Twine TS-1800 Operating instructions

TS-1800 Site Preparation Guide
November, 2022
Revision 1.5
© 2022 Twine Solutions Ltd. All rights reserved.
This document and the information contained herein is CONFIDENTIAL to TWINE Solutions Ltd, and shall
not be used, published, disclosed, or disseminated outside TWINE in whole or in part without TWINE’s
consent. This document contains TWINE trade secrets. Reverse engineering based on any of the
information in this document is prohibited.
This copyright notice does not imply publication of this document.
This document shall not be circulated in part or whole outside TWINE.

Contents
Confidential
TS-1800 Site Preparation Guide
Page 2
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
Contents
1About This Guide ................................................................................................ 4
2Terms and Abbreviations ................................................................................ 5
3Physical Description ......................................................................................... 6
3.1 Overview ........................................................................................................................................ 6
3.2 Size and Weight.........................................................................................................................7
4Shipping and Delivery....................................................................................... 8
4.1 Shipping Pallet........................................................................................................................... 8
4.2 Pallet Lifting Equipment ...................................................................................................... 8
4.3 Unpacking Area........................................................................................................................ 8
4.4 Transporting the System in a Building.................................................................... 8
5Installation Area ................................................................................................ 9
5.1 General ........................................................................................................................................... 9
5.2 Floor Plan......................................................................................................................................10
6Electrical Requirements ...................................................................................11
6.1 Power................................................................................................................................................ 11
6.2 Grounding..................................................................................................................................... 11
6.3 Circuit Breaker........................................................................................................................... 11
6.4 Residual Current or Earth Leakage Device ......................................................... 12
6.5 Power cable................................................................................................................................ 12
6.6 UPS - Recommendations.................................................................................................12
7Network...............................................................................................................13
7.1 Network Connections..........................................................................................................13
8Environmental Conditions..............................................................................14
8.1 Temperature, Humidity and Altitude.......................................................................14
8.2 Air Quality.....................................................................................................................................14
8.3 System Environmental Specifications....................................................................14
9Accessories and Utilities .................................................................................15
9.1 Start-Up Kit..................................................................................................................................15
9.2 Fire Safety Equipment.........................................................................................................15
9.3 Cleaning the System...........................................................................................................15
9.4 Inputs and Outputs...............................................................................................................15
9.5 Color Selection tools............................................................................................................15
10 Materials Handling & Storage........................................................................ 17
10.1 Ink Cartridges............................................................................................................................ 17
10.2 Handling Waste....................................................................................................................... 17
11 Customer Information.....................................................................................18
11.1 Customer Details....................................................................................................................18
11.2 Site Preparation Checklist ...............................................................................................19

About This Guide
Confidential
TS-1800 Site Preparation Guide
Page 4
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
1About This Guide
The information and requirements provided in this document ensure proper
installation and operation of the Twine TS-1800 Digital Thread & Yarn Dyeing
system. The customer is responsible for:
Preparing the site as described in this document.
Complying with all applicable local regulations.
Filling out and signing the Site Preparation Checklist.
Sending the Site Preparation Checklist to your Twine representative.
If you have any questions about the information in this document, contact
your Twine representative.
All site preparation requirements must be met before the installation date.

Terms and Abbreviations
Confidential
TS-1800 Site Preparation Guide
Page 5
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
2Terms and Abbreviations
The table below lists terms and abbreviations used throughout this
document.
Term/Abbreviation
Definition
A
Ampere
AC
Alternating Current
ASL
Above Sea Level
°C
degrees Celsius or Centigrade
°F
degrees Fahrenheit
ft
feet
kg
kilograms
lb
pounds
TS-1800
Digital Thread Dyeing system
VAC
Volts Alternating Current

Physical Description
Confidential
TS-1800 Site Preparation Guide
Page 6
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
3Physical Description
3.1 Overview
The TS-1800 comprises a single stand-alone unit, as shown in the figure
below.
Figure 1: TS-1800 Digital Thread & Yarn Dying System

Physical Description
Confidential
TS-1800 Site Preparation Guide
Page 7
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
3.2 Size and Weight
The TS-1800 has the following main dimensions and weight:
Length (L) 2.0 meters (79 inches)
Width (W) 0.75 meters (30 inches)
Height (H) 1.45 meters (57 inches)
Weight 480 kg (1058 lb)
Figure 2: TS-1800 Dimensions

Shipping and Delivery
Confidential
TS-1800 Site Preparation Guide
Page 8
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
4Shipping and Delivery
4.1 Shipping Pallet
The approximate size and weight of the TS-1800 system when mounted on a
pallet is as follows:
Length (L) 2.25 meters (89 inches)
Width (W) 0.89 meters (35 inches)
Height (H) 1.74 meters (69 inches)
Weight 600kg (1323lb)
4.2 Pallet Lifting Equipment
A forklift must be available for pallet lifting. It must be able to lift at least
600kg (1323 lb).
4.3 Unpacking Area
An unpacking area must be available. The area must enable sufficient
clearance to lift the machine pallet and to unload the machine from the
pallet.
4.4 Transporting the System in a Building
Before entering the building with the system, identify the route you want to
use to get the system to the installation site.
The site manager is responsible for ensuring that:
All floors enroute to the site installation area can handle the total weight
of the system together with the transportation mechanism.
The building infrastructure (such as the elevators) can handle the total
weight of the system together with the transportation mechanism.

Installation Area
Confidential
TS-1800 Site Preparation Guide
Page 9
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
5Installation Area
5.1 General
IMPORTANT!
If the TS-1800 is going to be located in an area that is not on ground floor
level, you must ensure that the area has sufficient capacity for the
weight and physical dimensions of the machine.
The installation area should be free of sources of vibration and
electromagnetic interference that might affect the proper functioning of
the TS-1800.
Locate the TS-1800 in an area with a level floor, with a gradient of no
more than 0.5% (5mm per meter).
The floor should be stable and must be capable of bearing the weight of
the TS-1800. The minimum floor load specification is 235Kg/m2
(48lb/ft2).
Clearance around and above the TS-1800 should ensure convenient
access and servicing.
The area around the TS-1800 must always remain dry.

Installation Area
Confidential
TS-1800 Site Preparation Guide
Page 10
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
5.2 Floor Plan
A sample floor plan is shown below, with the TS-1800 placed in a likely
operating area. The dimensions shown in the figure are minimum clearance
requirements.
Figure 3: Floor Plan Sample (not to scale)

Electrical Requirements
Confidential
TS-1800 Site Preparation Guide
Page 11
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
6Electrical Requirements
The customer is responsible for ensuring that all tasks described in this
section are performed by qualified personnel.
6.1 Power
A stable, reliable source of power is necessary. Power to the TS-1800 is
supplied via a standard wall socket.
TS-1800 Power Rating
Total power consumption is 3KW. Power Supply:
220 to 240 VAC 50 to 60Hz, 15A, single phase. The wall outlet socket should
be your in-country standard.
Or:
220 to 240 VAC 50 to 60Hz, 15A, dual-phase, NEMA6-15 outlet for the USA or
any 110V power Grid.
If the power Grid cannot supply a minimum of 220V, the machine must be
connected using a Transformer.
Transformer Input 208V, 20Am, Transformer Output 220V-240V, 20Am
If the power at your facility does not support the above specifications,
contact your Twine representative.
6.2 Grounding
The TS-1800 is grounded through a single-phase, AC plug. Make sure that
the AC socket used is correctly grounded in accordance with local electrical
codes.
6.3 Circuit Breaker
A circuit breaker must be installed according to local regulation
requirements.
We recommend using a circuit breaker that is dedicated to the applicable
power socket.
An adjustable trip circuit breaker rated at 16A FLA (20A Trip) 240VAC, or 20A
fixed trip type may be used.

Electrical Requirements
Confidential
TS-1800 Site Preparation Guide
Page 12
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
6.4 Residual Current or Earth Leakage Device
We recommend using a wall socket that is connected through a residual
current or earth leakage device.
6.5 Power cable
The Power cable cord supplied with the machine, is without a power plug, in
order to be worldwide compatible. The local plug assembly should be
performed by a local electrician according to the safety regulations of your
country.
6.6 UPS - Recommendations
1. Output power capacity 5000VA
2. Nominal Output Voltage 240V
3. Nominal Input Voltage 240V
4. Output frequency 50/60 Hz.

Network
Confidential
TS-1800 Site Preparation Guide
Page 13
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
7Network
7.1 Network Connections
The TS-1800 should be placed in an area with access to a strong Wi-Fi signal
and connected to the network via a LAN communication connection.
Min. Internet Speed 40mb
Wi-Fi frequency should be 2.4GHz
Port 80, 1080 and Port 443 must be open(outside) to enable SW
upgrades and online support.

Environmental Conditions
Confidential
TS-1800 Site Preparation Guide
Page 14
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
8Environmental Conditions
8.1 Temperature, Humidity and Altitude
The environmental conditions for the TS-1800 must be maintained within the
limits detailed in the table below.
Parameter
Specification
Operating temperature
10°C to 30°C (50°F to 86°F)
Non-operating temperature
5°C and 50°C (41°F and 122°F)
Relative humidity
20% to 60%
Operating altitude
Must be less than 3000m
above sea level
8.2 Air Quality
The TS-1800 should be located in a room with adequate ventilation.
Typically, this means locating the TS-1800 in an airconditioned area where
the air is replaced at least four (4) times per hour.
8.3 System Environmental Specifications
Indoor use
Overvoltage Category II
Pollution degree 2
Maximum sound level: ° 65 dB

Accessories and Utilities
Confidential
TS-1800 Site Preparation Guide
Page 15
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
9Accessories and Utilities
9.1 Start-Up Kit
The TS-1800 comes supplied with a start-up kit which includes tools and
accessories. Make sure that your start-up kit is available during installation
and operation.
9.2 Fire Safety Equipment
Use only gas-based fire extinguishers in case of fire.
9.3 Cleaning the System
All parts of the system can be cleaned using one the following materials:
Isopropyl alcohol, technical grade
Ethanol, 99.9% technical grade
We recommend always keeping a gallon of one of these materials on site.
IMPORTANT!
Safety gloves must be worn when cleaning the system. Safety gloves
are supplied with the system.
9.4 Inputs and Outputs
The following input/output connections are required:
One electrical power socket as described in sections 6.1
One network LAN connection
Wi-Fi connection
9.5 Color Selection tools
To dye a new color, the TS-1800 must receive a color input in the L*a*b*
format This color format can be extracted from a fabric/yarn sample using
a spectrophotometer.
Examples for recommended spectrophotometers:

Accessories and Utilities
Confidential
TS-1800 Site Preparation Guide
Page 16
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
High-end: Datacolor 800
Mid-range: X-Rite i1 Pro 3
Basic: Spectro 1 Pro by Variable
Spectrophotometer settings for color matching:
∆E Formula: ∆E CMC 2:1
Color format: CIE Lab
Standard Illuminant: D65
Standard Observer: CIE 1964 10
IMPORTANT!
It is mandatory to have a spectrophotometer in hand for the installation.
Please notify Twine in advance if you do not have one for the training.

Materials Handling & Storage
Confidential
TS-1800 Site Preparation Guide
Page 17
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
10 Materials Handling & Storage
10.1 Ink Cartridges
The following storage requirements are important for ink cartridges:
Store ink cartridges in a dedicated cabinet.
Ink cartridges should be stored upright on trays.
Keep the temperature of the storage area between 5°C and 50°C (41°F
and 122°F).
Ensure that the humidity range of the storage area falls between 10%
and 70%.
Ink cartridges can be used only until the expiration date specified on the
cartridge.
10.2 Handling Waste
All waste created by the TS-1800 is considered hazardous chemical waste
and must be disposed of responsibly.
There are 3 types of waste:
1. Empty TDITM ink cartridges
2. Full Waste cartridges (reused ink cartridges)
3. TS-1800 used Carbon Filter
Handling TS-1800 Waste:
1. Store empty Ink cartridges and full waste cartridges separately from
new TDITM ink cartridges.
2. The three (3) waste item types are composed of chemicals, plastic,
fiber and other materials.. Please dispose of them responsibly by
sending them to a local chemical handling company, in accordance
with local laws and regulations.

Customer Information
Confidential
TS-1800 Site Preparation Guide
Page 18
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
11 Customer Information
Please fill in the information requested below and send it to your Twine
representative.
When your Twine representative approves your checklist, he will schedule
the system installation.
If you have any additional questions, please contact your Twine
representative.
11.1 Customer Details
Company name:
Company address:
Company telephone no.:
Company email address:

Customer Information
Confidential
TS-1800 Site Preparation Guide
Page 19
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
11.2 Site Preparation Checklist
#
Item
Meets Requirements
Notes
Yes
No
1.
Personnel available
for training
2.
Forklift and
unloading area
3.
Floor requirements
4.
Access to
installation location
5.
Power requirements
6.
Circuit breaker
7.
Grounding
8.
Power plug
9.
Communication line
10.
Wi-Fi
(recommended)
11.
Environmental
conditions
12.
Ventilation
13.
Fire extinguisher

Customer Information
Confidential
TS-1800 Site Preparation Guide
Page 20
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
11.3 Customer Acknowledgement
The undersigned acknowledges and agrees that any non-compliance with
the requirements specified in this document may result in additional
charges which will be incurred by the undersigned, and in the event that
such charges are incurred by Twine, the undersigned will reimburse Twine
for any such costs actually incurred by Twine.
Full name:
Company signature:
Date:
Other manuals for TS-1800
3
Table of contents