
12. Once all panels and shelves/drawers are sec red, meas re along the top of the system from wall-to-wall to get
yo r overall width meas rement for the top shelf. C t the top shelf to size sing an 8pt saw. We recommend
sing masking tape along yo r c t line before yo c t, to reveal a nice clean c t. Screw the top shelf into each
vertical gable at the front and back. If yo have limited space above the top shelf and cannot access with a screw
driver, we recommend sec ring the top shelf from nderneath sing Econo brackets (s pplied).
13. Screw hanging rail brackets to their opposing walls. Top rail sho ld be installed as shown: 50mm down from the
top and 300mm from the back wall is where the top of the bracket sho ld be fixed.
For mid height rails, we recommend installing them 1m below the top height rail. Slot hanging rails into
brackets. Refer to Hanging Rail instr ctions for information abo t c tting rails to size.
14. Once everything is in place incl ding the top shelf, sec re the system to yo r gibbed walls with the Econo
brackets s pplied. Where possible, fix Econo bracket into st ds. Use a 5mm drill bit. If yo r system has drawers it
is recommended to sec re Econo brackets nder the shelf above the top drawer, this will be hidden at the very
back and will help yo r system stay sq are for efficient drawer operation.