Operating elements
1 Mains switch ON „I“ Off „0“
2 Button for Maximum
3 LED Maximum
4 LED Container
5 LED Service
3. Starting operation
Switching on the vacuum system
Turn on the mains switch (1) on the vacuum.
It is possible to leave the mains switch of the vacuum system
in the on position, and perform the switching via the central
voltage supply (laboratory main switch).
Mains switch (1) glows green.
After being switched on, the vacuum system first conducts a
self-test. One after another, all internally connected vacuum
paths are checked with maximum vacuum performance.
Then the filter cartridge is cleaned off.
This operation takes approx. 2 minutes.
The vacuum system is now operational ready. The
connected instruments receive mains voltage.
Start blockade (blinking LED Service (5)
The vacuum system does not start and waits, if:
1. the required pressure of min. 5 bar is not present at the
compressed air connection,
2. the Timer for controlling the dirt container has run out,
(see Chapter 5)
3. a vacuum position opener is not closed because an
instrument on an external vacuum position is switched on
or a manual switch is in the ON position (vacuum).
Switching off the vacuum system
The vacuum system can be switched off by the central
laboratory switch or the built-in mains switch.
Note:
Connected instruments and technical machines can remain
switched on and they will also be without power when the
vacuum system is switched off.