The purpose and scope of the document is to outline
the instructions for the installation of the Eco-Smart
and Power Boost Energy Management Solutions.
Purpose and Scope
of the Document
POWER METER INSTALLATION

5
Getting Started
Inside the Package
Energy Meter
A. Install the charger following the instructions listed in
the chargers’ Installation Guide. Refer to the user guide
on the Wallbox Academy page for more information.
B. Only use smart meters sold by Wallbox or a Wallbox
certified reseller approved for use with Wallbox Energy
Management Solutions.
C. Installations should be performed only by qualified
personnel in accordance with applicable local
regulations.
D. Update the Wallbox charger with the latest software
version before installing the smart meter. Refer to the
instructions for updating the charger on the Wallbox
Academy page.
E. Ensure that the charger is powered o and its cover is
removed before connecting the smart meter. Close the
charger properly after the installation.
F. After installing the charger, connect the smart meter
before closing your charger. If the charger was
previously installed, follow the charger installation
instructions for opening the charger.
Important Notes
Meter Wiring Guide
Meter
Wiring
Guide
POWER METER INSTALLATION

6
Getting Started
Compatible Devices
Tools
Materials (not included)
Wallbox Pulsar Plus
Refer to the Pulsar Plus North America Installation Guide
for a complete list of tools required for installation.
POWER METER INSTALLATION
T20 Screwdriver
or Bit
B
Measuring
Tape
Multimeter
C D
Small, flat,
Screwdriver
A
Conduits3/4 Conduit Hub Recommended Cable
(STP class 5E up to
1600 ft/ 500 m)

7
Use the small opening located at the bottom of the charger
between the power input and the EV connector cable output.
When using this opening for the communications cabling,
first remove the screw plug. Use a wrench to hold the
interior lock nut while unscrewing the plug using a flathead
screwdriver from the bottom (exterior) side of the plug.
Installation
Preparation
POWER METER INSTALLATION

8
N
N
1
L1 L2
23
13 14 15 16 17 18
Installation
Wiring the System
This meter is only supported on installations with the following requirements:
• 3 wire installation: 2 hot wires + neutral
• Phase to phase voltage: 208-240 V
• Phase to neutral voltage: 120 V
Follow the diagram for wiring the system:
POWER METER INSTALLATION

9
B. Utility Meter
H. Other House
Loads
I. Wallbox
Charger
J. Car
C. Main Switch
A. Grid
E. Energy Meter
F. Communication
G. Breaker
D. Eletrical Panel
Positioning and General Overview
Follow the scheme below for positioning the CT clamps and
the communication cable to charger.
Communication
cable to charger
Positioning
of CT clamps
Installation
POWER METER INSTALLATION

10
Circuit Protection
The EM530 is considered a continuously connected device, so it requires
an overcurrent protective device against current beyond the acceptable
rating of the equipment.
Connection of the meter
through a devoted breaker
CT clamps
Meter
Communication Line
There must be a wired communication line between the meter
and the charger. For this purpose, use STP Class 5E 1600 feet/500
meter Max Length.
1. Ensure that the power is o before proceeding
with the connection.
• Use circuit breakers or fuses rated 20 Amps or less.
• The circuit breaker must protect L1 and L2, all the active phases.
• The circuit protection must comply with local standards.
• In case there is no free space on the panel, the power meter can
be installed in an external enclosure.
Installation
POWER METER INSTALLATION

11
2. In the electrical panel box, locate a space for mounting the meter.
If possible, mount the meter inside the panel enclosure (box).
3. Add a protection for the meter in the electric box.
4. Wire the terminals N,1 and 2 from the meter to the neutral
and two hot lines from your electrical panel.
min: 0.2 mm2/AWG24
max: 2.5mm2/AWG12 ≤ 0.45 Nm
N
N
1
L1 L2
23
13 14 15 16 17 18
Installation
POWER METER INSTALLATION

12
5. Connect the CT clamps to the incoming "hot" lines as shown.
Important
Follow the internal arrow indicating the current
direction when installing the clamps.
Arrow to follow
Position
Installation
POWER METER INSTALLATION

13
13 14 15 16 17
6. Wire the CT clamps to the meter using the following
connection points:
13- Red wire/CT1
14- Black wire/CT1
15- Red wire/CT2
16-Black wire/CT2
18
1 2 3 4 5 6
KL
K
L
KL
K
L
Installation
POWER METER INSTALLATION

14
7. Connect the meter to the charger using an STP Class 5E
1600 feet/500 meter Max Length communication cable.
For the communication between charger and meter only
three wires are needed. The connection between terminals
7-8 is a loop for activating the end of line resistor of the
communication.
7 8 9 10 11 12
B+ GNDA-
T
EM 530 Wallbox
A-
B+
GND
D- (RS485B)
(RS485A)
D+
GND
Installation
10
8
9
7
POWER METER INSTALLATION

15
8. Check that everything is connected properly
in accordance with the installation manual
and local regulations.
9. Proceed with the Software configuration. At this
point when the meter is powered up, the screen
will show a Quick Setup Menu.
Installation
3Pn ->2P
1 ->50
POWER METER INSTALLATION

16
9.1. Select GO.
9.2. On the Systems screen, scroll down to 2P and press
Enter.
9.3. Continue to the Ct rAt Menu
9.4. Press OK.
9.5. Set the Ct rAt value up to 50, so that it matches
with the 250 A clamps supplied.
9.6. The meter has been successfully configured.
Installation
POWER METER INSTALLATION

17
1. Press the ENTER button placed
on the meter.
For Eco-Smart installation the following
configuration must also be completed:
1 2 3 4 5 6
Installation
Disclaimer
POWER METER INSTALLATION

18
2. Press the Enter button until you
reach the Settings menu.
1 2 3 4 5 6
Installation
POWER METER INSTALLATION

19
3. Using the down arrow button,
scroll to "Ct rAt Measure".
1 2 3 4 5 6
Installation
POWER METER INSTALLATION

20
4. Press Enter.
5. Scroll down to b.
1 2 3 4 5 6