
4
3
Move the trellis to its final location. When you are satisfied with
the locatio n,mark the positions of the posts,then move the trellis
aside and lay it carefully on it’s side. Excavate the 2 post holes
approximately 15" (38 cm) deep x 6" (15 cm) diameter. Carefully
move the trellis
back into position.
Level it both vertically and horizontally into the excavated holes.
Backfill the holeswith the excavated soil.
A
B
C
Mounting Into the Ground
Trellises must be well secured in the event of high winds, etc. We
have provided two ground mounting extensions for securing the
trellis
either into the ground or into a concrete footing. If
you are
installing your trellis directly to the wall of your home, or on a
wood deck
or concrete surface, please see your hardware store for the
appropriate galvanized bracket hardware.
STEP THREE
In sta ll the Ground Mounting Extensions
Insert the ground mounting extensions into the bottom of the
trellis
posts. Secure with screws as shown aside.
STEP FOUR
Install Trellis into Ground
A
4
15” (38 cm)
Level
6“
(15 cm)
B
C
North America Toll Free Phone: 1 800 282 9346
www.wearevita.com