Verismo 585 User manual

Disk
SBUX FTP
Vertis
Design Gallery
Email
Other
STARBUCKS COFFEE COMPANY
2401 Utah Avenue South Seattle, WA 98134
Inks Used:
Cyan
Magenta
Yellow
Black
SCHEDULED RELEASE DATE:
None
Job Number:
SJB12-22554
Layout: M7 Date: 7-12-2012 3:56 PM
Job Name:
Verismo 585 Quick Start UK English Only
File Name: SJB12-22554 Versimo 585_Quick-Start_UK_EngOnly_M7.indd
Proj Spec: None
Printed by: lwikoff634736 Print Scale: None
Rights: None Photo Illus: None
Trim: 210 mm x 210 mm Bleed: 213.175 mm x 213.175 mm
Part #: None SKU #: None UPC: None
IMPORTANT NOTES: None
See OK OK with Needs
INITIALS
Prev AS-IS Changes
Changes
Proj Owner: Jen Picken
Creative Mgr: Mike Peck
Designer: Anasazi Wade
Copywriter: Steve Murray
Print Buyer: Charlie Webster
Prepress: Prepress
Proofreader:
Visual Pres:
Regulatory:
Client: None
.
.
.
.
.
.
1: THIS PROOF IS FOR CONTENT/DESIGN AND NOT COLOR.
2: ALL COMMENTS ON LAYOUTS MUST BE LEGIBLE, SIGNED AND DATED.
3: YOUR INITIALS ACKNOWLEDGE YOU HAVE CAREFULLY REVIEWED THIS
LAYOUT AND HAVE PROVIDED YOUR OFFICIAL APPROVAL OR FEEDBACK.
Getting Started
Quick Start Guide
EN
T:210 mm
T:210 mm

Disk
SBUX F TP
Vertis
Design Galler y
Email
Other
STARBUCKS COFFEE COMPANY
2401 Utah Avenue South Seattle, WA 9 8134
Inks Used:
Cyan
Magenta
Yellow
Black
SCHEDULED RELEASE DATE:
None
Job Number:
SJB12-22554
Layout: M7 Date: 7-12-2012 3:56 PM
Job Name:
Verismo 585 Quick Start UK English Only
File Name: SJB12-22554 Versimo 585_Quick-Star t_UK_EngOnly_M7.indd
Proj Spec: None
Printed by: lwikoff634736 Print Scale: None
Rights: None Photo Illus: None
Trim: 210 mm x 210 mm Bleed: 213.175 mm x 213.175 mm
Part #: None SKU #: None UPC: None
IMPORTANT NOTES: None
See OK OK with Needs
INITIAL S
Prev AS-IS Changes
Changes
Proj Owner: Jen Picken
Cre ativ e Mg r: Mike Peck
Designer: Anasazi Wade
Copywriter: Steve Murray
Print Buyer: Charlie Webster
Prepress: Prepress
Proofr eader:
Visual Pres:
Regulatory:
Client: None
.
.
.
.
.
.
1: THIS PROOF IS FOR CONT EN T/DESIGN AND NOT COLOR.
2: ALL COMM EN TS ON LAYOUT S MUST BE LEGIBLE, SIGNED AND DATED.
3: YOUR INITIALS ACKNOWLEDGE YOU HAVE CA REFULLY REVIE WED THIS
LAYOUT AND HAVE PROVIDED YOUR OFFICIAL APPROVAL OR FEEDBACK.
Welcome—
You’re a few steps away from making some of your favourite
Starbucks®beverages right in your own kitchen, one cup at
a time. Starbucks recipes, Starbucks®coffee, and the machine
that makes it all possible—VerismoTM System by Starbucks.
Enjoy.
T:420 mm
T:210 mm

Disk
SBUX F TP
Vertis
Design Galler y
Email
Other
STARBUCKS COFFEE COMPANY
2401 Utah Avenue South Seattle, WA 9 8134
Inks Used:
Cyan
Magenta
Yellow
Black
SCHEDULED RELEASE DATE:
None
Job Number:
SJB12-22554
Layout: M7 Date: 7-12-2012 3:56 PM
Job Name:
Verismo 585 Quick Start UK English Only
File Name: SJB12-22554 Versimo 585_Quick-Star t_UK_EngOnly_M7.indd
Proj Spec: None
Printed by: lwikoff634736 Print Scale: None
Rights: None Photo Illus: None
Trim: 210 mm x 210 mm Bleed: 213.175 mm x 213.175 mm
Part #: None SKU #: None UPC: None
IMPORTANT NOTES: None
See OK OK with Needs
INITIAL S
Prev AS-IS Changes
Changes
Proj Owner: Jen Picken
Cre ativ e Mg r: Mike Peck
Designer: Anasazi Wade
Copywriter: Steve Murray
Print Buyer: Charlie Webster
Prepress: Prepress
Proofr eader:
Visual Pres:
Regulatory:
Client: None
.
.
.
.
.
.
1: THIS PROOF IS FOR CONT EN T/DESIGN AND NOT COLOR.
2: ALL COMM EN TS ON LAYOUT S MUST BE LEGIBLE, SIGNED AND DATED.
3: YOUR INITIALS ACKNOWLEDGE YOU HAVE CA REFULLY REVIE WED THIS
LAYOUT AND HAVE PROVIDED YOUR OFFICIAL APPROVAL OR FEEDBACK.
°C
°C
°C
WARNING
WARNING: Make sure the lever is closed
completely during use. Extremely hot
water runs through the appliance when
operating (brewing, descaling, cleaning,
rinsing). To avoid the risk of scalding or
other injury, always keep the lever in the
closed/down position while machine is
operating. Do not reach under the spout
and do not remove the drip tray.
1. Fill water tank to line. 2. Plug in the power cord. 3. Push Power button.
For First-Time Setup Only
Scan here to see a
video demonstration.
4. Wait until lights stop blinking
(20 seconds).
Note: If red lights are on,
confirm that the tray is
positioned correctly and the
water tank is not empty.
5. Machine is ready to rinse. Place cup on
drip tray and ensure lever is closed.
6. Before initial use, rinse machine five
times using the following process: Push
Rinse button, water will pour through,
then empty cup. Repeat process four
more times.
7. Machine is ready to use.
5x
T:420 mm
T:210 mm

Disk
SBUX F TP
Vertis
Design Galler y
Email
Other
STARBUCKS COFFEE COMPANY
2401 Utah Avenue South Seattle, WA 9 8134
Inks Used:
Cyan
Magenta
Yellow
Black
SCHEDULED RELEASE DATE:
None
Job Number:
SJB12-22554
Layout: M7 Date: 7-12-2012 3:56 PM
Job Name:
Verismo 585 Quick Start UK English Only
File Name: SJB12-22554 Versimo 585_Quick-Star t_UK_EngOnly_M7.indd
Proj Spec: None
Printed by: lwikoff634736 Print Scale: None
Rights: None Photo Illus: None
Trim: 210 mm x 210 mm Bleed: 213.175 mm x 213.175 mm
Part #: None SKU #: None UPC: None
IMPORTANT NOTES: None
See OK OK with Needs
INITIAL S
Prev AS-IS Changes
Changes
Proj Owner: Jen Picken
Cre ativ e Mg r: Mike Peck
Designer: Anasazi Wade
Copywriter: Steve Murray
Print Buyer: Charlie Webster
Prepress: Prepress
Proofr eader:
Visual Pres:
Regulatory:
Client: None
.
.
.
.
.
.
1: THIS PROOF IS FOR CONT EN T/DESIGN AND NOT COLOR.
2: ALL COMM EN TS ON LAYOUT S MUST BE LEGIBLE, SIGNED AND DATED.
3: YOUR INITIALS ACKNOWLEDGE YOU HAVE CA REFULLY REVIE WED THIS
LAYOUT AND HAVE PROVIDED YOUR OFFICIAL APPROVAL OR FEEDBACK.
FOR ALL BEVERAGES:
• Immediately after making a beverage, lift and close lever to release pod
into the used pod container.
• Rinse the machine before or after making each beverage by placing an
empty cup on the drip tray and pushing the Rinse (bottom right) button
once, then discarding hot water.
• When inserting pods, please close handle with one smooth motion.
Avoid back and forth movement of the handle or hesitation when closing
the lever, as this can cause the pod to drop straight into the used pod
container without being punctured.
CAUTION
CAUTION: There are four sharp needles that punc ture the
Verismo™ System pods inside the pod opening. To avoid risk
of injur y, do not put your fingers in the pod opening.
Do not remove the top foil lid
or puncture the pod.
Starbucks®Caffè Latte
1. Lift handle, insert milk pod and close.
2. Push Milk (top right) button, wait for milk to
stop pouring.
3. Lift handle and insert espresso pod, then close.
4. Wait until lights stop blinking, then push Espresso
(top left) button.
For a milkier latte, repeat steps 1 & 2 by adding another milk pod.
Starbucks®Espresso
1. Lift handle, insert espresso pod and close.
2. Push Espresso (top left) button.
Starbucks®Filter Coffee
1. Important: Just before brewing, remove foil freshness tab
from bottom of pod (to expose the filter).
2. Lift handle, insert brewed coffee pod and close.
3. Push Brewed (top middle) button.
Starbucks®Americano
1. Lift handle, insert espresso pod and close.
2. Push Espresso (top left) button.
3. Lift handle, close without inserting a pod.
4. Push the Brewed (top middle) button to add hot water.
Enjoying Starbucks®Beverages at Home
T:420 mm
T:210 mm

Disk
SBUX FTP
Vertis
Design Gallery
Email
Other
STARBUCKS COFFEE COMPANY
2401 Utah Avenue South Seattle, WA 98134
Inks Used:
Cyan
Magenta
Yellow
Black
PMS 3425 C
SCHEDULED RELEASE DATE:
None
Job Number:
SJB12-22554
Layout: M7 Date: 7-12-2012 3:56 PM
Job Name:
Verismo 585 Quick Start UK English Only
File Name: SJB12-22554 Versimo 585_Quick-Start_UK_EngOnly_M7.indd
Proj Spec: None
Printed by: lwikoff634736 Print Scale: None
Rights: None Photo Illus: None
Trim: 210 mm x 210 mm Bleed: 213.175 mm x 213.175 mm
Part #: None SKU #: None UPC: None
IMPORTANT NOTES: None
See OK OK with Needs
INITIALS
Prev AS-IS Changes
Changes
Proj Owner: Jen Picken
Creative Mgr: Mike Peck
Designer: Anasazi Wade
Copywriter: Steve Murray
Print Buyer: Charlie Webster
Prepress: Prepress
Proofreader:
Visual Pres:
Regulatory:
Client: None
.
.
.
.
.
.
1: THIS PROOF IS FOR CONTENT/DESIGN AND NOT COLOR.
2: ALL COMMENTS ON LAYOUTS MUST BE LEGIBLE, SIGNED AND DATED.
3: YOUR INITIALS ACKNOWLEDGE YOU HAVE CAREFULLY REVIEWED THIS
LAYOUT AND HAVE PROVIDED YOUR OFFICIAL APPROVAL OR FEEDBACK.
K-fee is a registered trademark of K-fee System GmbH.
© 2012 STARBUCKS COFFEE COMPANY. ALL RIGHTS RESERVED.
SJB12-22554
Visit us at Verismo.com
Verismo™System V•585 OOH 21 30094346
Swiss Engineered High-Pressure Technology
T:210 mm
T:210 mm
Table of contents
Other Verismo Coffee Maker manuals