TREND OCC/U User manual

Installation Instructions
OCC/U
Ultrasonic Occupancy Detection System
OCC/U Ultrasonic Occupancy Detection System Installation Instructions TG101684 Issue 1/C 9/10/96 1
UNPACKING THE OCC/U
All versions are supplied individually boxed with installation instructions.
INSTALLATION
Mechanical
Asthemechanical installationisdifferentforeachdetectortype,besuretoreadeachsectioncarefully,and
select the appropriate procedure for your installation.
OCC/UD/DC
Thedetectors shouldbe mountedin theceiling ata
height of 2.4 to 3 m, in approximately the centre of
the area that is to be monitored.
(1) Ensurethatastandard25mmsinglegang
sinking box is fitted into the ceiling at the
correctlocation.
(2) Insert a length of 3 core cable into the
sinkingboxandconnectthethreewiresto
the screw terminals on the back of the
detector as shown in electrical section.
(3) Insertthedetectorintothesinkingbox,and
tighten the two screws.
II_OCCU.PM6 28/11/96, 16:521

OCC/U Ultrasonic Occupancy Detection System Installation Instructions TG101684 Issue 1/C 9/10/96
2
OCC/U ULTRASONIC OCCUPANCY DETECTION SYSTEM Installation Instructions
INSTALLATION(continued)
OCC/UDA/DC
The detector should be mounted in the ceiling at a
height of 2.4 to 3 m. If surface mounting, the
detector’s ‘viewing’ angle should be carefully
consideredbeforefixing.When‘flushmounted’the
viewing angle can be optimised after fixing. The
housingcanbesurfacemountedusingtheback-box
provided, or ‘flush-mounted’ in a ceiling tile using
the rings provided.
If flush mounted:
(1) Make a 70 mm diameter hole where the
detector is to be mounted.
(2) Push out the cable entry at the top of the
detector.
(3) Passa3-corecablethroughringBandthe
hole in the ceiling tile. Ring B should be
above the ceiling.
(4) Undothescrewsholdingthetwohalvesof
the detector together and separate them.
(5) Pass the cable through the cable entry in
theback-boxandconnectasshowninthe
electrical section.
(6) Re-assemble the detector with Ring A
sandwiched between the two halves.
(7) PassthetabsofRingAthroughtheceiling
hole and snap Ring B into place.
(8) Toremove detectorsimplyrotate and pull
down.
If surface mounted:
(1) Make a hole in ceiling and push a 3-core
cablethrough.
(2) Undoscrewsholdingthetwohalvesofthe
detector together and separate them.
(3) Fix back-box directly to surface using
2 screws as shown in diagram right.
(4) Pass the cable through the cable entry in
theback-boxandconnectasshowninthe
electrical section.
(5) Re-assemble the detector.
FlushMounting diagram
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
Ring B
Push back-box
Ring A
Surface Mounting diagram
50 mm
II_OCCU.PM6 28/11/96, 16:522

Installation Instructions OCC/U ULTRASONIC OCCUPANCY DETECTION SYSTEM
OCC/U Ultrasonic Occupancy Detection System Installation Instructions TG101684 Issue 1/C 9/10/96 3
Digital Input
To other
detectors
(max 10)
Detector Detector
Aux
Supply
IQ
Controller
24 Vdc
0 V
SIG
24 Vdc
0 V
SIG
24 Vdc
0 V
SIG
Digital Input
Voltage Input
To other
detectors
(max 10)
Detector Detector
Voltage
Input
IQ
Controller
24 Vdc
0 V
SIG
24 Vdc
0 V
SIG
24 Vdc
0 V
SIG
INSTALLATION(continued)
Electrical
(1) Isolate the mains supply to IQ controller
andlightingatsourcebeforecommencing
the electrical connections.
(2) Wire the detector to the required IQ
Controller as shown below. Up to 10
detectors may be wired in parallel to a
single input channel.
Note that it is important to set the IQ Controller’s
input to digital (or voltage on an IQ70 series), see
the appropriate controller data sheet for details.
(3) Wire the output of the IQ Controller to the
lightingrelay/contactor.
Aux Supply
II_OCCU.PM6 28/11/96, 16:523

OCC/U Ultrasonic Occupancy Detection System Installation Instructions TG101684 Issue 1/C 9/10/96
4
OCC/U ULTRASONIC OCCUPANCY DETECTION SYSTEM Installation Instructions
COMMISSIONING
Commissioning the Detectors
The commissioning of the detectors requires the
detectors to be positioned so that they cover the
required detection area, and may require their range
to be adjusted.
Positioning the detectors
(1) To position thedetectors,move the detector
head until the required area is covered (UD
optionsmove in one direction, UDAoptions
move in two directions).
Adjusting the range
This is not normally necessary as the detector is
factory set to suit most requirements, however
sometimes it may be necessary to reduce/increase
the detection pattern of the detector. To do this:
(1) Turn the lower adjustment screw until the
range is as required (clockwise reduces
the range).
Setting Up the IQ Controller
If an IQ Controller is being used to process inputs
from the OCC/U system, or to output a signal to it,
its strategy must be configured to do this. If a digital
input is used the necessary strategy should follow
the rules for fast sequencing.
Information on how to configure an IQ controller can
befound in the IQControllerConfiguration Reference
Manual (90-1533).
Itis alsoimportant thatthe input and output channels
are configured to be of the correct type; this is
described in the appropriate controller’s data sheet.
Trend Control Systems Ltd reserves the right to revise this publication from time to time and make changes to the content
hereof without obligation to notify any person of such revisions or changes.
Trend Control Systems Ltd P.O. Box 34 Horsham Sussex RH12 2YF Tel:+44 (0)1403 211888 Fax:+44 (0)1403 241608 www.trend-controls.com
30°
80°
IQ111, 131,
151 (non plus), 151+
OTHER IQ'S
U10 10
L 0 0
T 5 10
B -5 -10
Voltage Input Scaling Table
UD option UDA option
Adjustment angles
Range Control
Table of contents
Popular Security Sensor manuals by other brands

C.P. Electronics
C.P. Electronics EBDHS-PRM installation guide

Green Brook
Green Brook Orion Range manual

C.P. Electronics
C.P. Electronics EBDHS-B01-PRM installation guide

RKI Instruments
RKI Instruments CT-7 Series Operator's manual

TIF
TIF TIF5050A owner's manual

Vega
Vega VEGAPULS C 11 operating instructions