
1
1. Assemble the channel (F04C) & (F05C) together
using 4 screws. Make 2 sets.
F04C
F05C
2. Make a frame with the sub assemblies as shown below.
Make sure while assembling, the
channel position should be as
shown.
Note
Channel Position
F04C
FRONT SIDE
F05C
F04C
F05C
F01C
F01C
‘U’ CHANNEL
Note: Check all parts prior to installation.
CODE DESCRIPTION QTY
F01C FOUNDATION ‘U’ CHANNEL 6
F02C FOUNDATION ‘U’ CHANNEL 3
F03 FOUNDATION ‘L’ ANGLE 4
F04C FOUNDATION ‘U’ CHANNEL 2
F05C FOUNDATION ‘U’ CHANNEL 2
ACCESSORIES
CODE DESCRIPTION QTY
S1 DIA. 4.2 x 16mm. (5/32” x 5/8”)
SHEET METAL SCREW 52
Parts List
‘L’ ANGLE