
-9-
Installing and Setting Up
1. Connect the device to a power outlet and charge it
for at least 4 hours. Make sure the battery is fully
charged on first use. (Important: DC 5V)
2. Turn on the power switch on the back and screen
will be lit up.
3. External Sensors: Mount the sensor modules to the
valve stems one by one, meantime check the data
(air pressure value / temperature value) showing on
the corresponding position of the display screen is
normal or not.
Internal Sensors: Please take device to a tire-repair
workshop and let professionals
1Dismount tires.
2Replace the valve stems with sensor modules.
3Bleed and fill the tire one by one.
4At the same time observe the data (air pressure
value / temperature value) showed on the
corresponding position of the display screen is