
1. Arrange the layout of your panels and wire, ensuring that:
- 3-port roof cap is no more than 15’ from charge controller
- panel leads can reach 3-port roof cap
- charge controller is no more than 9’ from battery
- panels are not shaded by vents, AC units, or other obstructions
2. Connect 15’ Solar wire(s) to the 3-port roof cap(s).
- Strip the ends of both positive and negative wires ½ inch
- Screw the red (+) wire into corresponding positive terminal, black (-) wire into corresponding
negative terminal.
3. Mount 3-port roof cap(s) and route the 15’ cable(s) from roof to charge controller location
*Do not make connections at this time
4. Proceed to install the wires from both roof caps to the corresponding terminal on the charge
controller , ensuring connection is tight. (2 red on red, 2 black on black) Repeat with battery harness.
*Connect RT-1 wires to charge controller and proceed with RT-1 install as per the manual instructions.
5. Mount your charge controller
6. Install the fuse block onto the positive battery terminal.
7. Connect the positive wire to the fuse block
8. Connect the black wire to the negative battery terminal
9. You may now plug the SAE solar panel leads into the 3-port cap(s) and uncover the panels
10. You are now charging your battery.
11. Configure your charge controller to the proper battery type
Install Instructions:
Install Safety:
- Inspect the installation area for
safety hazards
- Be sure to remove all metal such
as rings and other jewlery
- Dissconnect all power sources
and ensure solar panels are
completely covered by a box or
blanket until installation is done
60A Deluxe Roof Mounted Quick Start Guide
Install Tools:
- Flat head screwdriver
- Philips head screwdriver
- Wire stripper
- Self-Leveling Sealant