
Thrust Bearing
Checking the Axial Clearance 1203−1/A1..........................................................
Removal and Fitting the Thrust Bearing Pads 1224−1/A1.............................................
Engine Stays with Friction Shims: Checking the Pre-tension 1715−1/A1................................
Hydraulic Engine Stays: Oil Pressure Checks 1715−1/A2.............................................
Tie Rod: Checking the Pre-tension and Tensioning the Tie Rods 1903−1/A1...........................
Cylinder Liner and Cylinder Cover Group 2
Cylinder Liner
Measuring Bore Wear 2124−1/A1................................................................
Removal and Fitting of Cylinder Liner or Water Guide Jacket 2124−2/A1...............................
Removing the Wear Ridge, Re-dressing Lubricating Grooves and Scavenge Ports 2124−3/A1.............
Lubricating Quill −Removal and Installation 2138−1/A1...............................................
Piston Rod Gland: Dismantling and Assembling, Measuring the Wear 2303−1/A1......................
Cylinder Cover
Removal and Fitting of Cylinder Cover and Water Guide Jacket 2708−1/A1.............................
Machining of Sealing Surface for Injection Valve 2708−3/A1..........................................
Injection Valve
Removal and Installation 2722−1/A1..............................................................
Disassemble, Checks, Assemble 2722−2/A1.......................................................
Installation of Injection Valve with FAST 2722−1/A2.................................................
Starting Air Valve: Removal, Fitting and Dismantling, Grinding-in & Assembling 2728−1/A1.............
Relief Valve for Cylinder Cover 2745−1/A1...........................................................
Exhaust Valve
Removal and Fitting of Exhaust Valve, Replacing of Elastic Bolts 2751−1/A1............................
Dismantling and Assembling 2751−2/A1...........................................................
Replacing and Grinding the Valve Seat 2751−3/A1..................................................
Grinding the Seating Surface on the Valve Head 2751−4/A1..........................................
Crankshaft, Connecting Rod and Piston Group 3
Crankshaft: Measuring Crank Deflection 3103−1/A1.................................................
Vibration Damper
Taking a Silicone Fluid Sample 3130−1/A1.........................................................
Inspection (GEISLINGER Vibration Damper) 3130−2/A1.............................................
Axial Damper: Dismantling and Assembling 3140−1/A1...............................................
Turning Gear: Checking the Toothing 3206−1/A1.....................................................
Crankcase: Utilization of Working Platform 3301−1/A1...............................................
Connecting Rod
Inspection, Removal and Fitting of Bottom End Bearing 3303−2/A1....................................
X35−B / MM / 2020 Winterthur Gas & Diesel Ltd.