
6
Position the S4 monitor assembly through the right key bracket as shown.
Ensure that the spring and washer orientation is correct. Replace the R Pin retaining
the monitor assembly as shown. Place the new S4 Top Deck, top side down, on the
top of the tank on the side opposite the monitor.
Connect the sensor connector.
OK
WaterR ow er SeriesIV Perf ormanc eMon itor
workout
programs
stored
programs
zones
ho ld /reset
unitsadvanced
on
7
Place the new S4 top deck on the tank, making sure to connect the sensor.
8
Replace the JCB bolts and tie rods connecting the top deck to the tank assembly.
Ensure that the tie rod cross dowel slots are aligned with the tie rod. You may utilize
a screw driver to assist this.
JCB Bolts Upper Tie Rods
*Barrel
Nut