange light shines continually, it means disconnection of TBB2 or electrical circuit failure. If any related
condition occurs, please contact our authorized sales agent or TiMOTION.

TBB2 User Manual
Version D.May 2020
5
3.Operation
The operation of TBB2 with ON/OFF switches:
Switch ON:
Please connect TBB2 to the control box, and then press the switch constantly for 1~2 seconds until the
indication light is on. (As the below picture)
Switch OFF:
Please press the switch constantly for 3 seconds until indication light is off. We can disconnect theTBB2
from the control box for power saving. (As the below picture)

TBB2 User Manual
Version D.May 2020
6
4.Maintenance
It is highly recommended that TBB2 should be charged continuously at least 24hrs+ in the following
situations::
First operation
Before long time storage (long period of time when disconnected to AC power)
After long time storage (long period of time when disconnected to AC power)
Here under is the period of storage and battery capacity chart (Figure B)
Figure B
Period of
storage(included
time of
transportation)
Remaining
electricity
TBB2 Status
3 months
78%
Ready to use
4 months
56%
Recommend to be fully charged prior to the operation
>4 months
<56%
After a long period of storage, TBB may be worn out which may lead
to poor capacity. It’s highly recommended to charge the TBB for
24hrs every 6 months.
Note: Initial battery capacity equals to fully charged status at 100% when TBB2 was produced.
When batteries in TBB2 are defective, please use equivalent batteries for replacements or contact
original manufacturer for battery replacements.
5.Electrical Protections
Over current protection:
In the case of continuous 7.5Amp current consumption, over current protection will activate within 10
seconds.
Low voltage:
Over discharging protection will activate in the following conditions (as long as the electricity capacity is
under 20%).
On standby mode without operation: The voltage is continuously lower than 22.5V DC for 10 minutes.
Under operation: The voltage is continuously lower than 16.7 V DC for 15 seconds.
Note: Under the above conditions, the LED indication lights on TBB2 are always off.

TBB2 User Manual
Version D.May 2020
7
6.Appearance and Wiring Definitions
TBB2

TBB2 User Manual
Version D.May 2020
8
7.Packages, Transportations, and Storage
Standard package as picture below:
TBB2 is packed into small box and 4*2 layers small boxes for an outer carton.
Transportations:
By sea or land only.
Storage conditions:
Temperature: 5~45°C
Humidity: 10% - 93%
Atmosphere: 86kPa ~ 106kPa

TBB2 User Manual
Version D.May 2020
9
8.Manufacture Information
Company name:
TiMOTION Technology Co., Ltd.
Address:
10F, No.100, Minquan Rd., Xindian Dist., New Taipei City, 23141, Taiwan
Tel: + 886 2 2219 6633
Fax: + 886 2 2219 0295
Email: sales.tw@timotion.com
9.Performance Data
9.1 Charging and discharging characteristics
The following chart shows the correspondence between the controlled constant current and the
charging period through discharging continuously from the Full Capacity State (100% electricity capacity)
to the Low Capacity State (<20% electricity capacity).
Figure D: TBB2 (1.2AH) battery discharging test

TBB2 User Manual
Version D.May 2020
10
9.2 Constant life tests of charging/discharging on the 12V
lead-acid battery in TBB2
300 times test cycles on charging/discharging of the 12V lead-acid batteries in TBB2. Its aim is to check
the maximum electricity capacity of the battery, observing how it may decay as we increase the
charging/discharging cycles.
9.2.1 Testing temperature
20 5
9.2.2 Testing sample
Lead acid battery 12V, 1.2Ah (the batteries in TBB2)
9.2.3 Testing methods
One cycle is defined as “discharging + charging” of the battery
A. Discharging- to discharge sample1 by 500mA for 2hrs (sample2: to discharge by 300mA for 2hrs)
B. Charging- to charge sample1 by 200mA for 6hrs (sample2: to charge by 120mA for 6hrs)
Repeat till 25th cycles
A. Discharging- to discharge sample1 by 500mA until the voltage reaches to 10.2V and under the
protection mode (sample2: 300mA)
B. Charging- to charge sample1 by 200mA and measure theirs maximum capacity (sample2: 120mA)
Table of contents
Other Timotion Camera Accessories manuals