TABLE OF CONTENTS
GENERAL INFORMATION................................................................................ 5
1.1 WARNINGS & CAUTIONS.....................................................................................................................5
1.2 INTRODUCTION ...................................................................................................................................6
1.3 ELECTRONIC CONTROL SYSTEM II (ECS II) ...........................................................................................7
1.3.1 The Control Box Assembly ...........................................................................................................8
1.3.2 Flow Meter...................................................................................................................................8
1.3.3 Outlet Temperature Sensors .......................................................................................................9
1.3.4 Boiler Water Inlet Temperature Sensor.......................................................................................9
1.4 SmartPlate EV PIPING ASSEMBLIES...................................................................................................10
1.5 3-WAY ELECTRONIC CONTROL VALVE...............................................................................................11
INSTALLATION................................................................................................13
2.1 INTRODUCTION .................................................................................................................................13
2.2 RECEIVING AND UNPACKING ............................................................................................................13
2.3 SITE SELECTION AND PREPARATION .................................................................................................14
2.3.1 Installation Clearances...............................................................................................................14
2.3.2 Setting the Unit..........................................................................................................................15
2.4 HEATING FLUID AND DOMESTIC HOT WATER (DHW) PIPING...........................................................15
2.5 SmartPlate EV & BENCHMARK PLATINUM BOILERS .........................................................................15
2.6 ELECTRICAL WIRING CONNECTIONS .................................................................................................16
2.6.1 Modbus Connection...................................................................................................................18
2.7 PRESSURE RELIEF INSTALLATION.......................................................................................................19
FUNCTIONAL DESCRIPTION..........................................................................21
3.1 INTRODUCTION .................................................................................................................................21
3.2 MECHANICAL OVERVIEW ..................................................................................................................21
3.3 ELECTRONIC CONTROL OVERVIEW ...................................................................................................21
3.4 OVER-TEMPERATURE CONTROL AND SAFETY FEATURES .................................................................22
ADJUSTMENT..................................................................................................25
4.1 INTRODUCTION .................................................................................................................................25
4.2 3-WAY CONTROL VALVE ADJUSTMENT AND WIRING.......................................................................25
4.2.1 3-WAY Control Valve Actuator Installation and Wiring.............................................................26
4.2.2 3-Way Valve Stroke Adjustment................................................................................................28
4.2.3 Zero and Span Calibration..........................................................................................................28
4.3 ELECTRONIC CONTROL SYSTEM ........................................................................................................29
4.3.1 Setpoint Temperature Adjustment............................................................................................29
4.3.2 Over-Temperature Alarm Limit Adjustment..............................................................................31
OPERATION.....................................................................................................33
5.1 INTRODUCTION .................................................................................................................................33
5.2 PRE-OPERATIONAL CHECKS, INITIAL START-UP ................................................................................33
5.3 SHUTTING DOWN THE SYSTEM.........................................................................................................34
SCHEDULED MAINTENANCE.........................................................................37
6.1 INTRODUCTION .................................................................................................................................37
6.2 PLATE PACK LEAKAGE CHECKS ..........................................................................................................37
6.3 OVER-TEMP SWITCH CHECK..............................................................................................................38
6.4 STRAINER INSPECTION AND CLEANING ............................................................................................38
6.5 3-WAY CONTROL VALVE OPERATIONAL CHECK................................................................................39