
Two Wests & Elliott Ltd
Unit 4 Carrwood Road, Sheepbridge Industrial Estate, Chesterfield, Derbyshire, S41 9RH
5. Place the cross bar under the mesh with the fold facing upwards.
6. Align holes, together with 4mm fixing brackets and fasten finger tight only. The mesh
assembly sits inside the tubular frame.
7. Turn the underside fixing brackets so they sit to the underside of the tube and tighten the
bolts fully.
Glazing ba
GLAZING BAR
8. Using the cropped bolts and nuts fix the triangular fixing plates to the greenhouse bars at
the desired height. The two outer hinge cleats then bolt onto the remaining holes in the
fixing plates.
9. Bolt the remaining three fixing supports to the Greenhouse roof bars above the Shelf.
10. Insert the small hooks into the supports.
11. Cut the chain to the required length and fasten between the hooks.