Une ZHERO User manual

Carefully follow all the steps indicated in the ZHERO quick installation guide, at the end of the installation fill in the check
boxes; the document must be delivered signed to the customer at the end of all the procedures described.
1. PLACEMENT OF A ZHERO
•In flat floor;
•in easily accessible places;
•in a position to ensure access to the switches;
•in a position that guarantees the space necessary to carry out maintenance operations;
•in places with air recirculation, no other regulatory compliance is required;
•In floors suitable to support the weight of UNE ZHERO.
2. GENERAL CONNECTION DIAGRAM OF THE MACHINE
Warning: refer to the connection diagram to cap. 5.7 of the manual UNE ZHERO, in case of need can be downloaded free of
charge from the site: https://www.unesrl.com in the section: "DOWNLOAD AREA".
Before proceeding it is necessary to identify the general scheme of the machine according to the type of application and the
type of network to which the UNE ZHERO system will be connected.
3. CONNECTION BETWEEN A ZHERO AND THE PHOTOVOLTAIC GENERATOR
INSTALLATION
The installation consists in connecting the cables coming from
the photovoltaic system to the pre-assembled MC4 of the
charge controllers, paying close attention not to reverse the
polarity.
To do this, remove the plate by unscrewing the appropriate
screws of the plate. Once the plate has been reinstalled and the
cables brought inside the system, they can be connected to the
regulators via the MC4 photovoltaic connector.
According to the type of regulator installed, check that the
string voltage is between 100 - 180 V or 200 - 600 V.
ATTENTION: It is necessary to install a PV unloader (SPD),
external to the machine, with Up index Up 2.5 kV.

4. AC CONNECTION - A ZHERO TO MAINS DISTRIBUTOR/GENERATOR and "BACKUP"
INSTALLATION
Connection of the distributor / genset network entering the system
(not production meter):
•LG: 230VAC DISTRIBUTOR / GENERATOR phase
•NG: Neutral DISTRIBUTOR / GENERATOR 230VAC
•Yellow / Green terminal: earth connection
Connection of the "backup" line (optional):
•LC: 230VAC Backup Phase
•NC: Neutral Backup 230VAC
•Yellow / Green terminal: earth connection
Connection of the production meter:
•LO: input phase to the production counter on the inverter side
•NO: neutral on inverter side counter input
•LOO: Output phase from the grid side production meter
•NOO: Neutral in output from the grid side production meter
In case of Off-grid application, a jumper must simply be made
between LOO and LO and between NOO and NO.
LEGEND
ISOL:
Insulation control.
ON-OFF:
Disconnector, allows you to turn the system on or off.
ALL:
Alarm button, allows you to reset a system alarm that
is signalled by the lighting of the red alarm lamp.
INV:
Differential magnetothermic output from the inverter, it
does not cause the interruption of the user but the
blocking of the supply from the battery + photovoltaic
source.
BYPASS:
Line diverter that allows you to bypass the "backup"
line covered by the system. Upwards the system is
covered by backup, in the central position the line is
interrupted and downwards the line is directly
connected to that of the distributor.

5. CONNECTION OF THE WATTMETER AND UTILITIES (MANDATORY ON-GRID)
The connection cable of the wattmeter to the system must not exceed 50m in length.
ATTENTION: the wattmeter is a single-phase 230V device with a maximum current of 100A.
ATTENTION: in the case of three-phase systems, each ZHERO system must have its own wattmeter.
ATTENTION: use twisted cables; do not use Cross cables.
Connection of AC to the wattmeter SINGLE-PHASE
From the exchange counter, connect Phase and Neutral to
terminals 1 and N below it:
•Connect the direct line to ZHERO in the corresponding
terminals 2 and N below;
•Connect the output utilities from the wattmeter then
downstream of the corresponding terminals 2 and N.
AC connection to THREE-PHASE wattmeter
From the counter, connect the three stages on 1 2 3, in
neutral is not connected.
•Connect the direct line to ZHERO in terminals 4 or 5 or
6;
•Connect the outputs from the wattmeter from the
terminals 4 - 5 –6;
•Neutral and GND are not connected to the wattmeter.
485 Wattmeter-ZHERO communication connection
•Connect an RJ-45 cable to the left RJ 45 input on the
device as shown in the image;
•Connect the other end of the cable to the RJ-45 port on
the ZHERO "WAT" panel;
•Make a jumper between terminal
o3 and 5 if single-phase;
o7 and 9 if three-phase.

6. INTERNET CONNECTION
Through Router
Perform the following operations on the router:
•Set the router in DHCP;
•TCP and UDP ports opening: 9090 related to the IP address
associated with the ZHERO by the router (in DHCP);
•Add the URL "HTTPS: \\ portal.zherosystem.com" to the
navigation exclusions.
Before connecting, check that the cable connection is working.
The ethernet cable outgoing from the ZHERO system must be
brought directly to the router or to a network switch connected to it
as shown in the figures.
Through range-extender
7. ZHERO ASSOCIATION WITH WEBSERVER
•The installer will have to request, if not already registered with his own account, his registration directly to UNE email:
assistenza@unesrl.com that will provide him with a username and password; by accessing the portal:
https://portal.zherosystem.com you can enter the code "WEB Activation: xxxxxx" which is located under the front cover,
above the main fan and start monitoring the system.
•The end customer will have instead to register independently on the site: https://portal.zherosystem.com and the
association by entering the same code "WEB Activation: xxxxxx".
8. CHECK CONNECTIONS
Check mains voltage (230V) on terminals LG –NG but do not supply;
Verify that the production counter is enabled;
Check that the network is present on the wattmeter and the communication cable connected;
Check the connection from the Internet cable to the “ETH” port;
Check the tightening of the screws of any backup line from LC - NC;
Verify that the photovoltaic system is enabled on entry to the system.

9. CONFIGURATION OF THE MAIN PANEL FOR THE FIRST STARTING
SWITCH PANEL
OPERATIONS
•Check that the 230 V grid power supply on the LG - NG
terminals has been disconnected for at least 30 seconds.
•Move the "BYPASS" switch to position 1 (Up) to put the
loads of the LC-NC line under the backup line (if the backup
line is provided);
•Enable the "INV" circuit breaker;
•Enable all users downstream and upstream of the system
(external to the system);
•Set the "ON-OFF" switch to ON;
•Set the 230V mains power supply on the LG - NG input
terminals.
CHECKS
Verify that the System Main Light remains green. It is advisable, after about a week, to remotely check that all devices are
communicating and that the system is perfectly in line with what is expected. (Photovoltaic production, battery charging and
discharging, etc).
Verify that the system turns on and begins to warm up the battery (this can take several minutes).
IF THE MAIN LIGHT OF THE SYSTEM REMAINS RED, YOU WILL FIND THE POSSIBLE SOLUTIONS IN CHAPTER 10.
10.OPERATION CHECK
MONITORING SOFTWARE
To verify the correct functioning of ZHERO use the software
ZHERO Installer Tool
with windows 7 or higher.
The USB type B port for ZHERO monitoring is located in the upper left
part, under the main panel.
The ZHERO Installer Tool software and the relative instruction manual
with le legend of each alarm "Manual - UneSrlCommunication" can be
downloaded from the site https://www.unesrl.com in the "DOWNLOAD
AREA".
For monitoring use a USB cable type A-Type B of length not exceeding
1 meter with ferrites applied to both ends of the cable as shown in the
figure.
It is recommended to keep the PC connected to the power outlet.

11.SUPPORT
•System installation: UNE is not responsible for the correct installation of the photovoltaic system and the Zhero system;
any requests for assistance must be received in writing by entering all the system data and a detailed description of the
anomalies, to the email address: assistenza@unesrl.com.
•System start: after starting the system, in case of persistent anomaly highlighted by the main red light, carry out the checks
•AUTOTEST: no network interface self-test must be performed, already installed within the system, a request must be sent
to the email: [email protected] to receive the test certificate to be used for network connection practices.
•Manuals and documentation: the ZHERO manual include all complete instructions for installation, use and maintenance of
the same and can be downloaded from the website: https://www unesrl.com in the section: "DOWNLOAD AREA".
•Internet connection: if the system is not online for more than 48 consecutive hours, before opening a technical assistance
ticket, follow all the steps indicated in manual chap. 8.6.
•Request for detailed technical information on the ZHERO system: they must be sent to the following address:
Thank you for choosing UNE srl products and for having carefully followed all the steps
necessary for correct installation.
Apply installer label with telephone number for customer assistance
Date: Place: Stamp and signature of the operator:
Document to be kept by the customer
Other manuals for ZHERO
5
Table of contents
Other Une Industrial Equipment manuals
Popular Industrial Equipment manuals by other brands

ABB
ABB XAC26216 Operation manual

Trane
Trane CenTraVac 2100 operation & maintenance

Dover
Dover Marathon V-4224 Operation, maintenance and installation manual

Eaton
Eaton NOVA STS-15 Installation and operation instructions

Grizzly
Grizzly T20798 owner's manual

MICRO-EPSILON
MICRO-EPSILON optoNCDT 1900-IE operating instructions