
Q-SERIES DI HEATER OPERATION / MAINTENANCE MANUAL CONTENTS
CONTENTS
1INTRODUCTION ........................................................................................................................................3
2SAFETY......................................................................................................................................................5
2.1 SAFETY MESSAGE CONVENTIONS............................................................................................5
2.1.a Danger ...........................................................................................................................5
2.1.b Warning..........................................................................................................................5
2.1.c Caution...........................................................................................................................6
2.2 EMERGENCY OFF (EMO).............................................................................................................6
2.3 LOCKOUT / TAGOUT....................................................................................................................7
2.3.a Preliminary .....................................................................................................................7
2.3.b Definitions ......................................................................................................................7
2.3.c Machine Lockout with access panels installed................................................................7
2.3.d Machine Start-Up with access panels installed...............................................................8
2.3.e Machine Lockout with access panels removed...............................................................8
2.3.f Machine Start-Up with access panels removed ..............................................................8
2.4 SEISMIC PROTECTION................................................................................................................9
3INSTALLATION ........................................................................................................................................10
3.1 UNPACKING................................................................................................................................10
3.2 LOCATION...................................................................................................................................10
3.3 UTILITY HOOK-UP......................................................................................................................10
4START-UP................................................................................................................................................13
4.1 PRE-START INSPECTION..........................................................................................................13
4.1.a Verify Shipping Condition .............................................................................................13
4.1.b Hazardous Power Terminals.........................................................................................13
4.1.c Electrical Inspection .....................................................................................................13
4.1.d Plumbing Leak Check...................................................................................................13
4.2 SYSTEM POWER........................................................................................................................14
4.3 HEATING WATER.......................................................................................................................14
5HEATER OPERATION .............................................................................................................................15
5.1 BACKGROUND COLOR CONVENTIONS FOR BUILT-IN GRAPHICAL USER INTERFACE......15
5.2 LOCAL OPERATION THROUGH BUILT-IN GRAPHICAL USER INTERFACE............................15
5.2.a Home Page ........................................................................................................16
5.2.b Alarm page .........................................................................................................16
5.2.c Configuration Page .............................................................................................18
5.2.d Plot Page ...........................................................................................................19
5.3 REMOTE OPERATION OVER AN EXTERNAL HARDWARE INTERFACE.................................20
5.3.a Remote Communication via Modbus/RTU....................................................................20
6PROCESS INTERLOCKS.........................................................................................................................22
6.1 LOW FLUID PRESSURE SENSOR.............................................................................................22
6.2 LIQUID LEVEL SENSOR.............................................................................................................22
6.3 ELEMENT OVER TEMPERATURE SENSOR..............................................................................23
6.4 LIQUID LEAK SENSOR...............................................................................................................23
6.5 OVERPRESSURE RELIEF FITTING ...........................................................................................23
7SYSTEM SHUT DOWN............................................................................................................................24
8MAINTENANCE........................................................................................................................................25
8.1 REPAIR INSTRUCTIONS............................................................................................................25
8.1.a Heater Element Check .................................................................................................25
8.1.b Heater Replacement.....................................................................................................25
8.1.c Liquid Level Sensor Calibration ....................................................................................27
8.1.d Draining the System.....................................................................................................27
8.1.e Leaks............................................................................................................................27
8.1.f Overpressure Relief Fitting Replacement .....................................................................28
8.2 PREVENTIVE MAINTENANCE SCHEDULE................................................................................28
9TROUBLESHOOTING..............................................................................................................................30
10 WARRANTY.............................................................................................................................................31
See Appendix for specific system requirements.