VegeBox Growlight HGLITE User manual

Warranty:
Product Registration Instructions
1. Click on Customer Care
2. Click on Product Registration Form
3. Please fill out all fields marked with * to register
your product
Warranty begins the date item ships from our warehouse. All products have
a one year warranty from original date of shipment, unless otherwise noted .
VegeBo:x
Instruction Manual
Hydroponic Grow Light System
Model
#
HGLITE
, ::::::-.:'111111
VegoBox

Table of Contents
Product Overview ........................ 4
Quick Start (Standalone Set-Up) ............ 5
Quick Start (Combination Set-Up) ........... 6
How to Use ............................. 8
Tips .................................. 15
Warranty .............................. 16
3

Included:
Hydroponic Unit
Power Supply (48W)
Planting Bed A (2 pcs.)
Planting Bed B
Planting Bed C
Seed Box
Sponges (30 pcs.)
Planting Basket (30 pcs.)
Tweezers
Measuring Cup
Planting Hole Caps (5 pcs.)
Hydroponic Unit
Sponge (30 pcs.)
Product Overview
Additional Accessories Sold Separately:
Sponges
Planting Baskets
Planting Hole Caps
For Connecting Multiple Units:
Power Supply (240W)
Connecting Plate and Connecting Cable Set
Power Supply (48W)
----
fl
0 00 00
0 000
fo
o o
0 0
_,,.,,,,
Planting Bed C
Type A
Nutrition
Concentrate
(not included)
Not Included:
Type A Nutrients
Type B Nutrients
Seeds
Planting Bed A (2 pcs.)
Seed Box
Type B
Nutrition
Concentrate
(not included)
Planting Basket Tweezers Seeds Measuring Planting Hole
(30 pcs.)
(sold separately)
Cup Cap (5 pcs.)
I I
... --------------------------------------------------------
4
Quick Start Guide (Standalone Set-Up)
Before installing the right panel with water pump, remove the water pump
from the inside wall of the right panel. Attach the four supporting columns
to the base panel. Place the water pump in the center of the base panel as
shown in the figure below. Apply pressure to secure the water pump.
Base panel with logo
facing forward
I I
,------------------------------------------------------,
Place the top panel onto the right and left panel, making sure the top panel
clamps are aligned with the left and right panel slots. Once the top panel is
attached to the left and right panels, push the side panels inward to
complete the structure.
Top panel with power button facing forward
T-------------------------------------------------------1
Install the planting bed as shown.
Then, plug the power supply into the bottom socket located on the right
side of the panel, and connect to an outlet.
5

Quick Start Guide (
f
or Stackin
g
M
u
l
tip
l
e Unit
s
)
I
I
Step 1
Step 2
Step 3
Tip
Step4
Step 5
Step 6

How To Use
0
ON
OFF
1. Press the power button once; the green light will begin to flash
indicating the unit is on.
2. Press the power button again; the light will turn off indicating the
unit is off.
L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ 1
I I
8
Light Indicators
No Light
Unit is off.
Flashing Green Light
Unit is on and water level is low.
Solid Green Light
Unit is on and water level is sufficient.
Alternating between Green and Blue
Unit is on and water pump is draining water. ,
Draining the Water
WATER OUT LET
To drain the water out of the base, connect an 8mm tube (not included)
to the water outlet on the water pump.
1. When the unit is powered on, press and hold the power button for
3-5 seconds. The LED light around the power button will begin
alternating between blue and green and the water pump will begin
draining water out of the base.
2. Draining will automatically stop when the water level falls below the
pump's intake. The pump can also be stopped manually by pressing
the power button.
The rest of the water in the base can then be cleaned out with a towel.
9

Step 1 - Sowing
0
Seeds
Seed Box
Sponge(s) eezers
Water
I I
r ---------------------------------------------,
I
10
/
(
Water Line
Slightly Above
the Seeds
- - - - - - - - - - - - - - - - - - - - - - - - - - -.
Step 2 - Seeding
I .cm

Notes
This unit includes an intelligent lighting system and will automatically
start a day/night cycle of 14 hours of light and 10 hours of dark.
Activating Day/Night Cycle
To boost the growth of vegetables, we recommend starting the lighting cycle
between 5:00-9:00 AM. This is as simple as plugging in the hydroponic unit at
the time you want the unit to light up every morning.
For example: if the unit is plugged in at 5:00 AM, it will automatically start up at
5:00 AM every morning, stay lit for 14 hours, and turn back on at 5:00 AM the
next morning.
Setting Deactivation Time
This unit can be set to record a specific deactivation time.
At the desired time of deactivation, press the button for 3-5 seconds while the
unit is plugged in. The green light will stay lit, even though the unit's grow lights
are switched off. The unit will record this time as the deactivation time.
For example, if the button is pressed for 3-5 seconds while plugged in at 8:00
PM, after 10 hours of no light, the unit will turn its grow lights on automatically.
-----------------
Step 3 - Watering and Nutrition
--..:::=..-::
, Type A Nutrition Type B Nutrition
12
Concentrate Concentrate
(not included) (not included)
2 Gallons
of Water
Tweezers
Planting
Basket
I
1. Remove the planting bed or open
the water access lid.
2. Take 1 fl. oz. of Type A nutrition and mix it with 1
gallon of water. Take 1 fl. oz. of Type B nutrition
and mix it with a second, separate gallon of water.
-1 fl. oz.
1 gallon
Water Access Lid
f) 1 fl. oz.
1 gallon
3. There should now be two separate containers: one filled with a Type A
nutrition and water mixture and a second, Type B nutrition and water mixture.
Remove the water access lid and pour the Type A nutrition/water mixture into
the base first; then, pour in the Type B nutrition/water mixture.
NOTE: Ensure that the nutrition water mix process is completed thoroughly to '
avoid sediment from accumulating in the base.
Be sure to carefully follow the measurements in #2 above, as a high
density of nutrition will burn the roots and a low density will impact
growth.
13

4.
Gently separate the big sponge into
smaller pieces, so each sprout is
standing in its own individual small
sponge.
5. Remove overgrown and weak
sprouts from the group.
Weak
6.
Insert the small sponges, with the
sprouts inside, into the planting baskets.
Make sure the sponge sits flush against
the bottom of the planting basket, so
the roots can grow vertically.
NOTE:
Avoid squeezing all the water
out of the sponge and keep the
roots intact.
I/
.J.J
Overgrown
--------------------------------------------------------
14
I
I
7.
Place the planting baskets into their own
planting bed holes. Make sure the roots are
in contact with the water and turn on the
lighting cycle until fully grown.
- - - - - - - - - - - - - - - - - - - - - - - - - - -·
Tips
•If there are empty holes in the planting bed,
cover them with planting hole caps to avoid
algae from growing in the water below.
•During harvest, try to remove all broken
roots from the base and keep the planting
basket for the next planting cycle.
•We recommend cleaning the base every 3
months. Completely drain the water, remove
any residue and broken roots.
Remove
f:. · · ---- Broken
(( Rooo
I
I
------------------------------------------------------.,;
15
Popular Lawn And Garden Equipment manuals by other brands

Orbit
Orbit Yardworks 62015 instruction manual

Premier designs
Premier designs Wind Garden Sopwith Camel Airplane Spinner Assembly instructions

PestWest
PestWest TITAN ALPHA Instructions for use

Billy Goat
Billy Goat AE400H, AE450 Operator owner's manual

Gronomics
Gronomics FT 24-72 Assembly instruction

Isotra
Isotra ARTOSI MEASUREMENT AND ASSEMBLY MANUAL