1Safety First
1.1 Introduction 2
1.2 Tower Designation 3
1.3 Maintenance - Storage - Transport 3
2Building the Tower
2.1 Pre-Assembly Checks 4
2.2 Component Diagram 6
2.3 Quantity Schedule 7
2.4 Stabilisers 8
2.5 Adjustable Legs 8
2.6 Assembly 9
2.6.1 Assembly Procedure for 0.6m Tower 10
2.6.2 Assembly Procedure for 1.7m Tower 13
2.6.3 Assembly Procedure for 3.7m Tower 16
2.6.4 Assembly Procedure for 5.8m Tower 22
2.6.5 Fitting Toe Boards 29
2.7 Dismantling 29
3 Using the Tower
3.1 Safety Checklist 30
3.2 Pre-Use Checklist 30
3.3 Use 31
3.4 Movement Of The Assembled Prefabricated Tower Scaffold 34
PN00063300_Minimax_IM_RevD 0522.indd 1PN00063300_Minimax_IM_RevD 0522.indd 1 01/06/2022 10:5401/06/2022 10:54

2MiniMax Instruction Manual
1 Safety First
1.1 Introduction
Please read this instruction manual carefully.
This instruction manual shall be available at the location of use of
this mobile access tower. Instruction manuals are also available to
download at www.minimaxtower.com.
This product shall only be used in accordance with this manual without any
modification.
FAILURE TO FOLLOW THESE INSTRUCTIONS MAY LEAD TO
DEATH OR SERIOUS INJURY.
Mobile access towers must always be used in accordance with the national
regulations. If any aspect of these instructions conflicts with local regulations please
contact Werner UK Sales & Distribution Ltd. for advice.
Please note that diagrams are for illustrative purposes only.
User training courses are available, but must not be used as a substitute for
familiarity with this manual.
The MiniMax mobile aluminium tower is a light-weight scaffold tower used
throughout the building and construction industry for both indoor and outdoor access
solutions where a stable and secure platform is required. Ideal for maintenance and
installation work or short-term access, the highly versatile towers provide a strong
working platform for a variety of heights.
Verification and assessment documentation is held by Werner UK Sales &
Distribution Ltd.
Compliances
The MiniMax mobile tower system has been designed, tested,
approved and certified to EN 1004-1:2020.
This instruction manual is in compliance with EN 1004-2-en.
PN00063300_Minimax_IM_RevD 0522.indd 2PN00063300_Minimax_IM_RevD 0522.indd 2 01/06/2022 10:5401/06/2022 10:54

3
minimaxtower.com
1 Safety First
1.2 Tower Designation
Design Code
Load Class (2 = 153kg/m2UDL, 3 = 204kg/m2UDL)
Max. Platform Height Outdoors (m)
Max. Platform Height Indoors (m)
Access Method
A = Stairway, B = Stair ladder, C = Inclined Ladder, D = Vertical Ladder
Clear Height Class (H1 = 1.85m, H2 = 1.90m)
*UDL = Uniformly distributed load
EN 1004 3 6 / 6 XXXD H2
1.3 Maintenance - Storage – Transport
•The MiniMax mobile tower system is robust and requires little maintenance.
•All components and their parts should be regularly inspected to identify
damage, particularly to joints.
•Refer to the MiniMax Inspection Guidance for detailed inspection and
maintenance advice, the guidance is available to download at:
www.minimaxtower.com.
•Threads, hinges, and brace latches may be lubricated with light oil. Ensure oil
does not contaminate climbing or walking surfaces.
•Safety labels should be kept legible. Replacement labels are available from
Werner UK Sales & Distribution Ltd.
•Surfaces should be kept reasonably free of dried paint, plaster etc.
•Use of solvents on wooden platform surfaces and plastic components should
be avoided.
•Components should be stored in clean, dry conditions with due care to prevent
damage.
•During transportation ensure components are not damaged by excessive
strapping forces.
PN00063300_Minimax_IM_RevD 0522.indd 3PN00063300_Minimax_IM_RevD 0522.indd 3 01/06/2022 10:5401/06/2022 10:54

4MiniMax Instruction Manual
2 Building The Tower
2.1 Pre-Assembly Checks
•Check overhead that the area into which the structure is to be erected contains
no obstructions, particularly electrical or radio radiation hazards. The structure is
conductive.
•Ensure the ground on which the mobile access tower is to be erected is capable
of supporting the tower in use.
•Check the surface is level to 0.6°. If not the optional adjustable leg kit must be
used. This allows adjustment up to 210mm.
•Only components specified in this manual shall be used with MiniMax towers.
Check all required components are onsite and in a suitable working condition.
•Damaged components shall not be used and must
be put beyond use and disposed of according to local
regulations.
•Adjustable legs should only be used for levelling purposes and never to gain
extra height.
•Ensure distance from the ground to first climbing rung is less than 400mm.
•Only climb the tower from the inside using the access
method provided.
•This tower provides a work platform. It must not be
used to access other structures.
•Tower scaffolds are not designed to be lifted or suspended.
•Ensure the safe working load on the structure is not exceeded.
5mm
PN00063300_Minimax_IM_RevD 0522.indd 4PN00063300_Minimax_IM_RevD 0522.indd 4 01/06/2022 10:5401/06/2022 10:54

5
minimaxtower.com
•Tools and materials should be lifted using a reliable lifting material (e.g. a strong
rope) employing a reliable knot (e.g. clove hitch) to ensure safe fastening and
always lift within the footprint of the prefabricated tower scaffold (i.e. within the
area bounded by the stabilisers).
•Check this manual is available and its contents familiar to all those involved.
•If assembling outdoors; check the forecast windspeed.
º The assembled tower is certified to wind forces
equating to 27mph, but handling components under
those conditions would be hazardous.
º Also consider the wind funnelling effect of nearby
buildings.
•This structure is designed to be self-supporting under the loading condition
requirements of EN 1004-1:2020 and does not require tying in. Consideration
should be given to potential wind conditions if the tower is left unattended.
2 Building The Tower
27mph
12m/sec
PN00063300_Minimax_IM_RevD 0522.indd 5PN00063300_Minimax_IM_RevD 0522.indd 5 01/06/2022 10:5401/06/2022 10:54

6MiniMax Instruction Manual
2.2 Component Diagram
2 Building The Tower
2 Rung
Guardrail
Frame
End Toe
Board
8 Rung
Frame
Folding
Base
Frame
Castor Adjustable
Leg
Diagonal
Brace
Side Toe
Board
Horizontal
Brace
Instruction
Manual
Trapdoor
Platform
Stabiliser
PN00063300_Minimax_IM_RevD 0522.indd 6PN00063300_Minimax_IM_RevD 0522.indd 6 01/06/2022 10:5401/06/2022 10:54

7
minimaxtower.com
Internal or External Use
Composite
Code 38060600 38061700 38063700 38065800
Working
Height 2.6m 3.7m 5.7m 7.8m
Component
Code Component
Description Component
Weight Platform
Height 0.6m 1.7m 3.7m 5.8m
00060000 Folding Base Frame Mk2 17.6kg 1 1 1 1
37751800 Trapdoor Platform 11.8kg 1 1 2 3
00061600 8 Rung Frame 7.0kg - - 2 4
00061800 2 Rung Guardrail Frame 2.6kg - 2 2 2
00061000 Diagonal Brace 1.9kg - 1 3 5
00062100 Horizontal Brace 1.8kg 3 5 9 13
00063700 Side Toe Board 2.5kg 2 2 2 2
00062900 End Toe Board 1.0kg 2 2 2 2
67040100 SP4 Stabiliser* 4.4kg 4 - - -
31751300 SP7 Stabiliser 3.8kg - 4 4 -
31851300 SP10 Stabiliser 8.8kg - - - 4
33551300 Adjustable Leg** 1.1kg 4 4 4 4
*SP4 stabiliser can be substituted for SP7 stabiliser at 1.7m and 3.7m platform heights.
**Adjustable legs only required if ground is uneven or sloping.
2 Building The Tower
2.3 Quantity Schedule
Internal or External Use
Composite Code 38060600 38061700 38063700 38065800
Pack Code Pack Working Height 2.6m 3.7m 5.7m 7.8m
Platform Height 0.6m 1.7m 3.7m 5.8m
37051800 Base Pack Mk2 1 1 1 1
00062100 Horizontal Brace 3 3 3 3
37251800 2 Rung Guardrail Pack Mk2 - 1 1 1
34151800 2m Extension Pack - - 1 2
67040100 SP4 Stabiliser* 4 - - -
31751300 SP7 Stabiliser - 4 4 -
31851300 SP10 Stabiliser - - - 4
37951800 Adjustable Leg Pack** 1 1 1 1
39451800 Toe Board Pack Mk2 1 1 1 1
Tower Total Self-weight 62.6kg 70.9kg 107.7kg 164.5kg
Max. Exerted Leg Load 82.0kg 90.0kg 99.0kg 107.0kg
Quantity Schedule in Packs
Quantity Schedule in Components
PN00063300_Minimax_IM_RevD 0522.indd 7PN00063300_Minimax_IM_RevD 0522.indd 7 01/06/2022 10:5401/06/2022 10:54

8MiniMax Instruction Manual
2.4 Stabilisers
Platform Height X Y
0.6m 2.06m 2.06m
1.7m 2.77m 2.96m
3.7m 2.77m 2.96m
5.8m 4.42m 4.42m
X
Y
90%
SP4 and SP10 stabilisers must always be fully extended.
Position the lower clamp so that the arm is as close to horizontal as possible. Adjust
the position of the top clamp to ensure the stabiliser foot is in firm contact with the
ground. Ensure the clamps are secure.
2.5 Adjustable Legs
If the ground is uneven or sloping you will need to fit
adjustable legs. Turn the base unit upside down so
that the wheels are facing upwards. We recommend
that two persons are required to ease the process.
Using a 19mm spanner loosen the fixing bolt and
remove the castor from the base.
Follow the instructions in the adjustable leg pack to
change the large castor spigot to the smaller one supplied in the
pack. Insert the castor into an adjustable leg and then retighten
the fixing bolt with the spanner, following the instructions. Repeat
this process for the other castors and adjustable legs. Insert the
four leg and castor assemblies into the base unit.
Turn the base the correct way up with the wheels on the ground.
Use a spirit level to check the base unit is level.
Adjust the legs as necessary, to level the base unit.
Important - Only use the adjustable legs to level the base
and not to gain extra height.
2 Building The Tower
PN00063300_Minimax_IM_RevD 0522.indd 8PN00063300_Minimax_IM_RevD 0522.indd 8 01/06/2022 10:5401/06/2022 10:54

9
minimaxtower.com
2 Building The Tower
2.6 Assembly
This tower structure must be assembled, and components oriented, in accordance
with this instruction manual. Deviation from this instruction manual is not permitted.
THIS TOWER MUST NOT BE USED AS AN ANCHOR POINT
FOR PERSONAL FALL PROTECTION EQUIPMENT.
•To fit the optional adjustable legs, a 19mm spanner is required. No other tools
are needed for assembly.
•The assembly uses the 3T (Through the Trapdoor) method that provides
collective fall protection.
º From the sitting position in the trapdoor opening fit all guardrails before
standing on the platform.
º Fit braces in the locations described and
ensure the claws are locked.
•The tower may be assembled by a single person, but it is recommended that
two or more are used to pass up components on the taller assemblies.
•Components must be lifted within the footprint of the tower using a reliable
method such as a strong rope with a clove hitch knot.
•Castor brakes should be locked as soon as the tower base is in position.
•The tower base should be levelled to within 0.6° before continuing the assembly.
•The adjustable legs are for levelling the tower only and not to be used to gain
extra height.
•Ensure when the base is levelled the distance from the ground to the first
climbing rung is less than 400mm.
•Stabilisers of the size specified in the quantity schedule should be fitted at the
earliest opportunity.
PN00063300_Minimax_IM_RevD 0522.indd 9PN00063300_Minimax_IM_RevD 0522.indd 9 01/06/2022 10:5401/06/2022 10:54

10 MiniMax Instruction Manual
2 Building The Tower
2.6.1 Assembly Procedure for 0.6m Tower
1Ensure brakes on castors of one
end frame are released. Engage
locks on rear folding frame. Ensure all
castor brakes are engaged.
2Fit horizontal brace in position
shown. Check tower is square and
level.
PN00063300_Minimax_IM_RevD 0522.indd 10PN00063300_Minimax_IM_RevD 0522.indd 10 01/06/2022 10:5401/06/2022 10:54

11
minimaxtower.com
2 Building The Tower
3Fit stabilisers as shown. See page
8 for details.
4Fit trapdoor platform and
horizontal braces in position
shown.
PN00063300_Minimax_IM_RevD 0522.indd 11PN00063300_Minimax_IM_RevD 0522.indd 11 01/06/2022 10:5401/06/2022 10:54

12 MiniMax Instruction Manual
2 Building The Tower
5Fit toe boards as shown.
The 0.6m tower is now complete.
PN00063300_Minimax_IM_RevD 0522.indd 12PN00063300_Minimax_IM_RevD 0522.indd 12 01/06/2022 10:5401/06/2022 10:54

13
minimaxtower.com
2 Building The Tower
2.6.2 Assembly Procedure for 1.7m Tower
1Ensure brakes on castors of one
end frame are released. Engage
locks on rear folding frame. Ensure all
castor brakes are engaged.
2Fit horizontal brace in position
shown. Check tower is square and
level.
PN00063300_Minimax_IM_RevD 0522.indd 13PN00063300_Minimax_IM_RevD 0522.indd 13 01/06/2022 10:5401/06/2022 10:54

14 MiniMax Instruction Manual
2 Building The Tower
3Fit 2 rung guardrail frames as
shown. Fit diagonal brace in
position shown.
4Fit stabilisers as shown.
See page 8 for details.
PN00063300_Minimax_IM_RevD 0522.indd 14PN00063300_Minimax_IM_RevD 0522.indd 14 01/06/2022 10:5401/06/2022 10:54

15
minimaxtower.com
2 Building the Tower
5Fit trapdoor platform and
horizontal braces in position
shown.
6Fit toe boards as shown.
The 1.7m tower is now complete.
PN00063300_Minimax_IM_RevD 0522.indd 15PN00063300_Minimax_IM_RevD 0522.indd 15 01/06/2022 10:5401/06/2022 10:54

16 MiniMax Instruction Manual
2 Building the Tower
2.6.3 Assembly Procedure for 3.7m Tower
1Ensure brakes on castors of one
end frame are released. Engage
locks on rear folding frame. Ensure all
castor brakes are engaged.
2Fit horizontal brace in position
shown. Check tower is square
and level.
PN00063300_Minimax_IM_RevD 0522.indd 16PN00063300_Minimax_IM_RevD 0522.indd 16 01/06/2022 10:5401/06/2022 10:54

17
minimaxtower.com
2 Building The Tower
3Fit trapdoor platform and
horizontal braces in position
shown.
4Fit 8 rung frames as shown. Fit
diagonal brace in position shown.
PN00063300_Minimax_IM_RevD 0522.indd 17PN00063300_Minimax_IM_RevD 0522.indd 17 01/06/2022 10:5401/06/2022 10:54

18 MiniMax Instruction Manual
2 Building the Tower
5Fit stabilisers as shown. See
page 8 for details.
6Fit trapdoor platform as shown.
From the protected trapdoor
position, fit horizontal braces as shown.
PN00063300_Minimax_IM_RevD 0522.indd 18PN00063300_Minimax_IM_RevD 0522.indd 18 01/06/2022 10:5401/06/2022 10:54
Table of contents
Popular Rack & Stand manuals by other brands

Grandview
Grandview GPCM-G Series instruction manual

Abicor Binzel
Abicor Binzel iCAT mini operating instructions

SACAGAWEA DESIGNS
SACAGAWEA DESIGNS VK-2109 quick start guide

Innovation First
Innovation First 111-5383 installation instructions

Songmics
Songmics HSR65 manual

NeoMounts
NeoMounts FPMA-D960D instruction manual