
2
Air )rRP 2ther IndRRr 6SaFes 18
9ent CRnneFtiRn 19
WATER HEATER INSTALLATION 19-22
Water Line CRnneFtiRns 19
TP 9alYe DisFharJe PiSe 19
Installation Diagrams - Top Inlet/Outlet Usage 20
Burner Installation 20
Heater Wiring 21
Gas Piping 22
Gas Line Leak Testing 22
Purging 22
STARTUP AND OPERATION 23
Prior to Start Up 23
SEQUENCE OF OPERATION 23-27
SeTuenFe oIOperation Flow Chart 24
Lighting & Operation Label 25
Adjustments 26
CheFking 9enting 26
CheFking the Input 26
Setting Burner Operation27
MAINTENANCE28-32
9enting System and BarometriFDraIt Control 28
General 28
Remote Storage Tank Temperature Control 28
Temperature-Pressure Relief Valve Test 28
Anode Rod InspeFtion 29
Draining and Flushing 29
ReFommended ProFedure for PeriodiFRemoval or Lime Deposits
from the Tank Type CommerFial Water Heaters 29
DeLiming Solvents 30
Tank Cleanout ProFedure 30
Deliming Using Flo-Jug Method 30-31
Power Burner 31-32
Gas Control Valve 32
SERVICE 32
EleFtriFal ServiFing 32
TROUBLESHOOTING CHECKLIST 33
FOR YOUR INFORMATION 34
Start up Conditions 34
Operational Conditions 34
WATER PIPING DIAGRAMS35-49
MANIFOLD KITS 50
REPLACEMENT PARTS LIST 51-52
NOTES 53-54
WARRANTY 55
TABLE OF CONTENTS
SAFE INSTALLATION, USE AND SERVICE 3
APPROVALS 3
GENERAL SAFETY INFORMATION4-5
PreFautions 5
Grounding InstruFtions 5
Hydrogen Gas Flammable 5
INTRODUCTION 6
Abbreviations Used 6
Quali¿Fations 6
Start Up Requirements 6
Preparing for the Installation 6
FEATURES AND COMPONENTS 7
High Limit SwitFh 7
EleFtroniFIgnition Control 7
BarometriFDraft Control 7
Combustion Chamber Observation Port 7
UnFrating 7
INSTALLATION CONSIDERATIONS 8-12
Rough In Dimensions 8
LoFating The Water Heater 10
ClearanFes 10
Insulation Blanket11
Hard Water 11
CirFulation Pumps 11-12
High Altitude Installations 12
INSTALLATION REQUIREMENTS 13-16
Gas Supply Systems 13
Supply Gas Regulator 13
Power Supply 13
Water Temperature Control and Mixing Valves 13
Dishwashing MaFhines 14
Closed Water Systems 14
Thermal Expansion 14
Temperature-Pressure Relief Valve 14-15
Contaminated Air 15
Air Requirements 15
UnFon¿ned SpaFe 16
Con¿ned SpaFe 16
VENTING INSTALLATION 16-19
Venting 16
BarometriFDraft Control Assembly 16
Fresh Air Opening for Con¿ned SpaFes 17
Outdoor Air Through Two Openings 17
Outdoor Air Through One Opening 17
Outdoor Air Through Two Horizontal DuFts 17
Outdoor Air Through Two VertiFal DuFts 18