TTS Group Ltd –Building 1, Heyworth Road, Hucknall, Nottinghamshire, NG15 6XJ United Kingdom. www.tts-group.co.uk Tel:0800 138 1370
PLEASE NOTE THAT ASSEMBLY WILL NEED AT LEAST TWO ADULTS.
1. CHECK ALL PARTS ARE PRESENT.
2. SELECT SUITABLE LEVEL POSITION.
3. PLACE 1 X DOOR PANEL NEXT TO 1 X SIDE PANEL, FIX TOGETHER USING 4 X 80MM SCREWS THROUGH THE MARKED PRE DRILLED HOLES. (See Fig 1,
2 & 3).
4. PLACE SECOND SIDE PANEL ON OPPOSITE SIDE AND FIX TOGETHER USING 4 X 80MM SCREWS, THROUGH THE MARKED PRE DRILLED HOLES. (See Fig
4, 5 & 6).
5. PLACE SECOND DOOR PANEL INTO POSITION AND FIX TO THE SIDE PANELS USING 8 X 80MM SCREWS, (4 X EACH SIDE), THROUGH THE MARKED PRE
DRILLED HOLES. (See Fig 7, 8 & 9).
6. PLACE COVER INTO POSITION BY THREADING THE PLASTIC TOGGLES THROUGH THE HOOKS IN EACH POST. (See Fig 10, 11 , 12 & 13).